Confirms Telcon Re Providing Addl Response to Noncompliance Item 1 in IE Insp Repts 50-237/81-06,50-249/ 81-04,50-254/81-03,50-265/81-03,50-295/81-05 & 50-304/81-03. Revision to QA Topical Rept Should Be Submitted by 810815
ML17194A044
Person / Time
Site: Dresden, Quad Cities, Zion  
Issue date: 07/29/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8108040249
Download: ML17194A044 (4)


See also: IR 05000237/1981006

Text

  • '
    • -*- -** ** *** -**-"

... " _ _. .*** .._.,._ ___ , '.* ...... *~.:. * -

  • -*. ****--*** ** * *," '**r ** _. __ ,_. -_,,, .~.~.,_ . .._._., __ '** .... >.-***>. '* **'"

-* '. .*

.... *

- .

~-.*-. -'""" '* --*. ,.;

~-

- l.

-* *--- **

-

-

'

- '*.

I..' -

......

'

-;..

e-

r JUL 2 9 19811

Docket Nos. 50-237;c?°0-249:;.._.so-254;

50-265; 50-295; 50-304

Commonwealth Edison Company

A'l"l'N:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This is to confirm the telephone discussion between Mr. T. Rausch of

your staff and Mr. J. Grobe of our staff concerning your letter dated

June 15, 1981, which provided supplemental response to noncompliance

Item 1 which we brought to your attention in Inspection Report Nos.

50-237/81-06, 50-249/81-04, 50-254/81-03, 50-265/81-03, 50-295/81-05,

and 50-304/81-03, forwarded by our letter dated May 1, 1981.

We understand that you will need an extension on the submitted date for

the revision to the Quality Assurance Topical Report, CE-1-A.

This

revision will be submitted by August 15, 1981.

We will examine these

matters during a subsequent inspection.

Your cooperation with us is appreciated.

8108040249 810729

PDR ADOCK 05000237

Q

PDR

Sincerely,

c. E. Norelius, Director

Division of Engineering and

Technical Inspection


"'-'oF:.!:.!F1'.'e_!cE~i.~I _..RH~l!!:!]i!!.__.../l~ _

__J__,R.,,,.I.,_,I.,_,.I~r'--"1-'-"17'------_l"""R,,_.I ....... I~r/J...~~,;2~_ l_RTII

/

' I RITT

r~----~Tl""T

'/

'I

I*

  • I

\\ ...

'

Commonwealth Edison

One First National Plaza. Chicago, Illinois

Address Reply to: Post Office Box 767

Chicago, Illinois 60690

Mr. James G. Keppler, Director

Directorate of Inspection and

Enforcement - Region III

U.S. Nuclear Regulatory Commission

799 Roosevelt Road

Glen Ellyn, IL

60137

June 15, 1981

Subject:

Dresden Station Units 2 and 3

Quad Cities Station Units l and 2

Zion Station Units l and 2

Supplemental Response to IE

Inspection Report Nos. 50-237/81-06,

50-249/81-04, 50-254/81-03, 50-265/81-03,

50-295/81-05, 50-304/81-03

NRC Docket Nos. 50-237/249,

50-254/265. and 50-295/304

Reference (a):

J. S. Abel letter to J. G. Keppler

dated May 2 6, 19 81 *

(b):

C. E. Norelius letter to C. Reed

dated May 1, 1981.

Dear Mr. Keppler:

In Reference (a), Commonwealth Edison responded to the four

apparent items of noncompliance identified in the Reference (b)

Inspection Report transmittal.

In our response to Item 1, we

indicated that Dresden, Quad Cities, and Zion Technical

Specification changes would be submitted identifying the appropriate

standards relating to quality assurance to which the stations are

committed to comply.

These changes would delineate. specific

exemptions from the Commonwealth Edison Quality Assurance Program

Topical Report, CE-1-A, for each site.

Following internal management discussions on this subject,

it was concluded that it would be more appropriate to revise Topical

Report CE-1-A than to submit Technical Specification changes for

each affected unit.

This alternative will accomplish the same

result, which is to identify the specific regulatory guides and

s-tandards (and applic_able revision) which each site is committed to

comply with.

.

r

..

f,

  • ; *

..

  • -

. ;;,--*~. ~* .

,J. G * K e p p l e r

...

- 2 -

June 15, 1981

This rev1s1on to the Quality Assurance Topical Report will

be submitted by July 31, 1981, and the Technical Specification

changes described in Reference (a) will be discontinued.

The July

31, 1981, date was chpsen to allow adequate time for a complete

review of this revision by the stations and by the Corporate Quality

Assurance Department.

Please address any questions concerning this matter to this

off ice.

Very truly yours,

~/£Q*'t1l~

~

J. S. Abel

Director of Nuclear Licensing

cc:

Reg.ion III Inspector - Dresden

Region III Inspector - Quad Cities

Region III Inspector - Zion

SUBSCRIBED AND SWORN to

before me this //v,J, day

of

<J'=<a.-L

'. 1981.

r2cruJ~ a. (2 n.t::V

Notary Public

lm

2161N

iJLJL 2 8

1~u1

Docket No. 50-237

Docket No. 50-249

r: FILE COPY

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

P. 0. Box 767

Chicago, IL

60690

Gentlemen:

This is to confirm our telephone discussion on July 20, 1981 with

Mr. D. Farrar of your staff concerning your letter dated June 29, 1981

informing us of the steps you have taken to correct the noncompliance

which we brought to your attention in Inspection Reports No. 50-237/81-09

and No. *50-249/81-06 forwarded by our letter dated June 4, 1981.

Mr. Farrar informed us that you will not be able to arrange for your

Fire Brigade members to attend the hands-on fire training sessions at

the Great Lakes Firefighter Training Center, but you will continue.

on schedule with the hands-on fire fighting practice sessions provided

by Industrial Fire Equipment Company at the Dresden Station.

We will

examine these matters during a subsequent inspection.

Your cooperation with us is appreciated.

cc:

Louis 0. DelGeorge

Director of Nuclear

Licensing

D. J. Scott, Station

Superintendent

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

AsslsLant Attorney General

RIJ,I, \\

lvl/

RIII

/

Sincerely,

C. E. Norelius; Director

Division of Engineering and

Technical Inspection

RIII

}

~;.Jv-

RIII

~