UNITEDSTATES

.

. '9

N'rfcLEAR REGULATORY COMMISSION

REGION Ill

Docket No. 50-237

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

""JUL

2 1981

IE ALE COPY.

This refers to the routine safety inspection conducted by D. L. Robinson

and I. N. Jackiw of this office on May 14, and June 9-10, 1981, of activities

at Dresden Nuclear Power Station, Unit 2 authorized by NRC Operating License

No. DPR-19 and to the discussion of our findings with Mr. D. Scott and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative re~ords, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(l) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the rea~ons on the basis which it is claimed that the

information should be withheld from public disclosure.

This section further

. requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

.8107150060 810702

PDR ADOCK 05000237

G

PDR


*-~--

~

\\

! '

~-J.

Commonwealth Edison Company

- 2 -

2 1981.

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

)

Enclosures:

IE Inspection

Report No. 50-237/81-16

cc w/encl:

J. S. Abel, Director

of Nuclear Licensing

D. J. Scott, Station

Superintendent

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RI~

£binson/db

6/19/81

RIII

~~

Sincerely,

\\

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

RI~

spsard