ML17191B280
| ML17191B280 | |
| Person / Time | |
|---|---|
| Site: | Dresden, LaSalle |
| Issue date: | 03/16/1999 |
| From: | Skay D NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML17191B277 | List: |
| References | |
| NUDOCS 9903230323 | |
| Download: ML17191B280 (12) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 COMMONWEAL TH EDISON COMPANY DOCKET NO. 50-373 LASALLE COUNTY STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1 32 License No. NPF-11
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by the Commonwealth Edison Company (the licensee), dated December 17, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act}, and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-11 is hereby amended to read as follows:
l( 9903230323 990316
. PDR
- ' ADOCK 05000237
\\
P
~**
'\\ i.
I I
./
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
132, and the Environmental Protection Plan contained in Appendix B, with the Technical Specifications and the Environmental Protection Plan.
- 3.
. This license amendment is effective are hereby incorporated in the license. The licensee shall operate the facility in accordance as of the date of its issuance and shall be implemented within 60 days.
Attachment:
Changes to the Technical Specifications Date of Issuance: March 16, 1999 FOR THE NUCLEAR REGULA TORY COMMISSION
//..
-:;-::-I;:'
bet:/-
/~-
>._'../
, /,, -
/
Donna M. Skay, Project Ma~er Project Directorate 111-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO.
132 FACILITY OPERATING LICENSE NO. NPF-11 DOCKET NO. 50-373 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain a vertical line indicating the area of change.
REMOVE 3/4 0-1 B 3/4 0-5 INSERT 3/4 0-1 B 3/4 0-5 B 3/4 0-5a
3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding Specifications is required during the OPERATIONAL CONDITIONS or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated
- ACTION requirements shall be met, except as provided in Specification 3.0.6.
3.0.2 Noncompliance with a Specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals, except as provided in Specification 3.0.6. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be initiated to place.the unit in an OPERATIONAL CONDITION in which the Specification does not apply by placing it, as applicable, in:
- 1.
At least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- 2.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- 3.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual Specifications.
This specification is not applicable in OPERATIONAL CONDITION 4 or 5.
3.0.4 Entry into an OPERATIONAL CONDITION or other specified CONDITION shall not be made when the conditions for the Limiting Conditions for Operations are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval. Entry into an OPERATIONAL CONDITION may be made in accordance with the ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This provision shall not prevent passage through or to OPERATIONAL CONDITIONS as required to comply with ACTION requirements. Exceptions to these requirements* are stated in the individual Specifications.
3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is in.operable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system(s),
subsystem(s), train(s), component(s) and device(s) are OPERABLE, or likewise satisfy the requirements of this specification. Unless both conditions (1) and (2) are satisfied, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
- action shall be initiated to place the unit in an OPERATIONAL CONDITION in which the applicable Limiting Condition for Operation does not apply by placing it, as applicable, in:
- 1.
At least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- 2.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- 3.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
This specification is not applicable in OPERATIONAL CONDITION 4 or 5.
3.0.6 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to Specification 3.0.1 and 3.0.2 for the system returned to service under administrative control to perform the.
testing required to demonstrate OPERABILITY.
.~ SALLE - UNIT 1.
3/4 0-1 AMENDMENT NO. 132
I 3/4.0 APPLICABILITY BASES the onsite Class 1 E distribution system be OPERABLE. The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE. If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable normal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable LCOs. However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources instead, provided the other specified conditions are satisfied. In this case, this would mean that for one division the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundant systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of performing their design functions and have an emergency power source OPERABLE). In other words, both emergency power sources 0 and 1A must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, action is required in accordance with this specification.
In OPERATIONAL CONDITION 4 or 5, Specification 3.0.5 is not applicable, and thus the individual ACTION statement for each applicable Limiting Condition for Operation in these OPERATIONAL CONDITIONS must be adhered to.
Specification 3.0.6 This specification establishes the allowance for restoring equipment to service under administrative controls when it has. been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to Specification 3.0.1 and 3.0.2 (e.g., to not comply with the applicable Action(s)) to allow the performance of Surveillance Requirements to demonstrate:
a)
The OPERABILITY of the equipment being returned to service; or b)
The OPERABILITY of other equipment.
The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed Surveillance Requirements. This Specification does not provide time to perform any other preventive or corrective maintenance.
An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Actions and must be reopened to perform the Surveillance Requirements.
An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent the trip function from occurring during the performance of a Surveillance Requirement on another channel in the other trip system. A similar example of demonstrating the OPERABILITY of other equipment is taking an LA SALLE - UNIT 1 B 3/4 0-5 Amendment No. 1 32
ti 3/4.0 APPLICABILITY BASES inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of a Surveillance Requirement on another channel in the same trip system.
Specifications 4.0.1 through 4.0.5 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirement stated in the Code of Federal Regulations, 10 CFR 50.36(c)(3):
"Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions of Operation will be met."
Specification 4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL CONDITIONS or other CONDITIONS for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in an OPERATIONAL CONDITION or other specified condition for which the individual Limiting Conditions for Operation are applicable. Surveillance Requirements do not have to be performed when the facility is in an OPERATIONAL CONDITION for which the requirements of the associated Limiting.Condition for Operation LA SALLE - UNIT 1 B 3/4 0-Sa Amendment No. 1 32 l
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 COMMONWEAL TH EDISON COMPANY DOCKET NO. 50-374 LASALLE COUNTY STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 11 7 License No. NPF-18
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by the Commonwealth Edison Company (the licensee), dated December 17, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The fa~ility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; -
- C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-18 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
11 7, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
Attachment:
Changes to the Technical Specifications Date of Issuance: March 16, 1999 FOR THE NUCLEAR REGULA TORY COMMISSION
./'P,,...--"7 i
,/ /-7 * * ;.. L.J *;;,/.'°/ >:<~-/(1:c"
~o-~~; ~-.Skay, Project M-apf~--
Project Directorate 111-2
,_./
Division of Licensing Project Management Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO. 117 FACILITY OPERATING LICENSE NO. NPF-18 DOCKET NO. 50-374 Replace the following pages of the Apf)endix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain a vertical line indicating the area of change.
. REMOVE 3/4 0-1 B 3/4 0-5 INSERT 3/4 0-1 B 3/4 0-5 B 3/4 0-5a
3/4.0 APPLICABILITY
- LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding Specifications is required during the OPERATIONAL CONDITIONS or other conditions speci~ed thAerCeTin 1
0 eNxcept ~hat upon failure to meet the Limiting Conditions for Operation, the
- I associated requirements shall be met, except as provided in Specification 3.0.6.
3.0.2 Noncompliance with a Specification shall exist when the *requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals, except as provided in Specification 3.0.6. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be initiated to place the unit in an OPERATIONAL CONDITION in which the Specification does not apply by placing it, as applicable, in:
- 1.
At least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- 2.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- 3.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual Specifications.
This specification is not applicable in OPERATIONAL CONDITION 4 or 5.
3.0.4 Entry into an OPERATIONAL CONDITION or other specified CONDITION shall not be made when the conditions for the Limiting Conditions for Operations are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval.
Entry into an OPERATIONAL CONDITION may be made in accordance with the ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This provision shall not prevent passage through or to OPERATIONAL CONDITIONS as required to comply with ACTION requirements. Exceptions to these requirements are stated in the individual Specifications.
3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation provided: (1) its corresponding normal or emergency power source is OPERABLE.; and (2) all of its redundant system(s),
subsystem(s), train(s), component(s) and device(s) are OPERABLE, or likewise satisfy the requirements of this specification. Unless both conditions (1) and (2) are satisfied, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> action shall be initiated to place the unit in an OPERATIONAL CONDITION in which the applicable Limiting Condition for Operation does not apply by placing it, as applicable, in:
- 1.
At least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- 2.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- 3.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
This specification is not applicable in OPERATIONAL CONDITION 4 or 5.
3.0.6 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to Specification 3.0.1 and 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
- LA SALLE - UNIT 2 3/4 0-1 Arr.endment No. 11 7
\\j v
\\.J 3/4.0 APPLICABILITY BASES hour out-of-service time when both required offsite circuits are not OPERABLE. If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable normal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable LCOs. However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources instead, provided the other specified conditions are satisfied. In this case, this would mean that for one division the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundant systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of performing their design functions and have an emergency power source OPERABLE). In other words, both emergency power sources 0 and 2A must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, action is required in accordance with this specification.
In OPERATIONAL CONDITION 4 or 5, Specification 3.0.5 is not applicable, and thus the individual ACTION statement for each applicable Limiting Condition for Operation in these OPERATIONAL CONDITIONS must be adhered to.
Specification 3.0.6 This specification establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to Specification 3.0.1 and 3.0.2 (e.g., to not comply with the applicable Action(s)) to allow the performance of Surveillance Requirements to demonstrate:
a)
The OPERABILITY of the equipment being returned to service; or b)
The OPER.AHILITY of other equipment.
The administrative controls ensure the time the equipment is returned to service in conflict with.
the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed Surveillance Requirements. This Specification does not provide time to perform any other preventive or corrective maintenance.
An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Actions and must be reopened to perform the Surveillance Requirements.
An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent the trip function from occurring during the performance of a Surveillance Requirement on another channel in the other trip system. A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of a Surveillance Requirement on another channel in the same trip system.
LA SALLE - UNIT 2 B 3/4 0-5 Amendment No. 11 7
3/4.0 APPLICABILITY BASES Specifications 4.0.1 through 4.0.5 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirement stated in the Code of Federal Regulations, 10 CFR 50.36(c)(3):
"Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions of Operation will be met."
Specification 4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL CONDITIONS or other CONDITIONS for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in an OPERATIONAL CONDITION or other specified condition for which the individual Limiting Conditions for Operation are applicable. Surveillance Requirements do not have to be performed when the
- facility is in an OPERATIONAL CONDITION for which the requirements of the associated Limiting Condition for Operation do not apply unless otherwise specified. The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special LA SALLE - UNIT 2 B 3/4 0-5a Amendment No. 11 7