ML17193B315
| ML17193B315 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/06/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17193B316 | List: |
| References | |
| NUDOCS 8104130480 | |
| Download: ML17193B315 (2) | |
See also: IR 05000237/1981004
Text
VJ
Docket No. 50-237
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
Gentlemen:
a~*'
~ 1.c. ..* r_~1.
n:.i..i.r\\
a
This refers to the routine safety inspection conducted by Mr. R. A .. Paul
of this office on January 15-16, 20-22 and February 2-3 and 5, 1981, of
activities at Dresden Nuclear Power Station, Unit 2, authorized by NRC
Operating License No. DPR-19 and to the discussion of our findings with
Mr. Scott and members of your staff at the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel ..
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a'copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Doci.Jroent
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty-five days of the date of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application .
Commonwealth Edison Company
- 2 -
6 1~f.) l
We will gladly discuss any questions you have concerning this
inspection.
Enclosure:
IE Inspection
Report No.
50-237/81~04
cc w/encl:
J. S. Abel, Director
of Nuclear Licensing
D. J. Scott,
Station Superintendent
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
Dean Hansell, Office of
Assistant Attorney General
~
RIII
f:e.r
2/28/81
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
RII~
Fisher
3/aff\\
RIII
No~s
RI~
f8eeter
'i~f4'