- Docket No. 50-237
Docket No .J]:o-2ID
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
P. 0. Box 767
Chicago, IL
60690
Gentlemen:
APR 2 6 1985
This refers to the routine safety inspection conducted by Mr. S. M. Hare of
this office on March 27 through April 17, 1985, of activities at Dresden
Nuclear Power Station Units 2 and 3 authorized by NRC Operating License Nos.
DPR-19 and DPR-25 and to the discussion of our findings with Mr. D. Scott,
Mr. J. Wujciga and others of your staff at the conclusion of the inspection.
Additional information concerning this inspection was discussed on April 17,
1985, during a telephone call between Mr. Hare and Mr. Wujciga of your staff.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
As you are aware, due to past as found test failures in 1979, and 1983, Dresden
Unit 2 is on an accelerated Type A test schedule.
Pursuant to the 10 CFR Part
50, Appendix J,Section III.A.6(b) requirement, the next Unit 2 Type A test
shall be performed at the next refueling outage unless you request and are
granted an exemption from this requirement by NRR.
During this inspection our inspectors noted evidence of thorough preplanning and
conscientious execution of the Type A test by Dresden Station personnel. This
represents an improvement in your performance in this area and greatly
enhanced the successful conduct of the test.
In accordance with 10 CFR 2.790 of the Commission
1s regulations, a copy of
this letter and the enclosure(s) will be placed in the NRC Public Document
Room.
8505030500 850426
ADOCK 05000237
Commonwealth Edison Company
2
APR 2 8 1985
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Reports
No. 50-237/85015(DRS);
No. 50-249/85014(DRS)
cc w/encl:
D. L. Farrar, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
Sincerely,
Spssardn
R. L. Spessard, Director
Division of Reactor Safety
RII I
IL
~~r'-"
tt!r:efc~
04/24/85
/ill
Gu] dqmond
1lUit9~
RI II
Ch~~timos
RIIL
sp/s\\ard
~rl