AVERAGE DAILY UNIT POWER LEVEL MONTH FEBRUARY, 1980 DAY AVERAGE DAILY PO\\.JER LEVEL DAY (MWe-Net) 2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 J.7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOCKET NO. 050-010
~..;;......;;:..:;..;:;. __ _
Utl IT Dresden I DATE March 4, 1980 COMPLETED BYS. A. Cieszkiewicz TELEPHONE (815) 942-2920 AVERAGE DA I LY PO\\*/ER LEVEL (M\\*Je-Net) -o- -o:..
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO......;0;...;;5;...;;0_-=2=-3 7"----
Uri IT Dresden II DATE March 4, 1980 COMPLETED BY S.. A.
Cieszk~ewicz TELEPHONE (815) 942-2920 MONTH FEBRUARY *. 1980 MY AVERAGE DA I LY PO\\.JER LEVEL DAY AVERAGE DA I LY PO\\JER LEVEL (MWe-Net)
(M\\fo-Net) 705.
17 683 2
18 710 3
275 19 759 4
687 20 748 5
721 21 754 6
757 22 761 7
754 23 738 8
757 24 755 9
760 25 756 10 26 11 745 27 760 12 741 28 754 13 736.
29 751 14 2
30 15 731 31 16
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 Ull IT Dresden III DATE March 4, 1980 COMPLETED BY S. A. CieszkiewiCz
.TELEPHONE (815) 942-2920 MONTH FEBRUARY*
1~80 DAY AVERAGE DA I LY PO\\.JER LEVEL DAY AVERAGE DA IL Y PO\\~ER LEVEL (MWe-Net)
(M\\~e-Net) 508 17 2 317 18 3 19
-o-4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27
-o-12 28 13 29 14 30 15 31 16
- e
. I
\\.**
. l No.
bate 8'
781031
. ' ~ *. :*..
.... i.L*
.'*j
- .**.... : r* *......
i Ft Forced St.* $chedu1ed QJ a.
~
s 2
I""\\
L 4-..
0 i:-
N 0
Cl..,
0 Ill c
c u L
0 "tJ *-
111
&.J :J VI 0 4-J'Q)
.,, 0 111
.c &.J IX'.
\\. :c Cll
... :J
- J._..
a:
Ill.c i:
- o 2: Ill ~
0 UNIT Slli.JTOOWHS /\\No PO\\JER REOUCTIOllS llEPORT MONTll FEBRUARY~ 1980
µ.
c Licensee c;.:t.
tUn QJ Cll
. c Ill Event 4-J"tJ 0-U
.,, 0
- a. 0 Report I
>-U eu Ill.
0 u
VII L l:l I I II I.
0:..:::5..:::.0_-~0 ~10"--'---
Ull 1 T Ml\\11[ Dresden I DATE March 4, 1980 COHPlfTED UY S. A. Cieszkiewicz TELEPllOilE (815) 942-2920 Cause t Corrective
/\\ctlon to Prevent Recurrence 696 c
- 3
- Refuel and chemical cleaning outage*. *
\\
Reasoni 1\\-Etjulpmcnt F'alluto (Exptntri)'
b-Hcilriten~nce of Test C-Ref ue. I I ng 1
b-Ra~Ulotory n~strl~tlbri
~~Opa~~tof lr~lnln~ g llcens~ ~xbmlna F~Ad~lhlattatlv~*
().
G-Opcr~tltinal ttror H-Other (Exp~aln) 3 Method:
- 1-11anua 1 2-thmual Scram j-1\\utonmtlc Scten1
~-other (Explain)
Exhibit G-lnstructlons. for of OatA fr - LI censea i
Preparnt Ion Entry Sheet~
Event Report 0161)
(
)Flle(NUREG*l
(
No.
bate 2
800203
.,, ~..
~; : :.*.
.*... :.. ::.*: i:~.:;-.. /* ~.
'.'~t'.','"~';*;*',:'..**'l Ft totced
_$ t. ~chedu 1 ed
~....
.. ~
(.; -*y UllU:l I 1111._:0:.=.5..:.0_-.::.2.::.3:.-7 _____ _
UNIT SliiJTDO\\./HS AND POWER REOUCTIOllS' Ull I T N/\\/I( Dresden II REPORT HONTlf FEBRUARY', 1980 01\\H March 4. 1980 COMPLETED BYS. A. Cieszkiewicz TElEPUOtlE {815) 942"."2920 F
i:-
N 0
Vi c
0 U
- J VI
"' 0 Ill
\\. x cu
=>-
~-
0 10.66 A
I
\\.
Licensee Event Report Ii neasohl
-*-- A-Equ I pmcnt Fa II uto (Exp In In)
- 8-lfalritenonce* of Ted t-Refu~llng 1.
b-nc~ulotory ncstrlcllon
~~o~~t~tof Jr~lnln~ ~ llcen9~ txbmln~
F*Admlhlsltntlvd
()
J i
.... c QJ1'
. t: d.I 0"0
- o. 0 eu 0
u Cause & Correctlv~
/\\ci: I on to Prevent Recurrence Rx Scrarmned on low vacuum while trans-ferring MaxRecycle reboiler relief.dis-charge from Unit 3 condenser to Unit 2 condenser.
G-Opcratlonal F.rror H-Other (Explal~)
~-other (Explain)
Mcthodl
- I -r1a11ua 1 Exhibit G-lnstr~ctlons. for Preparntlon of Oatn tntry Sheets fr* Licensee 2.-ltonual Scrnm 3-Au~o~otlc ict~~
Event R~port (
)Fllc(NUREG*:
Ol 6 I)
(
l
. t No.
Date 1
.2 800202 800203
.... =.:.. :..
~ ;**i*'
. t, '
I!,
~, I.
,.. I
.~
Ft Fotced St* ~theduled I.
- i'.
,.. *.. :.*.(.-').*
di
- 0.
F s
UNIT SllUTOOWl~S i\\ND rmJER REDUCTIOllS U fl L l:l I II I I. _::.0.::.5 0.::..,...-:2=-4'-"=9'------
Ul II T M/\\11[ Dresden III REPORT MONTH FEBRUARY'. 1980 01\\TE March 4, 1980 COHPLETEO UY S. A. Cieszkiewicz TELENlOtlE (815) 942-2920 I..
~.
0 1::-
N 0
O'I...,
0 Ill c
c u
. LI cehsee I..
0
-0 *-
111
- J VI 0 u QJ Event 0
ru
.r. &J 0:::
\\;, :c QJ u
- J Report II
. ::J-0:::
Ill.c ~
0
- c Vl 0
21.33 A
1 LER.://80-4/031-0 6.40.0.. c
\\
rteosoni A-Equipment F'alluto (Explnin)'
B-lfalnteMnce of Test C-Refu~11ng.
1.
o~n~~l.i1otory n~strlcllbn c..:t QJ QJ
µ,,
VI 0
>-U Vl.
c
. ~"a.1 0 -0
- o. 0 EU 0
u Cause & Corrective
/\\ct Ion to Prevent Recurrence Jet pump 1113 was found to be inoperable.
Unit ~onunen:ced its scheduled reftie;Ling outage.
- G*Opcr~tltinai Etror H-Other (Explaln)
~-other (Explain)
Exhibit G-lnstructlons. for 3
- Method~
of OatA
- I.. t1anua 1 for Licensee t*Op~tator Jr~lnlng g Llc~ns~ tx6mlna i
F*Admlhlsltatlvd 2-lhmual Scram j-i\\uio~ot1c tcra~
Preparation l:ntry Sheet!
tvent Report 0161)
(
)F'lie(tlUREG-( )
(
}
- ~*
I OPERATING DATA REPORT DOCKET NO.~o~s~o~-~0.1~0 ________ _
DATE March 4, 1980 COMPLETED BYS. A. Cieszkiewicz 1
- l.
- 2.
3,
- 4. s.
- 6.
7,
- 8.
OPERATING STATUS Unit Name:
Dresden I Reporting Period:~F~e~b~r~u~~*r*Y~*.--19~8~0..._ ___________________ __
Licensed Thermal Power (MWt) :__..1_0_0_* ------------------~
Nameplate Rating (Gross MWe): 209 Design Electrical Rating (Net-=M\\=ve......,..)_:_2_0_Q ______________ _
Maxi mum Depend ab I e Capacity (Gross M\\foJ =--=2=0.... 5 ________ _
TELEPHONE (815) 942-2920 NOTES Maximum Dependable*Capacity (Net MWe):
197 If Changes Occur in Capacity Ratings...,.(-1-te-m~s--3__,,T,.,.\\1-r-o_u_g_h 7) Since Last Report,.Give Reasons:
NA.
9; Power Level to \\vhich Restricted, If Any (Net MWe):
NA
- 10.
Reasons For Restrictions, If Any:
A
=----------------------------------------------
This Month Yr-to-Date Curnulat i.Ye.
- 11.
Hours.in Reporting Period 222 l * {i{iQ lH. 2{iQ
- 12..Number of Hours Reactor Was Critical ll3,l53 :ZS
- 13.
Reactor Reserve Shutdown Hours 0
0
- 14.
Hours Generator On-Line 0
0 1111196.15
- 15.
Unit Reserve Shutdown Hour.s
- 16.
Gross Thermal Energy Generated (MWH) 0 0
5610141747.15
- 17.
Gross Electrical Energy Generated (MWH) 0 0
1617921254.12
- 18.
Net Electrical Energy Generated (MWH)
-758.3
-1z633.1 15 2808 1 192.82
- 19.
Unit Service Factor 0
0 64
- 20.
Unit Availability Factor 0
0 64
- 21.
Unit Capacity Factor (Using MDC Net) 0 0
46
- 22.
Unit Capacity Factor (Using DER Net) 0 0
45
- 23.
Unit Forced Outage Rate 0
L l. 2
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
NA
__.=;; __________ __
OPERATING DATA REPORT DOCKET NO. 050-237
. DATE March 4, 1980 COMPLETED BY s. A. Cieszkiewic(
TELEPHONE (815) 942-2920 OPERATING STATUS NOTES
- 1.
Unit Name:_..n=r=e~sd_e=n-..I~I~---------------
- 2.
Reporting Period:~F~eb~r~u=a~r~v~*.....-=1~9~8~0_.__ ________ ___
- 3.
Licensed Thermal Power (MWt):
2527
- 4.
Nameplate Rating (Gross MWe):
828
- 5.
Design Electrical Rating (Net-M\\-.Je~) :;..,: __ 7_9_4 _______ __
- 6.
Maximum Dependable Capacity (Gross MWe): 812
- 7.
Maximum Dependable Capacity (Net MWe):
772
- 8.
If Changes Occur in Capacity Ratings -r(-'i"""te-=m:-s___,3,......,,,T,.,..h-r-o-u-g.,....h 7) Since Last Report, Give.
Reasonsi NA
- 9.
Power Level' to \\.Jhich Restricted, If Any (Net MWe):
NA ________________._
- 10.
Reasons For Restrictions, If Any:
NA 1 I.
Hours in Reporting Period
- 12.
Number of Hours Reactor Was Critical
- 13.
Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line
- 15.
Unit Reserve Shutdown Hours
- 16.
Gross Thermal Energy Generated (MWH)
- 17.
Gross Elect r i ca 1 Energy Generated (M\\.JH)
- 18.
Net Electrical Energy Generated (MWH)
- 19.
Unit Service Factor
- 20.
Unit Availability Factor
- 21.
Unit Capacity Factor (Using MDC Net)
- 22.
Unit Capacity Factor (Using DER Net)
- 23.
Unit Forced Outage Rate
- 24.
Shutdowns Scheduled Over Next 6 Months NA This Month 626 fi2Q 685 33 0 1z634 z 26 7 5261209 5001629 98.5 98.5 93.2 91.0 1.5 (Type, Date, and Yr-to-Date Curoulati'le.
1 440 82.826
- l. {+/- 2{+/- I f!8 fifi.lfil.l l,!ilS 62,60Z 55 0
0 3 2304 2254 124 1946 2086 110631530 40.070.149 110111949.4 3719001060.617 98.3 73.0 98.3 Z3.0 91 5z.2 88.5 56.0 2.0 13.3 Duration of Each):
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
NA
OPERATING DATA REPORT DOCKET N0,050-249
...;.;;;....;;.....--..--------~
DATEMarch 4. 1980 COMPLETED BYS. A. Cieszkiewicz, TELEPHONE(815) 942-2920 OPERATING STATUS NOTES
- 1.
Unit Name: Dresden III
~---------------------------------------
- 2.
Reporting Period:-=-F~eb~r~u~a~r~y~..........
1,9¥8~0 __________________ __
- 3.
Licensed Thermal Power (MWt): 2527
~------------------------._
- 4.
Namep I ate Rating (Gross MWe) :___.a.... 2~a-----------------
- 5.
Design Electrical Rating (Net MWe): 794
- 6. *Maximum 'Dependable Capacity (Gross -M~W~e~)-:_8_1_2 _______ __
- 7.
Maximum Dependable Capacity (Net MWe) =........-7~7~3.__ ________ _
- 8.
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:*
NA
- 9.
Power Level to \\.Jhich Restricted, If Any (Net MWe):
NA
~,;,,_------------------------------
- 10.
Reasons For Restrictions, If Any:
NA This Month Yr-to-Date CuruulatiYe.
- 11.
Hours in Reporting Period 696 1 440 Z5. !+/-~H
- 12.
Number of Hours Reactor Was Critical 41 785 56.550.J?
- 13.
Reactor Reserve Shutdown Hours 0
0 0
- 14.
Hours Generator On-Line 34.66 ZZB&2.
5!'.i,JQ3 2
- 15.
Unit Reserve Shutdown Hours 0
0 0
- 16.
Gross Thermal Energy Generated (MWH) 52,593 12 327 2726 103 2599 2393
- 17.
Gross Electrical Energy Generated ( M\\.JH) 16 2693 424.659 33.854.J:2:2.25
- 18.
Net Electrical Energy Generated (MWH) 11 z 749
. 396 z 289.6 32.089.580.569
- 19.
Unit Service Factor 5.0 54.1 72.0
- 20.
Unit Availability Factor 5.0 54.1 z2.o
- 21.
Unit Capacity Factor (Using MDC Net) 2.2 36.0 55.0
- 22.
Unit Capacity Factor (Using DER Net) 2.1 35.0 53.5
- 23.
Unit Forced Outage Rate 38.5 3.0 Hi,4
- 24.
Shut~iowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
800521
~~.;;..;;...;;;..;;.... ____ __
DRESDEN UN IT 1 SAFETY RELATED MA I NTENANCE -:- FEBRUARY, 1980 NATURE OF LER OR OUTAGE MALFUNCTION*
EQUIPMENT MA I llTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION -.
~
Control Rod Preventive WR /18154
. -Outage 111-8
~A NA Rebuilt control rod drive
.ve SN 1253 Control Rod*
Preventive WR 118156 Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1287 I
/1815 2 Control Rod Preventive WR Outage 111-8 NA NA Rebuilt control rod drive.
Drive SN 1241 Control Rod Preventive WR 118155 Outage 111-8 NA NA" Rebuilt control rod drive*
Drive.SN 1270*
t *t Reactor Vessel Preventive WR 11.8688 Outage 111-8 I
NA NA Removed metal samples froin.
Head reactor vessel head e
i I
EQUI PHENT L PCI System Flo~
e H PCI Turbine c
CSW Line 1510.
1514 Hangers eactor-Turbine R
B D
ldg. Interlock oor 601-22 1
v.alve E SS M.G.
Versa Set NATURE OF MA I NTEIMNCE Preventive WR #4134 Corrective WR #3574 Preventive WR #3677 Preventive WR #4106 Corrective WR #4223 Preventive WR #4409 DRESDEN UNIT 2 SAFETY RELATED MA I NTENANCE -
FEBRUARY, 1980 LER OR OUTAGE M/\\LFUNCTI OM IHJMIJER CAUSE RESULT CORRECT IV!:>: /\\CT I ON Outage #2-14 NA NA Calibrated both "A" & "B" loop flow instrumentation Outage 112-14 Loose Bolts Leakage Tightened bolts Outage #2-14 NA NA Replaced missing locknut Outage #2-14 NA NA Replaced magnets Outage //2-14 Damaged Valve.
Leakage Rebuilt versa valve Outage 112-2 NA NA Calibrated monitors &
clean*ed relay con tac ts
EQUIPMENT 3"B" LPCI Heat
~hanger Bypass Wive M0-3-1501-llB 3"B" Core Spray Relief Valve Monorail Hoist A.O. Valve 1601-60 Reactor-Turbine Interlock Door A.O. 1601-56 Versa Valve
~actor Building Vent "A" Inlet Isolation Valve NATURE OF MA I NTENANCE Preventive WR #4389 Corrective WR #4489 Preventive WR #4406 Corrective WR #4272 Preventive WR #4105 Corrective WR #3661 Preventive WR #4180 Reactor Building Preventive WR #4181 "B" Inlet Iso-latiou Valve Drywell Equip-ment Hatch Preventive WR #1854 A.O. Valve
. *--. Corrective WR #3748 160.1-23 L.P.R.M. 48-l 7A Preventive WR #4268 DRESDEN UNIT 3 SAFETY RELATED MANTENANC~ -
FEBRUARY, 1980 LER OR OUTAGE NUMBER Outage #3-12 Outage #3-12 LER#80-3/03L-0 Outage #3-12 Outage 113-12 Outage #3-12 Outage 1/3-12 Outage #3-1 Outage 113-1 Outage 1/3-2 Outage //3-12 Outage 1/3-12 HALFUNCT IOI~
CAUSE RESULT NA NA Pressure Out of Leakage Adjustment NA NA Damaged Air Leakage Cylinder NA NA Bad Valve Leakage NA NA NA NA NA NA Bad Air Cylinder Air Leakage NA NA CORRECTIVE
- ~TION Checked overloads -
check okay Adjusted pressure Adjusted intermediat~ limi Repaired air cylinder Replaced magnet Installed rebuilt valve Replaced solenoid valve Replaced solenoid valve Opened hatch Rebuilt cylinder Repal.red high voltage power supply ts.
DRESDEN UN IT 3 SAFETY RELATED MANTENANCE - FEBRUARY, 1980 NATURE OF LER OR OUTAGE MALFUNCT I Oil E().UIPMEIH I
MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE
!Removed shorting links Of fgas Monitors Preventive WR 113693
- outage 113-2 NA NA Checked cables with two
~eters - checked okay
EQUIPMENT Spare Recirc.
al Flange Standby Gas H angers Spare Control Rod Drive A ccumulator Diesel Generato1 Interlock Door Spare ma tic pare s
m a tic lve
- Electro-Operator Electro-Relief BK 7051
~-* -----
NATURE OF Ml\\ I NTElrnNCE Preventive WR #8456 Preventive WR #3515 Preventive WR #4232 Preventive WR #4.023 Preventive WR 114231 Preventive WR #3384 DRESDEN ur~ IT 2/ 3 SAFETY RELATED MAINTENANCE -
FEBRUARY, 1980 LER OR OUTAGE M/\\LFUNCTI Oii UUMOER CAUSE RESULT CORRECT IV!:"" ACTION NA NA Machined spare flange NA NA Replaced mi~sing lockouts
& tightened loose nuts NA NA Sc.rapped accumulator NA NA Replaced electric door latch NA NA Replaced defective switch NA NA Rebuilt valve
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE 2-1 to 2-29 FEBRUARY, 19 80 Unit One was shutdown for the entire month, continuing preparation for chemical cleaning and refueling.
2-1 to 2-3
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO FEBRUARY, 1980 Unit* Two started the month operating at a power level of 705 MWe.
On February 3, at 0040, Unit Two scrammed on low vacuum while transferring the Max-Recycle reboiler relief discharge line from Unit Three condenser to Unit Two condenser.
2-3 to 2-29 The Unit was ~laced back on line at 1120 on February 3 and operated the remainder of the month at an average power level of 724 MWe, with a capacity factor of 90.6% for the entire month.
1
~j' *. *
SUMMARY
OF OPERATING EXPERIENCE UNIT THREE FEBRUARY, 19 80 2-1 to 2-2 Unit Three started the month operating at a power level of 508 MWe.
On February 2, at 1040, Unit Three was taken off line due to an inoperable jet pump.
2-3 to 2-29 Unit Three commenced its scheduled re-fueling outage at 0800 on February 3, 1980.
By the end of the reporting period, all fuel had been removed, and CRD replacement completed.
Other major activities for this reporting period and for the remainder of the outage in-elude:
jet pump repair and inspection, installation of vent header deflectors, and downcomer support bracing in the torus.