ML17199F697

From kanterella
Jump to navigation Jump to search

Accepts Util Plan Re Recirculation Pipe Replacement. TAC 58001 Considered Closed
ML17199F697
Person / Time
Site: Dresden Constellation icon.png
Issue date: 03/24/1986
From: Gilbert R
Office of Nuclear Reactor Regulation
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
TAC-58001, NUDOCS 8603280080
Download: ML17199F697 (3)


Text

'

Docket No. 50-249 MEMORANDUM FOR:

I

,/II,,,,_,,;

FROM:

SUBJECT:

John A. Zwolinski, Director BWR Project Directorate #1 Division *Of BWR Licensing Robert A.

Gilbert~ Project Manager BWR Project Directorate #1 Division of BWR Licensing CLOSEOUT OF NRR LICENSING ACTIVITY RELATING TO THE PLANNING PHASE OF THE DRESDEN UNIT 3 PIPE REPLACEMENT PROGRAM (TAC 58001)

~:- In l eiters dated June 3, 1985, June 13, 1985, September 30, 1985 and

-~" *

  • January 2.4; 1986, Commonwealth Edison Company (CECo) submitted documents *

,~*

- "relating to the planning for the Recirculation Pipe Replacement at Dresden>, -._,..

  • Unit 3 including the ALARA planning.

The September 30 letter *responded to t:

  • _questions raised at a meeting held on July 23, 1985 (Meeting Summary issued *. ~
'.: * \\,August 5, 1985) relating to the program.

Although no formal staff response

.:-~ J :*\\

  • h~s b~~n mad~ to CECo b~sed on the activities described above, CECo was iriformed*verballv on a number of occasions that the staff found the

..,Recirculation Pipe Replacement Program satisfactory. A Region III Inspecti~n

~eport (85-25) dated November 6, 1985 also evaluated the program and found no*violations or deviations.

This memorandum presents a summary of the formal staff review of the plan and a copy will be sent to CECo.

The staff found the plan acceptable and with the issuance of the memorandum,*TAC 58001 can be closed out.

cc:

See next page DISTRIBUTION

'7.~D_o-c ke.i_I_iJg. -'

NRC PDR Local PDR BWD#l Reading OELD RBernero EJordan BGrimes JPartlow CJamerson RGil bert JZwolinski ACRS (10)

DBL:~

RGi1brr~~tm 31~1186

~;S

~itB~ ~

Robert A. Gilbert, Project Manager BWR Project Directorate #1

. Division -of BWR Licensing

Docket No. 50-249 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555

. March 24, 1986 MEMORANDUM FOR:

John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensinq FROM:

Robert A. Gilbert, Project Manaqer RWR Project Directorate #1 Division of BWR Licensing SUBJ~CT:

CLOSEOUT OF NRR LICENSING ACTIVITY RELATING TO THE PLANNING PHASE OF THE DRESDEN UNIT 3 PIPE REPLACEMENT PROGRAM (TAC 58001)

In letters dated June 3, 1985, June 13, 1985, Seotember 30, 1985 and Januar.v 24, 1986, Commonwealth Edison Compan.v (CECo) submitter! documents relating to the planninq for the Recirculation Pioe Replacement at Dresden Unit 3 includinq the ALARA planninq.

The September 30 letter responded to questions raised at a meeting held. on July 23, 1985 (Meetinq Summary issued Auqust 5, 1985) relating to the proqram.

Although no formal staff resnonse has heen made to CECo basen on the activities described above, CECo was informed verbally on a number of occasions that the staff found the Recirculation Pipe Replacement Proqram satisfactory. A Reqion III Inspection Report (85-25) dated November 6, 1985 also evaluated the program and found no violations or deviations.

This memorandum presents a summary of the formal staff review of the plan and a copy will be sent to CECo.

The staff found the plan acceptable and with the issuance of the memorandum, TAC 58001 can be closen out.

cc:

See next paqe Robert A. Gilbert, Project Manager RWR Proiect Directorate #1 Division of RWR Licensinq

  • ~-.. *" \\'.

a cc:

Robert G. Fitzgibbons Jr.

Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. Douq Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Boarrl of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Reqional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Gary N. Wright, Manaqer Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park nrive, 5th Floor Springfield, Illinois 62704 Mr. Dennis L. Farrar Director of Nuclear Licensin9 Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690