Text
~R RE@0
(4
P
~4
0
ty'
O
I
O~
/7 ++*++
In Reply Refer To:
RII:RWW
50-389/79-01
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
FEB 8 1 1979
Florida Power
and Light Company
Advanced
Systems
and Technology
Attn:
Dr. R. E. Uhrig, Vice President
P. 0.
Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Mr. R.
W. Wright of this office
on January
9-12,
1979, of activities authorized
by NRC Construction Permit
No.
CPPR-144 for the St. Lucie Unit 2 facility, and to the discussion of our
findings held with Mr. B. J.
Escue at the conclusion of the site inspection
and Mr. J.
E. Vessely at the conclusion of the corporate office inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspectors.
We have
examined actions
you have taken with regard to previously identified
enforcement matters.
These
are discussed
in the enclosed
inspection report.
During the inspection, it was found that certain activities under your
license
appear
to be in noncompliance with NRC requirements.
This item and
references
to pertinent requirements
are listed in the Notice of Violation
enclosed
herewith as Appendix A.
This notice is sent to you pursuant
to the
provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires
you to submit to this
office, within 20 days of your receipt of this notice,
a written statement
or explanation in reply including:
(l) corrective steps
which have been
taken by you and the results
achieved;
(2) corrective steps
which will be
taken to avoid further noncompliance;
and (3) the date
when full compliance
will be achieved.
I
0
FEB 2 1 1979
Florida Power and Light Company
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include
a full statement
of the reasons
on the
basis of which it is claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained in a separate
part of the document.
If we do not hear
from you in
this regard within the specified period,
the report will be placed in the
Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
~a=~
Charles
E.
urphy,
hief
Reactor Construction
and Engineering
Support Branch
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-389/79-01
cc w/encl:
Mr.
CD
M. Wethy, Plant Manager
St. Lucie Plant
P. 0.
Box 128
Ft. Pierce, Florida
33450
Mr. Nat Weems, Assistant
gA Manager
P. 0.
Box 128