Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20198R2331997-04-30030 April 1997 Rev 2 to Quad Cities Unit 2 Cycle 145 Reload Analysis ML20198T3251997-04-18018 April 1997 Non-proprietary Rev 1 to EMF-96-180, Quad Cities Unit 2 Cycle 15 Plant Transient Analysis ML20078E5171995-01-25025 January 1995 Correction to Encl 3, Equivalent Margin Analysis Plant Applicability Verification Form of Topical Rept NEDO-32205-A,Rev 1 ML20078D8611995-01-0505 January 1995 Shroud Repair Seismic Analysis ML20078A7451994-06-30030 June 1994 Evaluation of Indications Found at H5 Weld Location in Quad Cities Unit 1 Shroud ML17187A8051993-01-31031 January 1993 Suppl 1 to GENE-770-26-1092, Long Term Containment Response to DBA-LOCA w/65 Fdegrees F Svc Water Temperature,80 Degrees F Initial Pool Temperature & Initiation of Containment Cooling at 1800 Seconds. ML17252A7531992-11-30030 November 1992 Lpci/Containment Cooling Sys Evaluation. ML20065Q8531990-11-30030 November 1990 Rev 0 to, Comm Ed Topical Benchmark of BWR Nuclear Design Methods ML19332E4071989-10-16016 October 1989 Errata & Addendum 1 to, Safety Evaluation to Justify Operation W/Loss of Jet Pump Flow Indication for Quad Cities 1 & 2 ML19325C9131989-03-31031 March 1989 Safety Evaluation to Justify Operation W/Loss of Jet Pump Flow Indication for Quad Cities,Units 1 & 2 ML20154A4131988-07-13013 July 1988 Extended Operating Domain/Equipment Out-of-Svc Analysis for Dresden Units 2 & 3 ML20147F4101988-02-0909 February 1988 Rev 49 to CE-1-A, QA Program for Nuclear Generating Stations ML20154A4021987-09-28028 September 1987 LOCA-ECCS Analysis for Dresden Units During Single Loop Operation W/Advanced Nuclear Fuels Corp Fuel ML20235C4871987-07-31031 July 1987 Extended Operating Domain & Equipment Out-of-Svc for Quad Cities Nuclear Power Station Units 1 & 2. B Wolfe Affidavit Also Encl ML20235C4331987-06-30030 June 1987 Rev 0 to Suppl Reload Licensing Submittal for Quad Cities Nuclear Power Station Unit 1,Reload 9 ML20205F2711985-08-31031 August 1985 Errata & Addenda Sheet 14,replacing Pages v/vi,3-2,4-3,4-10, 4-15 & 4-16 to, LOCA Analysis Rept for Dresden Units 2,3 & Quad Cities 1,2 Nuclear Power Stations ML20106A6481985-01-31031 January 1985 Errata & Addenda Sheet 13,replacing Pages v/vi,3-2,4-3, 4-15 & 4-16 to, LOCA Anaysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20137F0331985-01-15015 January 1985 Rev 1 to Criticality Safety Analysis,Dresden 2,3 Spent Fuels Storage Pool W/Exxon Nuclear Co,Inc 9x9 Reload Fuel ML20154A3981984-09-28028 September 1984 Analysis of Dresden Units 2 & 3 Operation W/One Relief Valve Out-of-Svc ML20245F2901984-06-30030 June 1984 Hpci/Rcic Room Leak Detection,Phase II & III ML20245F2711984-01-31031 January 1984 Hpci/Rcic Room Leak Detection,Phase I Rept ML20076G9571983-08-31031 August 1983 Cycle 9 Plant Transient Analysis ML20076H0581983-08-0101 August 1983 Revised Mplhgr Analysis Using Exxon Nuclear Corp Exem Evaluation Model ML20106A6051983-04-30030 April 1983 Errata & Addenda Sheet 10,replacing Page 4-11 to, LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20071Q0591982-12-0707 December 1982 Nonproprietary Version of Revision 1 to Plant Transient Analysis for Dresden Unit 2,Cycle 9 ML20071Q0361982-12-0202 December 1982 To Dresden Unit 2 LOCA Analysis Using Exem/Bwr Evaluation Model MAPLHGR Results ML20069J5541982-09-30030 September 1982 Errata & Addenda Sheet 8,replacing Page 4-10 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20065L8711982-07-31031 July 1982 GE BWR Extended Load Line Limit Analysis for Quad Cities Nuclear Power Station,Unit 1,Cycle 7 & Unit 2,Cycle 6 ML20063C4871982-07-31031 July 1982 Errata & Addenda Sheet 7,replacing Pages 4-11 & 4-14 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations ML20039G9531981-12-31031 December 1981 Cycle 8 Reload Analysis, Revision 1 ML20039G9561981-12-23023 December 1981 3,Cycle 8 Plant Transient Analysis Rept. ML17194A0651981-07-31031 July 1981 Errata & Addenda Sheet 6,replacing Pages V/VI,3-1,3-2,4-3 & 4-14,to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations. ML20037D4741981-06-29029 June 1981 Mark I Plant Containment Mod Status Summary ML17194A0631981-05-31031 May 1981 Errata & Addenda Sheet 5,replacing Pages V/VI,3-1/3-2,4-10, 4-12,4-13 & 4-14 to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Stations. ML20126J6951981-03-31031 March 1981 Control Blade Exam Results & Response to Item 4 of IE Bulletin 79-26 ML19343C3751981-02-28028 February 1981 Generic Info for Barrier Fuel Demonstration Bundle Licensing, Approved Version ML19351G2261981-01-0202 January 1981 5 to QA Program for Facilities ML19343A9901980-11-13013 November 1980 Revised Page 4-8 to LOCA Analysis Rept. Supplemental Discussion of NEDO-24855 Encl ML19343A9831980-08-31031 August 1980 Plant:Extended Burnup Fuel Program ML19250B9991978-12-31031 December 1978 Load Line Limit Analysis License Amend Submittal. ML19345C0831977-05-31031 May 1977 Radiation Level Assessment of Dresden 1 Decontamination Pilot Loop-Final Rept 1997-04-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000254/LER-1999-004-03, :on 990910,CREVS Air Filtration Unit Was Declared Inoperable.Caused by Airflow Rate in Excess of TS Allowable.Airflow Was Adjusted During Performance of Surveillance Procedure Qcos 5750-021999-10-12012 October 1999
- on 990910,CREVS Air Filtration Unit Was Declared Inoperable.Caused by Airflow Rate in Excess of TS Allowable.Airflow Was Adjusted During Performance of Surveillance Procedure Qcos 5750-02
05000254/LER-1999-003-05, :on 990907,noted That HPCI Was Inoperable Due to Manual Closure of HPCI Steam Supply Isolation Valve.Cause Indeterminate.Suppl LER Will Be Issued Upon Determination of Root Cause of Control Switch Failure1999-10-0707 October 1999
- on 990907,noted That HPCI Was Inoperable Due to Manual Closure of HPCI Steam Supply Isolation Valve.Cause Indeterminate.Suppl LER Will Be Issued Upon Determination of Root Cause of Control Switch Failure
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20249C8491999-09-30030 September 1999 1999 Third Quarter Rept of Completed Changes,Tests & Experiments Evaluated,Per 10CFR50.59(b)(2), for Dresden Nuclear Power Station. with ML20216H8481999-09-23023 September 1999 Safety Evaluation Supporting Amends 190 & 187 to Licenses DPR-29 & DPR-30,respectively ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210U7831999-08-0404 August 1999 Safety Evaluation Supporting Amends 189 & 186 to Licenses DPR-29 & DPR-30,respectively ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210R6081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Dresden Nuclear Power,Units 1,2 & 3.With ML20209E1291999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20209J3481999-06-30030 June 1999 1999 Second Quarter Rept of Completed Changes,Tests & Experiments, Per 10CFR50.59.With ML20210D3071999-06-30030 June 1999 Corrected Page 8 to MOR for June 1999 for DNPS Unit 3 SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196F4261999-06-25025 June 1999 Safety Evaluation Supporting Amends 188 & 185 to Licenses DPR-29 & DPR-30,respectively 05000265/LER-1999-002-04, :on 990527,station Personnel Discovered Unsealed One Inch Diameter Pipe Penetrating Secondary Containment.Caused by Lack of Proper Work Control.Util Will Permanently Cap Spare Subject Pipe by 9907151999-06-25025 June 1999
- on 990527,station Personnel Discovered Unsealed One Inch Diameter Pipe Penetrating Secondary Containment.Caused by Lack of Proper Work Control.Util Will Permanently Cap Spare Subject Pipe by 990715
05000254/LER-1999-004-02, :on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised1999-06-18018 June 1999
- on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised
ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20195G6381999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20210H3501999-05-25025 May 1999 Rev 1 to Quad Cities Station IPEEE Submittal Rept ML20207E1621999-05-25025 May 1999 Rev 1 to Quad Cities IPEEE, Consisting of Revised Chapter 4.0 Re Internal Fire Analysis ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations 05000254/LER-1999-001-04, :on 970715,three Spare Valves Were Determined to Require Monthly Verification in Accordance with TS SR 4.7.A.2.Caused by Inadequate Review of Procedure Rev. Surveillance Revised to Ensure to Continued Compliance1999-05-12012 May 1999
- on 970715,three Spare Valves Were Determined to Require Monthly Verification in Accordance with TS SR 4.7.A.2.Caused by Inadequate Review of Procedure Rev. Surveillance Revised to Ensure to Continued Compliance
SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20206N2821999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20206B1901999-03-31031 March 1999 First Quarter Rept of Completed Changes,Tests & Experiments Per 10CFR50.59 for Dresden Nuclear Power Station. with ML20205N7491999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20205F4791999-03-31031 March 1999 Safety Evaluation Supporting Amends 187 & 184 to Licenses DPR-29 & DPR-30,respectively ML20205D4171999-03-26026 March 1999 Safety Evaluation Supporting Amends 186 & 183 to Licenses DPR-29 & DPR-30,respectively ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20204D9751999-03-17017 March 1999 Safety Evaluation Supporting Amends 185 & 182 to Licenses DPR-29 & DPR-30,respectively ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With ML20207M6921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20199C8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Dnps,Units 1,2 & 3 ML20199D3261998-12-31031 December 1998 10CFR50.59 SER for 1998-04 Quarter, of Changes,Tests & Experiments.With SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With 1999-09-30
[Table view] |