ML17194A265

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/81-15,50-237/81-29 & 50-249/81-22 on 811013-16.No Noncompliance Noted
ML17194A265
Person / Time
Site: Dresden  
Issue date: 11/06/1981
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17194A266 List:
References
NUDOCS 8111130537
Download: ML17194A265 (2)


See also: IR 05000010/1981015

Text

Docket No. 50-10

Docket No.lj_0-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

November 6, 1981

This refers to the routine safety inspection conducted by Mr. A. G. Januska

and Dr. S. Rozak of this office on October 13-16, 1981, of activities at

the Dresden Nuclear Generating Station, Units 1, 2, and 3, authorized by

NRC Operating Licenses No. DPR-2, No. DPR-19, and No. DPR-25 and to the

discussion of our findings with D. Farrar and members of his staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

In addition, our Mobile Laboratory was at the

site during the inspection to perform independent measurements of radio-

activity.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or*

your contractors believe to be exempt from.disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone,within seven (7) .

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25.) days from the date of

8111130537 811106

PDR ADOCK 05000010

G

PDR

9*

Commonwealth Edison Company

- 2 -

November 6, 1981

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(l) requires that any such application must be

accompanied by an affidavit executed by the owner of the inf6rmation which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires the statement to address* with specificity the considerations listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

!/_ .. -----,_!

,,"

I / * f/J

i /! 1/

y .

'--*-:7: [

  • ,y-1- t (...t.

//3. A. Hind, Director

(/Division of Emergency Preparedness

and Operatibnal Support

Enclosure:

IE Inspection

Reports No. 50-10/81-15,

No. 50-237/81-29, and

No. 50-249/81-22

cc w/encl:

Louis 0. DelGeorge

Director of Nuclear

Licensing

D. J. Scott,

Station Superintendent

D. Farrar, Assistant Superintendent

for Administration & Support Services

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII

RIII

.

~

RIII

11JI

1Gq 11

~*

S:C

c:.*"'. ,..,

.#ni

"ft. , l .r"

  • -:I 1- .

P~j,~iello

CR ~

Januska/jp

Rozak

Schumacher

11/3/81

/:1/;:..-*~i I

11(,(r I

I I d

1r I

/t/(J/tl

'\\l;l

1'.TII-*