Discusses 880107 Telcon Between Ld Butterfield,Nrr & Region III Informing NRC of Number of Containment Penetrations Due for App J,Type B or C Tests & Not Tested
ML17199U306
Person / Time
Site: Dresden 
Issue date: 02/05/1988
From: Holahan G
Office of Nuclear Reactor Regulation
To: Butterfield L
COMMONWEALTH EDISON CO.
References
NUDOCS 8802190085
Download: ML17199U306 (2)


Text

...

n,

..J::~

.. J Docket No. 50-249

-~"

,\\

Mr. L. D. Butterfield, Jr.

Nuclear Licensing Manager Cormnonwealth Edison Company Post Office Box 767

Dear Mr. Butterfield:

SUBJECT:

APPENDIX J TESTS :

February 5, 1988, Re:

Dresde-ri Nuclear Power Station, Unit 3 On January 7, 1988, a conference call was held between CECo (Butterfield, et al.) NRR (Holahan et al.) and Region III (Norelius et al.). The ca 11 was to inform the NRC staff that a number of containment penetrations which were due for Appendix J type B or.C tests' had not been tested.

Base.d on the information presented., the staff concluded that Dresden Unit 3 could continue _operation P".'Ovided the following requirements wo~ld b~ met:

1.
2.

All penetrations. that could.be tested while the station was *in operation should be tested, The leakage history of the remaining penetrations that were due for testing or would betome due for testing prior to shutdown bn

  • March 26, 1988, and could not be tested while in operation, would:.*

be submitted as a part of an exemp~ion request;

3.

T~e exemption request would* be submitted by Monday, January 11, 1988, for the penetrations which were due for testing before March 26,* 1988, and which cannot be tested *during operation,

\\_

4.
5.
6.

The failure to test penetrations which were due for testing prior to

, January.7, 1988, would be considered 1n a separate enforcement action, The total estimated leak Hmit would be provided, All possible penetrations would be tested should there be. a plant shutdown, and eeo219ooas **aao*20s :.,.,.

,

  • PDR. ADOCK 05000249'.

P - -

RDR. : I. *

  • ' {

I

---~-

---:-:...:~ ~:.-::~

- --~'

....~-.

t

\\~'

2

7.

CECo would provide information regarding the status of the same tests for other CECo plants.

Items 1, 2, 3, 5, and 7 have been completed by CECo and it has committed to Item 6.

Consistent with the conference call on January 7, 1988 the staff has concluded that Dresden Unit 3 may continue operation while the exemption is processed.

DISTRIBUTION CD.o_ckt..1; le NRG & Local PDRs PDIII-2 Rdg. File GHolahan Lluther MGrotenhuis OGG-Bethesda EJordan JPartlow ACRS {10)

PDIII-2 plant File B. Davis, RU.I C~ Norelius: RIII W. Forney, RI 11 M. Ring, Rin*

POI I I-2: LA./1' Lluther ~

2/ -.> /88 PDIII-~

MGro;enhui s 2/ s /88 Sincerely,

/s /

Gary M. Holahan, Assistant Director for Regions III and V Division of Reactor Projects - III, IV, V and Special Projects

~J_