Docket N~
Docket N~
Do~ket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
, JUL 2 4 1~Dl
.IE FILE COPY
This refers to the routine safety inspection conducted by Mr. M. M. Holzmer
of this office on July 6-9, and 13, 1981, of activities at Dresden Nuclear
Power Station authorized by NRC Operating Licenses No. DPR-2, No. DPR-19
and No. DPR-25 and to the discussion of our findings with Mr. D. Scott -at
the conclusion of the inspection.
The enclosed copy of *our inspection report identifies areas examined du.ring
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
The item in the Notice of Violation enclosed with this letter is a recurrent
item (second occurrence identified within one year) and was discussed
with the plant manager, Mr. Scott, during the exit interview held on
July 9, 1981.
In your response to this letter, please give this matter
your particular attention.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter.will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information.
Section 2.790(b)(l) requires
8108050188 810724
PDR ADOCK 05000010
G
- JUL 2 4 1~cil
Commonwealth Edison Company
- 2 -
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
public disclosure.
This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4).
The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, a copy of this
letter, the enclosures, and your response to this letter will be placed
in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Reports
. No. 50-10/81-09,
No. 50-237/81-19 and
No. 50-249/81-13
cc w/encls:
J. S. Abel, Director
of Nuclear Licensing
D. J. Scott,
Station Superintendent
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
RIII