Forwards Requests for Addl Info Re SEP Topic VI-7.A.3 Concerning ECCS Test Capabilities
ML17193A844
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/15/1980
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Abel J
COMMONWEALTH EDISON CO.
References
TASK-06-07.A3, TASK-6-7.A3, TASK-RR LSO5-80-057, LSO5-80-57, NUDOCS 8103050359
Download: ML17193A844 (4)


Text

I'

\\ -

y.*

1~ -13. *;?a r

'-0'..

DISTRIBUTION.

Docket ::

01 &E ( 3)

GCwalina DKragh (2)

Docket No. 50-237 LS05-80-057 NRC* PDR.

Loca 1 PDR ORB Reading DEi sen.hut

RPurpl e Mr._: µ
  • S
  • Abel Director of Nuclear licensing, Coinmonwea 1th Edi son Company Pos't Offfce Box 767 Chicago, Illin9is *60690

Dear Mr. Abe 1 :

_JRoe "

.TNovak Glainas *.... *

  • _RTedes.co
  • DCrutchfi el d HSi:ni th

OELD

. RE: *SEP TOPIC VI-7.A.3 ECCS ACTUATION SYSTEM (DRESDEN NUC~E-~R 'i>dWE~ STATION, UNIT NO. 2J

\\~~ are continuing._our re~iew of; SEP Jo_pic. 'vI-7 *. A.3 _and have**fo~nd*..

that ad_ditional.. 1.nfonnation as described in.the enclosure to* this *1etter.

1.s needed. * *.

We request yo_ur response.within 30 days a*f your recefpt of this;.

.,., -~

~;.

~.

    • le.tter. *

. )~

Enclosure:

Request.for Additional

  • lnfonnation *.

cc w/encloslire:.

' See* next page

~'. ;

£ '.'

Sin.ce.rely,,

Deni ~lcrutchfield, Chief

. Oper~ting. Re~~to'rs Branch #5. "

DfvU1on of. u*censfog I

f

~

J

\\ 1

'I

. **i-;

!' \\..

\\.

~

i '

.r/

1-..,.....1

... :. ~

OFFICE

,.. Ol-.~.O.R~.. #5.... 0L::-11.1.Jl.'11-1,j*."IJ PO'Connor:cc DCr chfield

............................ !'...... *\\************

SUR::::~:::\\~,:~~~*:::::: :,:~JJ:~1V?.':: :*: :: :: :: : : :: ::::::.:::: :: : :: : : : : : : : : :. : : :*:.::: ::: ::: :: : :': ::::\\::::.:::::*

i l

NRC FORM 318 (9-76) NRCM 0240

'ffu.s. GO"'..ERNMENT PRINTING OFFICE: 1979-289-3G9 t

\\

'-~p.ji> REGLJ

~ f:J~¥.

o.,.~.

I UNITED STATES

~~*f

-,i.

0

~ ~-

.*(.~ ~

o*"-.

-*~

~, __. --~

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 "1.--?

~o' Docket No. 50-237 LSOS-80-057 Mr. J. S. Abel Director of Nuclear Licensing Commonwealth Edison Company

  • Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Abel:

December 15, 1980 RE:

SEP TOPIC VI-7.A.3 ECCS ACTUATION SYSTEM (DRESDEN NUCLEAR POWER STATION, UNIT NO. 2)

We are continuing our review of SEP Topic VI-Z.A.3 and have found that additional information as described in the encl9sure to this letter is needed.

We request your response within 30 days of your recei~t of this 1 etter.

Enclosure:

Request for Additional Information cc w/enclosure:

See next page Sincerely, L~

t!J'd.£,,,d Dennis M. Crutchfield, ~~~-..,....

Operating Reactors Branch #5 Divisio~ of Licensing

~)

/*..

-/

Mr.J.S.Abel cc Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. D. J. Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris~ Illinois 60450 Natural Resources Defense Council 91°7 15th Street, N. W.

Washington, O. C.

20005 U. s. Nuclear Regulatory Conrnission Resident Inspectors Office Dresden Stat ion RR #1 Morris, Illinois 60450 Susan N. Sekuler Assistant Attorney General Environmental Control Division 188 W. Randolph Street Suite 2315 Chicago, Illinois 60601 Morris Public Library 604 Liberty Street Morris,.Illinois 60451 Chairman Board of Supervisors of_

Grundy County Grundy County Courthouse Morris, Illinois 60450 John F. Wolfe, Esquire 3409 Shepherd Street Chevy Chase, Maryl and 20015 Dr. Linda W. Little 500 Hermitage Drive Raleigh, North Carolina 27612 December 15, 1980 Department of Public Health ATTN:

Chief, Division of Nu cl ear Safety 535 West Jefferson Springfield, Illinois 62761 Director, Standards and Criteria Division Office of Radiation Programs (ANR-460)

U~ S. Environrrental Protection Agency Washington; O. C.

20460

u. S. Environrrental Protection Agency.-

F edera 1 Activities Branch Region V Office ATTN:

EIS COORDINATOR 230 South Dearborn Street Chicago, Illinois 60604 Dr. Forrest J. ~emick 305 East Hamilton Avenue State College, Pennsylvania 16801

,;.., )*

r:"'

J i

I REQUEST FOR ADDITIONAL INFORMATION ON DRESDEN UNIT 2 FOR SEP TOPIC.VI-7.A.3 The information provided in your letter of March 26, 1979 does not adequately address GDC 21 requlrements for the capabllity to test ECCS.

Provide the following additional in~ormation with regard to the mlnimum flow bypass control for each ECCS pump:

(1) Describe how the flow sensor is calibrated and tested.

(2) Describe how proper o~~ration o~ the relay log*i c is tested.

(3) Describe hbw proper functioning of the bypass valve is verified during the periodic test (Please note that these valvei will cycle in less than one minute under the test conditions).

~

f (4) Describe how the design of the bypass valye cont~ol sub-s~items satisfy the requireme~ts of:

Ca)GDC-21,

( b ) IEEE Std 2 7 9 -

1 9 71 Sect i on s 4. 1 0, 4. 1 2 *,-**.and 4.20, Cc) IEEE.Std 318 -

1971, Cd) Regulatory Guide 1.22, and Ce) Regulatory Guide 1.118 *

\\