Forwards Emergency Operating Procedure Team Insp Repts 50-237/88-12 & 50-249/88-14.Plans & Corrective Actions Re Technical,Human Factor & Mgt Control Issues Should Be Provided within 30 Days of Ltr Date
ML17201J408
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/18/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17201J409 List:
References
NUDOCS 8808290004
Download: ML17201J408 (4)


See also: IR 05000237/1988012

Text

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

AUG 1 8 19SB

SUBJECT:

.. EMERGENCY OPERATING PROCEDURE TEAM INSPECTION (NRC COMBINED

TEAM INSPECTION REPORTS NO. 50-237/88-12 AND NO.

50~249/88-14)

This refers to the inspection of Dresden Emergency Operating Procedures

by an NRC team led by Mr. Donald J. Florek on May 31 through June 8, 1988,

of activities at Dresden Nuclear Power Station, Units 2 and 3 authorized

by NRC Operating Licenses No. DPR-19 and No. DPR-25 and to the discussion

of our findings with Mr. E. Eenigenburg and others of your staff at the

conclusion of the inspection ..

The enclosed copy of bur inspection report identifies areas examined during

the inspection .. Within these areas, the inspection cons1sted of a selective *

examination of procedures and representative reco~ds, observations, and

interview with personnel.

During this inspection, certain of your activities appear to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In addition, this report identifies additional findings and

observations in the Dresden Emergency Operating Procedures relating to

technical issues, human factor issues, and management control issues.

At the exit meeting, your staff described the short and long term actions

that will be taken to correct the items.

We request that you formally

transmit your plans and corrective actions related to the inspection findings

within 30 days of the date of this letter.

In accordance with 10 CFR 2. 790, of the Commission

1 s regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance-procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511..

8808290004 880818

-CR

A~1c11~v o_~_.n_r.>0237

P I '

i.; - -*r*.

P[IC

Q

  • .*. \\

AUG 1 s 1989

Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Enclosures:

1.

Notice of Violation

2.

Inspection Reports

No. 50-237/88012(DRS); and

No. 50-249/88014(DRS)

cc w/enclosures:

H. Bliss, Nuclear

Licensing Manager

J; Eenigenburg, Plant Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, Riil

Richard Hubbard

J. W. McCaffrey, Chtef, Public

Utilities Division

bee w/enclosures:

W. Regan, NRR/LHFB

~

Lavy

'1{15188

Sincerely,

0

4 r* "('11 .. J :1 f

,

,

  • t\\i.~ii~~'" S.:~~£p .~!~. GEOffiiE'f c.., wrucwr

.... *- .... ****-*---***-* ...

Geoffrey C. Wright, Chief

Operations Branch

Commonwealth Edison Company

CZ:

Gallo

~;\\ /88

RI:DRP

Wright

71

88

2

l.

U.S. NUCLEAR REGULATORY COMMISSION

REGION II I

Report Nos.

50-237/88-12

50-249/88-14

Docket Nos.

50-237

50-249

Licensee:

Commonwealth Edison Company

P.O. Box 767

Chicago, Illinois 60690

License

Facility Name:

Dresden Nuclear Power Station, Units 2* and 3

Inspection At:

Dresden Site, Morris, Illinois

Inspection

Team Leader: *

Inspectors:

Senior Operations Engineer

h, DRS, Region I

R. Evans, Reactor Engineer, Region IV

P. Kaufman, Dresden Resident Inspector

C. Sisco, Operations Engineer,. Region I

A. Sutthoff, Human Factors Specialist

W. Hansen, Consultant, NRC

Nos.

DPR-19

DPR-25

  • Approved by: .~Jk

. 8/2188

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Region I

Date

Inspection Summary

Inspection on May 31, 1988 through June 8, 1988

(Report *Nos. 50-237/88-12; 50-249/88-14

Areas Inspected: . Special announced team inspection of Dresden Emergency

Operating Procedures (OEOPs) to include a comparison of the DEOPs with the BWR

Owners Group Emergency Procedure Guidelines (EPGs) for technical adequacy,

review of the OEOPs by control room and plant walkdowns, evaluation of the

DEOP~ on the plant simulator, human factor analysis, review of the validation

verification program, review of the on-going evaluation program of DEOPs, QA

measures in the DEOP program, and an assessment of the containment venting

provisions.

Results:

See executive summary in report.