Revised Notice of Violation from Insp on 870803-07.Violation Noted:Contrary to 10CFR50.47(b)(8),emergency Plan & Procedure Revs & Other Controlled Documents Not Filed or Properly Maintained
ML17199S969
Person / Time
Site: Dresden, Braidwood, LaSalle, 05000000
Issue date: 09/18/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17199S968 List:
References
50-237-87-28, 50-249-87-27, 50-373-87-25, 50-374-87-25, 50-456-87-26, 50-457-87-26, NUDOCS 8709240188
Download: ML17199S969 (1)


Text

NOTICE OF VIOLATION Commonwealth Edison Company Docket Nos. 50-456; 50-457 Docket Nos. 50-237; 50-249 Docket Nos. 50-373; 50-374 As a result of the inspection conducted on August 3-7, 1987, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1985), the following violation was identified:

10 CFR 50.47(b)(8) requires each licensee to maintain adequate emergency facilities and equipment to support an emergency response.

Contrary to the above, on August 4, 1987, the inspectors toured the Mazon Emergency Operations Facility and found that controlled reference documents (emergency plans, offsite emergency organization and station procedures) and aperture cards containing plant systems drawings for the Braidwood, Dresden and LaSalle Stations were stacked on several tables and had not been properly maintained.

Unfiled aperture cards from each station were date stamped as early as March 1987.

Unfiled plan and procedure revisions for the Braidwood

  • and LaSalle Stations were dated as early as March and April 1987, respectively.

This is a Severity Level IV violation (Supplement VIII).

Pursuant to the provisions of.10 CFR 2.201, you are requi~ed to submit to this office within thirty days of the date of this No.tice a written statement or explanation in reply, including for each violation:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

~-/tY-81 Dated w.~~~hief Emergency Preparedness and Radiological Protection Branch