ML17206A713
| ML17206A713 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/26/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| L-79-73, NUDOCS 7903300342 | |
| Download: ML17206A713 (3) | |
Text
0I~>>
'c REC a TOR Y INFORMATION Dr S TR IB ON S YS TEM (RIDS)
ACCESSION NBRe7903300302 DOCSDATE: 79/03/26 NOTARIZEOe NO
,FACILiS0~335 ST ~
I.UCIE PLANTF UNIT 1 g FLORIDA PONER 8
I.IGHT CO ~
AUTH ~ NAME AUTHOR AFFILIATION UHRIG z R ~ E ~
FLORIDA PONER
& LIGHT COe RKC IP, NAME RECIPIENT AFFILIATION REIDFR AN ~
OPERATING REACTORS BRANCH DOCKET ¹ 05000335 SUBJECT'ESISTANCE TEMP DETECTORS (RTD) st THKRMONKLLS HAVE NOT SEEN RECEIVED,SO VERIFICATION PROGRAM HAS BEEN DELAYED UNTIL JUNE; 1979.TEST REPT SUBMITTALr, EXPECTED IN SEPT.
DISTRIBUTION CODE:
ASSIS COPIES RECEIVED:LTR 'NCL SIZE t
'ITLE:
GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LIC.
NOTES:
RECIPIENT ID CODE/NAME ACTION:
OS BC Qg5%$
INTERNAL 01 REG FILE 5
15 CORE PERF BR 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS EXTERNAL! 03 LPDR 23 ACRS COPIES LTTR ENCL 7
1 16 RECIPIENT ID CODE/NAME 02 NRC PDR 10 TA/EDO 16 AD SYS/PROJ 18 REAC SFTY BR 20 EEB 22 BRINKMAN 00 NSIC COPIES LTTR ENCL 1.
1 1
1 1
APR g
]g7 TOTAL NUMBER OF COPIES REQUIRED !
LTTR 38 ENCIQP o
k Il I 4
II N
'W
P.O. BOX S29100, MIAMI,FL 33152 e~g FLORIDA POWER & LIGHTCOMPANY March 26, 1979 L-79-73 Office of Nuclear Reactor Regulation Attention:
Mr. R.
W. Reid, Chief Operating Reactors Branch ¹4 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Reid:
Re:
St. Lucie Unit 1
Docket No. 50-335 Resistance Tem erature Detectors The purpose of this letter is to update the status of (1) our verification program for measuring Resistance Temperature Detector
( RTD) response time using the Loop Current Step
Response
(LCSR) technique, and (2) additional LCSR surveillance testing of safety-related RTD's.
Florida Power
& Light Company (FPL) letter L-78-346 of October 30,
- 1978, stated that receipt of new RTD's and thermowells (for use in the verification program) was expected in March of 1979.
At present, we have not received the material.
The RTD's are in transit, but the thermowells are not scheduled for shipment until April 13, 1979.
In addition, the Cycle 3
refueling outage is scheduled for April and May.
As a result of the procure-ment situation and the upcoming refueling outage, we have rescheduled
'the verification program to begin in June, 1979.
Testing, including preparation of a test report, is expected to take about three months, therefore, the test report should be submitted by September 1979.
The most recent surveillance testing of the 16 safety-related RTD's was performed in October, 1978.
The results were reported in FPL letter L-79-2 of January 3,
1979.
The testing will be repeated this month before Unit 1 is shutdown for refueling.
Allowing one month for evaluation of the surveillance test results, a
summary report should be submitted by April 30, 1979.