Forwards Insp Repts 50-237/91-09 & 50-249/91-08 on 910216-0402 & Notice of Violation
ML17202V063
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/18/1991
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17202V064 List:
References
NUDOCS 9104230373
Download: ML17202V063 (2)


See also: IR 05000237/1991009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

-799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

Docket No.

50-2~7

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

-

Senior Vice President

_-Opus West II I

- 1400 Opus Place

Downers Grove, IL

60515

Gentlemen:

0 /-01.

This refers to the routine safety inspection conducted by D. Hills, M. Peck,

M. Kunowski; and J. Mqnn1nger of this office and assisted.by R. Zuffa of

the *Illinois Department of Nucle*ar Safety on February 16, 1991 through

April 2, 1991, of acti~ities at Dresden Nuclear Power Station, Units 2 and 3

authorized by NRC Operating License Nos. DPR-19 and DPR-25 and to the

discussion of our findings with Mr. E. Eenigenburg and others at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspectioh.

Within these areasj the inspection consisted of a selective

examination of procedures and representative records, observations~ and

inte,rviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice.

A written response

is required.

However, because the NRC wants to encourage and support

licensee's initiatives for self-identification and correction of problems, the

NRC will not generally issue a Notice of Violation for a violation _that meets

the requirements of 10 CFR 2, Appendix C, Section V.A.

This is the case with

the violations discussed in paragraphs 2; 8.a~ 8.c and 9 of the enclosed

inspection report.

If you do not agree with our statement of your corre~tive

actions, you are requested to inform us, in writing, within 30 days of the

date of this letter. Otherwise, no reply to the non-cited violations is

required and we have no further questions regarding thii matter at this time.

In accordance with 10 CFR 2.790, of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document Rao~.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511;

9104230373 910418

PDR

ADOCK 05000237

G

PDR

rf3.a(

l ( (

Commonwealth Edison Company

2

APR 1 s 1991

We will gladly discuss any questions you have* concerning this inspection.

Enclosures:

1.

Notice of Violation _

2.

Inspection Reports

No. S0-237/91009(DRP);

No. S0-249/91008(DRP)

cc w/enclosures:

D. Galle, Vice President -

BWR

-

Operations

-

T. Kovach, Nuclear Licensing Manager

E. D. Eenigenburg, St~tion Manager

DCD/DCB (RIDS)

-

OC/LFDCB

_

_ _

Resident Insp~ctors LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

Robert Newmann, Office of Public

Counsel, State of Illinois Center

C. J. Paperiello, R1II

Sincerely,

u) p>J,a;A~v

W. D. Shafe~~1ef --_-

Reactor Projects Branch 1