SALP Repts 50-237/88-01 & 50-249/88-01 for Jan 1987 - Jan 1988.Overall Ratings in Affected Areas Unchanged
ML17201J337
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/30/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17201J336 List:
References
50-237-88-01, 50-237-88-1, 50-249-88-01, 50-249-88-1, NUDOCS 8807130025
Download: ML17201J337 (3)


See also: IR 05000237/1988001

Text

APPENDIX

SALP BOARD REPORT

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

50-237/88001; 50~249/88001

Inspection Report No.

Cormnonwealth Edison Company

Name of Licenee

Dresden Station

Name of Facility

January 1, 1987 through January 31, 1988

Assessment Period

8807130025 880630

PDR

ADOCK 05000237*

0

PDC

SALP 7

DRESDEN STATION

A.

Summary of Meeting with Commonwealth Edison on May 2, 1988

The findings and conclusions of the SALP Board are documented in Report

No. 50-237/88001; 50-249/88001 and were discussed with the licensee on

May 2, 1988, at the Dresden Station in Morris, Illinois. The licensee's

regulatory performance was presented and found acceptable in each

functional area.

We plan to closely monitor trends in your station

improvement plan, both at the station and at meetings with you.

While the meeting was primarily a discussion between the licensee and

NRC, it was open to members of the public as observers.

The following licensee and NRC personnel were in attendance, as well

as the noted observer~.

Cormnonwealth Edison Company

B. L. Thomas, President

C. Reed, Senior Vice President

L. 0. DelGeorge, Assistant Vice President

N. J. Kalivianakis, General Manager (BWR)

E. D. Eenigenburg, Station Manager

H. Bliss, Nuclear Licensing Manager

J. Zucchi, Assistant Station Security Administrator

0. Farrar, Technical Services Manager

R. Bishop, Operations Assessments

G. Wagner, Production Services MGR

G. Diederich, Station Manager - LaSalle

J. Silady, Nuclear Licensing Administrator

D. Shoyer, Waste Systems Engineer

T. Cresla, Assistant Supt - Work Planning

D. Adam, Rad-Chem Supervisor

0. Wheeler, Site Superintendent - PAES

S. Stiles, Training Supervisor

B. Geir, Q.C. Superintendent

R, Ralph, Licensing Engineer

J. Acterberg, Technical Staff Supervisor

J. Mayer, Station Security Administrator

C. Schroeder, Services Superintendent

J. Wojciga, Production Superintendent

L. Gerner, Superintendent - Performance Improvement

J. Bitel, Manager - Nuclear Safety

K. Yates, On Site Nuclear Safety

B. Zank, Operating Engineer

W. Betourne, QA

R. *Stols, QA Engineer

J. Brunner, Assistant Superintendent - Technical Service~

J. Kotowski, Assistant Superintendent - Operations

D. Booth, Master Electrician

G. Wink, Master IM

M. Strait, Master MM

R. Meadows, Maintenance Staff Supervisor

G. Griffiths, Storero_onj Supervisor.

E. Dennis, District Supervisor

G. Smith, Operating Engineer

S. Kerr, IR

J. Krisch, Personnel Supervisor

E. Armstrong, Regulatory Assurance Supervisor

R. Tuetken, PACS, Construction Manager - BWR

A. Kief, Senior Financial Coordinator

K. Brennan, Regulatory Assurance Group Leader

D. VanPelt, Assistant Supervisor Maintenance

J. Coonan, Maintenance Improvement

R. Jeisy, INPO Coordinator

W. Shewski, Manager, Quality Assurance

V. Gengler, Station Security Force Supervi$or

U.S. Nuclear Regulatory Commission

A. Bert Davis, Regional Administrator

W. L. Forney, Chief, Reactor Projects Branch 1

M. A. Ring, Chief, Reactor Projects Section lB

M. Grotenhuis, Project Manager

S. DuPont, Senior Resident Inspector

P. Kaufman, Resident Inspector

D. Jones, Project Inspector

R. Lickus, Chief, State and Government Affairs

Illinois Department of Nuclear Safety

Robert D. Schulz, Section Chief

B.

Comments Received from Licensee

Commonwealth Edison's response to the Dresden SALP 7 Board Report

dated June 1, 1988, had no comments addressing the specific content of

the report.

Because there are no comments, this Appendix contains no

changes to the SALP Report.

C.

Regional Administrator's Conclusions Based on Consideration of Licensee

Comments

I have concluded that the overall ratings in the affected areas have

not changed.