Advises Setpoints Correct,Adequate Design Basis Provided & Current Controls Adequate,Based on Review of Response to Allegation RIII-A-89-0039.Actions Complete & Allegation Closed
ML17202G558
Person / Time
Site: Dresden, Quad Cities, Zion, 05000000
Issue date: 07/20/1989
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17202G559 List:
References
NUDOCS 8908110376
Download: ML17202G558 (2)


Text

}

Docket No. 50-237; 50-249 Docket No. 50-254; 50-265 Docket No. 50-295; 50-304 Corrunonwealth Edison Company ATTN:

Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

JUL J O 1999 We have ~e~iewed your response regarding an allegation we forwarded to you by our letter dated April 21, 1989 (copy attached).

Our correspondence requested your review and followup on an allegation concerning certain calculations associated with changes to the ori~inal instrumentation setpoints for the Average Power Range Monitors (APRMs) at the Dresden, Quad Cities, and Zion plants (RIII-89-A-0039).

Your letter of June 22, 1989, (copy attached) describes the action your staff took to resolve the setpoint calculation issue.

Following a conversation.

with Mr. J. J. Harrison of my staff, the scope of the NRC's request was expanded to verify other selected major setpoints.

We have reviewed your action plan, site specific results, setpoints design bases, and conclusions.

Our review has determined that your setpoints are correct, have an adequate design bases, and your current controls appear to be adequate.

We understand that you plan to continue your corporate setpoint control review to upgrade the current program through enhancements and standardization.

No. violation of NRC requirements were identified.

We therefore consider the actions of CECo and the review of the NRC to be complete and this allegation (RIII-A-89-0039) closed.

Attachments:

As stated See Attached Distribution 890811Q)?~ ~~g~~g37 PDR. ADU~K ----F*r1r_:

p G:

R~:j-

_}III i°'

ifi:yJ RII (,l Harrison/jp ~

~ lJa~~

07 /-0)/89 1pvl*:

Sincerely, itllMS

  • agW1 **AD tw" W~ D. Shafer, Chief
  • Reactor Projects Branch 1

-s:: f () \\

)

Commonwealth Edison Company Distribution cc w/attachments:

T. J. Maiman, Vice President, PWR Operations D. Galle, Vice President, BWR Operations T. Kovach, Nuclear Licensing Manager E. D. Eenigenburg, Dresden Station Manager R. L. BaK, Quad Cities Station Manager T. joyce, Zion Station Manager C. Patel, Project Manager, NRR, Zion B. Siegel, Project Manager, NRR, Dresden T. Ross, Project Manager, NRR, Quad Cities DCD/DCB (RIDS)

Licensing Fee Management Branch S. DuPont, SRI, Dresde~

R. Higgins, SRI, Quad Cities J. D. Smith, SRI, Zion DCD/DCB (RIDS)

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division 2

JUL Z O 1989

    • .-.-.,~..,,.