ML17202L270
| ML17202L270 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/12/1990 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17202L271 | List: |
| References | |
| NUDOCS 9006200199 | |
| Download: ML17202L270 (2) | |
See also: IR 05000237/1990015
Text
'*
- Docket No. 50-237.
Docket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
JUN 12 1990
This refers to the routine safety inspection conducted by Ors. R. B. Holtzman
and J. E.
House~f this office onsite on Aprtl 23-27, 1990, and continued
inoffice through June 1, 1990, .of activities at the Dresden Nuclear Power
- Station, Units 2 and 3 authorized by NRC Operating Licenses No. DPR-19 and
No. DPR-25 and to the discussion of our findings with Mr. E. D. Eenigenburg *
and others of your staff at the conclusion of the onsite portion of the
inspection and.with Mr. D. Morey and pthers of your staff on May 5 through
June 1, 1990.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within thes~ areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
In addition, our Mobile Laboratory was at the site
during the inspection to .perform independent measurements of radioactivity.
No violations of NRC requirements were identified during the co~rse of this
inspection.
In accordance with 10 CFR 2~790 of the Commission's r.egulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
L~Chief
Reactor Programs Branch
Enclosure:
Inspection Reports
- No. 50-237 /90015( DRSS);
No. 50-249/90014(DRSS)
See Attached Distribution
RIII
(~
9nnA200199 900612
F**6~-
ADOCK n~000237
- -
F'DC
G!
~her
RIII
- ~er
~/t.z/90
... *
Commonwealth Edison Company
Distribution
cc w/enclosure:
D. Galle, Vice President ~ *awR
Ope rat ion*s
,
T~ Ktivach, Nuclear
Licensing Manager
E. D. Eenigenburg, Station Manager
DCD/DCB* (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. Mccaffrey, Chief, Public
Utilities Division
. Robert Newmann, Asst. Director
State of Illinois
2 JUN 1 E 19Sv