Docket No. 50-10
Docket No~-2~
Docket No. 50-24
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
October 22. 1981
IEB~J~~~
-J.~B
This refers to the routine safety inspection conducted by Messrs.
M. P. Phillips and W. L. Axelson of this office on September 23 and
September 29 - October 1, 1981, of activities at the Dresden Nuclear
Generating Station, Units 1, 2, and 3, authorized by NRC Operating
Licenses No. DPR-2, No. DPR-19, and No. DPR-25 and to the discussion of
our findings with Messrs. G. Wagner, D. Scott, and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas-, the inspection consisted of
a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
As was discussed at the exit interview, we are concerned about the
location and functional adequacy of your OSC.
Problems identified
during this inspection are identical to those identified by this off ice
during your June 19, 1980, exercise which we observed as part of the
Health Physics Appraisal.
This matter will be reviewed for further
action by the NRC Headquarters Emergency Preparedness Development
Branch.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter. and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
~5Ao2ao1aa 811022
Q
ADOCK 05000010
WI
,-..,
-" .,
Commonwealth Edison Company
- 2 -
it is necessary that you (a) notify this office by telephone within seven
(7) days from the ~~te of this letter of your intention to file a request
for withholding; and (b) submit within twenty-five (25) days from the date
of this letter a written application to this office to withhold such in-
formation.
Section 2.790(b)(l) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed
The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter and.the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
IE Inspection
Reports No. 50-10/81-13,
No. 50-237/81-26, and
No. 50-249/81-19
cc w/encl:
Louis 0. DelGeorge
.
Director of Nuclear
Licensing
D. J. Scott,
Sincerely,
C}b~:~fl
~'A. Hind, Director
Division of Emergency Preparedness
and Operational Support
Station Superintendent
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
(~~,J./f vJ~/J J
,Plli'llips/so
10/16/81
Rill
"fl
j .-()'". L-
\\.
Paperi~µo
lc\\Lj'?f~
Reimann