ML17201M306

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-237/88-30 & 50-249/88-31 on 871022-890120.No Violations Noted
ML17201M306
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/23/1989
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17201M307 List:
References
NUDOCS 8902010078
Download: ML17201M306 (2)


See also: IR 05000237/1988030

Text

UNITIO STA!lS

.

C9::r:k~ .S"f): ts7/e-t-oJc

. NUCLEAR RECULATORY COMMISSION

~ C'J- Z4-"f /

AICIOHlll

. ~fa

l'h"<J.Jf

70 ttOOHVl\\.T ltOAO

§74$

CH.EN 11.1.YN, 11.1.INOIS 60127

.j

EXHIBIT

~O"

JAN 2 3 1989

Docket No. 50-237

Docket No. 50-249

10 CFR 2.790 INFORMATION

WT'T'HHOLD FROM PUBLIC DJSCLOSURF

Co1!111onwealth Edison Company

ATTN:

Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. J. Holmes of

this office on October 22-23, 1987; May 5-6, 11, 12 and December 21*23, 1988;

and January 20, 1989, of activities at Dresden Nuclear Power Station,

Units 2 and J authorized by NRC Operating Licen$es No. OPR-19 and No. OPR-25

and to the discussion of our fihdings with Mr~ E. D. Eenigenburg at the

conclusion of the inspection. Th1s inspection was conducted to review

/allegations regarding deficiencies 1n fire wrap installations and the

training provided to new installers.

The enclosed *copy of our inspection report identifies areas examined dur1ng

the inspection. Within thes~ areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personne1.

/-No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the C0111'111ssfon's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspe~t1on.

Enclosure:

Inspection Reports

No. 50*237/88030(DRS);

No. 50-249/88031(0RS)

See Attached Distribution

J, J. Harrison, Chief

Eng1neer1ng Branch

Corrmonwe41th Edison Company

Distrubtf on

cc w/enc1osure:

H. B11SSt Nuclear

Licensing Manager

J. Eenfgenburg. Plant Manager

DC0/0C8 (RIOS)

Licensing Fee Management Br4nch

Resident Insp~ctor, RIII

Richard Hubbard

J. W. Mccaffrey, Chief, Publfc

Utilities Division

2

10 CFR 2.790 INFORMATION

WITHHOLD FROM PUBLIC DISCLOSURE

JAN?~ t989