Requests 60-day Extension to Respond to NRC .Ltr Requested Comments & Implementation Schedule for Staff Positions Generated as Result of 781208 Fire Protection Site Visit
ML17206A636
Person / Time
Site: Saint Lucie 
Issue date: 01/26/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
L-79-23, NUDOCS 7902010152
Download: ML17206A636 (4)


Text

DOCKET PP 0500033 DISTRIBUTION CODE-A006S COPIES RECEIVED-LTR +

ENCL SIZE:

TITLE: FI RE PROTECTION I HFORMATION (AFTFR ISSUANCE OF OP -LIC- )

NOTES

~

/

REGULATORY INFORMATION DISTRIBUTION SYSTEM (R IDS)

ACCESSION NBR:790201015%

DOC.DATE: 79/Of/26 NO')PRIZED-NO FACIL:50-335 St. Lucie Plant-l, Florida Power 8, Light Co.

AUTH ~ NAME AUTHOR AFFILIATIOH UHBIG, R.E.

Florida Power 8, Light Co.

BECI P.NAME RECIPIENT AFFI I IATI()N REID,B.W.

Operating Reactors Branch 4

SUBJECT:

Bequests 60 day extension to respond to NRC 781,229 ltr.Ltr requested comments

8. implementation schedule for staff positions generated as result of 781208 fire protection site visit.

RECIPIENT ID CODE/NAMF ACTION:

05 BC 0/fg W /

INTERNAL: 0 BEG FI 09 12 AUXIL SYS BR 19 HAMHACH 21 AD SYS/PROJ EXTERNAL: 03 LPDB 0

22 ACBS COPIES LTTR ENCL 1

2 2

I I

1 1

1 1

16 1

BEC IP I EHT ID CODE/NAME 02 NBC PDR 11 TA/EDO 14 PLANT SYS BR 20 MUBANAKA,R OELD 04 NSI C COP I ES LTTR ENCL F'Ea 5 )979 D

TOTAL NUMBER OF COPIES REQUIRED:

LTTB 38 ENCL

0

~ /

FLORIDAPOWER & LIGHTCOMPANY Office of Nuclear Reactor Regulation Attention:

Nr. Robert W. Reid, Chief Operating Reactors Branch k'4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Hr. Reid:

January 26, 1979 L-79-23 Re:

Fire Protection Review St. Lucie Unit No.

1 Docket No. 50-335 Your letter of December 29, l978,,forwarded the results, of the NRC's December 8, 1978 fire protection site ',visit and request'ed

'our comments and implementation schedule for the staff positions generated as a result of that meeting within 30 days of receipt of your letter.

j The letter contains 43 staff positions to-each of which FPL must respond by committing to implement the specific position, proposing an acceptable alter-native resolution with justification, 'or providing a basis by which the present fire protection program addresses'he position without further action.

In many cases, an extensive engineering evaluation is necessary to provide the information necessary for FPL's decision-making.

Once that decision is

made, considerable effort is likewise required to develop a schedule which is both reasonable and realistic.

On the basis of our preliminary review, we believe that an additional 60 days is required to provide a response of that magnitude.

We do not believe that such a submittal schedule is unreasonable in light of the history of the fire protection review for St. Lucie 1.

In response to NRC's request, FPL performed an extensive and very detailed Fire Hazards Analysis for the plant and submitted it for NRC review on March 31, 1977.

That analysis provides much of the information necessary for demonstration of the adequacy of the existing fire protection program at St. Lucie 1.

Since early 1977, a number of site visits have been tentatively scheduled and subsequently postponed.

Nearly two years after discussions concerning a fire protection site visit to St.

Lucie, 1 began, the long awaited visit finally occurred.

To impose upon FPL a requirement to respond to the 43 staff positions within 30 days of their receipt, in light of the slippage in schedule which the review has

seen, is both unreasonable and unduly burdensome.

Accordingly, we will provide our response and an implementation schedule for the staff's fire protection positions by April 3, 1979.

Yours ver

truly, obert f. Uhrig Vice President gp"ULIITG<~YDOCKET FjLE COPv cc: