ML17194B556

From kanterella
Jump to navigation Jump to search
Forwards 7-day evaluation,out-of-plant Test Results & Action Plan Re Main Steam Line Snubber Failures.Investigation of Clamp Interference & Possibility of Thermal Growth Continuing
Date released: 02/06/2020 Download: ML17194B556


Preliminary Test Rept on Dynamic Testing of Dresden 2 Mechanical Pipe Snubbers.
ML20023D266
Person / Time
Site: Dresden Constellation icon.png
Issue date: 05/11/1983
From: Nothelfer T, Plummer M
COMMONWEALTH EDISON CO., NUTECH ENGINEERS, INC.
To:
References
Download: ML20023D266 (18)
2 Main Steam Monitoring Procedure 7-Day Data Evaluation.
ML17194B557
Person / Time
Site: Dresden Constellation icon.png
Issue date: 05/09/1983
From:
SARGENT & LUNDY, INC.
To:
References
Download: ML17194B557 (56)
Forwards 7-day evaluation,out-of-plant Test Results & Action Plan Re Main Steam Line Snubber Failures.Investigation of Clamp Interference & Possibility of Thermal Growth Continuing
ML17194B555
Person / Time
Site: Dresden Constellation icon.png
Issue date: 05/13/1983
From: Rybak B
COMMONWEALTH EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17194B555 (3)