Docket No. 50-10
Docket No.L50-237
Docket No. 50-149
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
i
L/!
~ . .
, ...
This refers to the routine safety inspection conducted by Messrs.
T. M. Tongue and M. J. Jordan of this office during the period of October 3
through November 6, 1981, of activities at Dresden Nuclear Power Station, -,
Units 1, 2, and 3, authorized by NRC Operating Licenses No. DPR-02, No. DPR-19,
and No. DPR-25 and to the discussion of our findings with Mr. R. Ragan and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the irispection consisted of a selective
examination of procedures and representative records, observations, and in- .
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from* disclosure under
10 CFR 9.5(a)(4), it is nec~ssary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(l), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to b~ withheld, and which
81123103
PDR ADocH2oe11221
G
50000JO
,.
Commonwealth Edison Company
- 2 -
1981
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above~ a copy of this letter and the enclosed.
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Reports
Sincerely,
R. L. Spessard, Director
Division of Resident and Projects
Inspection
No. 50-10/81-17, No. 50-237/81-32,
and No. 50-249/81-24
cc w/encl:
Louis 0. DelGeorge, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/Document Control Desk (RIDS) *
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
RIII
,.
.
~' t
'*
Tongue/so
Reimann~
Knop
12/14/81
.. '
. RIII/\\_.-
Spes~rd