Docket No. 50-10
Docket No. /l.0-237
Docket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
~AN 1 1 &92
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue
and M. J. Jordan of this office during the period of November 7 through
December 4, 1981, of activities at Dresden Nuclear Power Station, Units 1,
2, and 3, authorized by NRC Operating Licenses No. DPR-021, No. DPR-19, *and
No. DPR-25 and to the discussion of our findings with M~.* D. Scott and others
of your staff at the conclusion of the inspection .
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify. this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established.
Consistent with Section 2.790(b)(l), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
~nd which contains a full statement of the reasons which are the bises for the
II
- .4..**
Commonwealth Edison Company
- 2 -
claim that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4).
The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Reports
Sincerely,
"Ortgfnal signed by R.L. Spess~r:.F
1
R. L; Spessard, Director
Division of Resident and
Project Inspection
No. 50-10/81-19, No. 50-237/81-36,
and No. 50-249/81-28
cc w/encl:
Louis 0. DelGeorge, Director*
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/Docurnent Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
\\,_ ...
Knop/so
1/5/82
RI!~\\/
Spe~(~,rd
d t