I
I
~
Docket No. 50-237
Docket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. A. S. Gautam and
other NRC representatives of this office on April 3 through May 24, 1989, of
activities at the Dresden Nuclear Power Station authorized by NRC Licenses
No. DPR-19 and No. DPR-25 and to the discussion of our findings with
Mr. E. D. Eenigenburg at the conclusion of the site inspection.
The purpose
of this inspection was to review the licensee
1s corrective action regarding
previously identified environmental qualification 10 CFR 50.49 related issues.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
It is our understanding based on LER 89-005, that certain EQ equipment may be
unqualified due to a lack of physical inspections during the implementation of
your EQ program.
As an interim resolution to these findings, you have prepared
a Justification For Continued Operation (JCO) for the suspect equipment not yet
physically inspected.
In addition, you have committed to performing physical
inspections during the operation of Units 2 and 3, and to complete all of the
reviews under your LER corrective action program by the end of your next outage
in September 1989.
It is also our understanding that you now plan to shift the onsite EQ activities
to the Technical Staff Department, assign EQ activities to several inspectors by
September 1989, and further review QA/QC involvement in EQ activities.
No violations of NRC requirements were identified during the course of this
inspection .
8906200179 890609
F
1.;DR
ADOCK 05000237
- <
I.
Commonwealth Edison Company
2
JUN
9 1933
In accordance with 10 CFR 2.790 of the Commission 1 s regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Reports
No. 50-237/89010(DRS); and
No. 50-249/89009(DRS)
cc w/enclosure:
T. Kovach, Nuclear
Licensing Manager
E. D. Eenigenburg, Station Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
M. Kopp
RIII
~\\\\'5-Ir
Gautam/jaw
~ _,.\\, -- '6'\\
Sincerely,
-:::::~:= :.:~:..-.::.: : -~ =~;_:*::; ~:: ::-:~: --~--'~:] ';i *.
- _;:~ij~ ~~.:.--:
H. J. Miller, Director
~
Division of Reactor Safet.1" '
RIII