Text
~8 RECT~
P
~4
0
Cl
C
O
I
C
0
J7 ++*++
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
In Reply Refer To:
RII:GTG
50-335/79-5
MAR I 81979
Florida Power and Light Company
ATTN:
Dr. R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, Florida
33152
Gentlemen:
This refers
to the inspection
conducted
by
G. T. Gibson of this office on
January
29-30,
1979, of activities authorized
by NRC License
No. DPR-67 for
the St. Lucie Unit
1 facility, and to the discussion
of our findings held
with R. R. Jennings at the conclusion of the inspection.
Areas
examined
during the inspection
and our findings are
discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter'nd the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is
necessary
that
you
make
a written application within
20 days to this office to withhold such information from public disclosure.
Any such application
must include
a full statement
of the
reasons
on the
basis of which it is claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained in a separate
part of the document. If we do not hear
from you in
this regard within the specified period,
the report will be placed in the
Public Document Room.
7904170 5(G
MAR 1 2 1979
Florida Power and Light Company
-2"
Should
you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
ack T. Sutherland,
Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report No. 50-335/79-5
cc w/encl:
Mr. C.
M. Wethy, Plant Manager
St. Lucie Plant
P. 0.
Box 128
Ft. Pierce, Florida
33450
Mr. Nat Weems, Assistant
QA Manager
P. 0.
Box 128
Ft. Pierce, Florida
33450