ML17199F859

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-237/86-16,50-249/86-19 & 30-18425/86-01 on 860630-0710.Violation Noted.Proposed Enforcement Action Based on Findings of Insp Will Be Forwarded Under Separate Cover
ML17199F859
Person / Time
Site: 03018425, Dresden
Issue date: 07/28/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17199F860 List:
References
NUDOCS 8608010232
Download: ML17199F859 (2)


See also: IR 05000237/1986016

Text

Docket No. 50-237

Docket No. 50-249

Docket No. 30-18425

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

JUL 28 1985

This refers to the routine safety inspection conducted by Messrs. D. E. Miller

and W. J. Slawinski of this office during the period June 30 through July 10,

1986, of activities at Dresden Nuclear Power Station, Units 2 and 3, authorized

by NRC Operating Licenses No. DPR-19 and No. DPR-25, and materials under

Byproduct Materials License No. 12-05650-19 at the Mazon Emergency Offsite

Facility, and to the discussion of our findings with Mr. Kalivianakis and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements.

We are releasing this report at this time for your

information.

You will be notified by separate correspondence of our decision

regarding enforcement action based on the findings of this inspection .. No

written response is required until you ar*e nu Li ri ed of the proposed enforcement

action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, and the enclosures will be placed in the NRC Public Document Room .

I'

Commonwealth Edison Company

2

JUL 28 1~d6

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-237/86016(DRSS);

No. 50-249/86019(DRSS)

cc w/enclosure:

D. L. Farrar, Director

of Nuclear Licensing

D. J. Scott, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

RIII

Sl awi nski/kja

IU(!-,J.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

1fJ-

Ri!J fai

w~

B yd

Schultz