Forwards IE Insp Rept 50-389/79-01 on 790109-12 & Notice of Violation
ML17206A722
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A720 List:
References
NUDOCS 7904110195
Download: ML17206A722 (3)


See also: IR 05000389/1979001

Text

~R RE@0

(4

P

~4

0

ty'

O

I

O~

/7 ++*++

In Reply Refer To:

RII:RWW

50-389/79-01

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

FEB 8 1 1979

Florida Power

and Light Company

Advanced

Systems

and Technology

Attn:

Dr. R. E. Uhrig, Vice President

P. 0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. R.

W. Wright of this office

on January

9-12,

1979, of activities authorized

by NRC Construction Permit

No.

CPPR-144 for the St. Lucie Unit 2 facility, and to the discussion of our

findings held with Mr. B. J.

Escue at the conclusion of the site inspection

and Mr. J.

E. Vessely at the conclusion of the corporate office inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspectors.

We have

examined actions

you have taken with regard to previously identified

enforcement matters.

These

are discussed

in the enclosed

inspection report.

During the inspection, it was found that certain activities under your

license

appear

to be in noncompliance with NRC requirements.

This item and

references

to pertinent requirements

are listed in the Notice of Violation

enclosed

herewith as Appendix A.

This notice is sent to you pursuant

to the

provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires

you to submit to this

office, within 20 days of your receipt of this notice,

a written statement

or explanation in reply including:

(l) corrective steps

which have been

taken by you and the results

achieved;

(2) corrective steps

which will be

taken to avoid further noncompliance;

and (3) the date

when full compliance

will be achieved.

I

0

FEB 2 1 1979

Florida Power and Light Company

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include

a full statement

of the reasons

on the

basis of which it is claimed that the information is proprietary,

and should

be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear

from you in

this regard within the specified period,

the report will be placed in the

Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

~a=~

Charles

E.

urphy,

hief

Reactor Construction

and Engineering

Support Branch

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/79-01

cc w/encl:

Mr.

CD

M. Wethy, Plant Manager

St. Lucie Plant

P. 0.

Box 128

Ft. Pierce, Florida

33450

Mr. Nat Weems, Assistant

gA Manager

P. 0.

Box 128

Ft. Pierce, Florida

33450