ML17194A414

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/81-19,50-237/81-36 & 50-249/ 81-28 on 811107-1204.No Noncompliance Noted
ML17194A414
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/11/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17194A415 List:
References
NUDOCS 8201210214
Download: ML17194A414 (2)


See also: IR 05000010/1981019

Text

  • '

Docket No. 50-10

Docket No. /l.0-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

~AN 1 1 &92

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue

and M. J. Jordan of this office during the period of November 7 through

December 4, 1981, of activities at Dresden Nuclear Power Station, Units 1,

2, and 3, authorized by NRC Operating Licenses No. DPR-021, No. DPR-19, *and

No. DPR-25 and to the discussion of our findings with M~.* D. Scott and others

of your staff at the conclusion of the inspection .

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify. this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established.

Consistent with Section 2.790(b)(l), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

~nd which contains a full statement of the reasons which are the bises for the

II

  • .4..**

Commonwealth Edison Company

- 2 -

claim that the information should be withheld from public disclosure.

This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4).

The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Reports

Sincerely,

"Ortgfnal signed by R.L. Spess~r:.F

1

R. L; Spessard, Director

Division of Resident and

Project Inspection

No. 50-10/81-19, No. 50-237/81-36,

and No. 50-249/81-28

cc w/encl:

Louis 0. DelGeorge, Director*

of Nuclear Licensing

D. J. Scott, Station

Superintendent

DMB/Docurnent Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII

\\,_ ...

Knop/so

1/5/82

RI!~\\/

Spe~(~,rd

d t