Text
.
I.
- Mr. Oliver D. Kingsl~y President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive T ewers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515
,.1._
October 26, l 99a3
SUBJECT:
DRESDEN MANAGEMENT MEETING
SUMMARY
Dear Mr. Kingsley:
The NRC staff met with Commonwealth Edison and Dresden Nuclear Power Station management on October 1, 1998. This management meeting was held in the Region Ill office and was open to public observation. Enclosure 1 contains the associated meeting summary. contains the handout provided by Commonwealth Edison during the meeting~.
In accordance with Section 2. 790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.
Docket Nos.: 50-237; 50-249 License Nos.: DPR-19; DPR-25
Enclosures:
- 1.
2..
Meeting Summary Meeting Handout See Attached Distribution Sincerely, Orig1mal signed by M. Ring Geoffrey E. Grant, Director Division of Reactor Projects DOCUMENT NAME: G:\\DRES\\DRE10018.SUM To receive e copy of this document, lndlc8te In the box *c*
- Copy without ettechment/endaure "E"
- Copy with 11tt11chment/11ncloaure "N" ~ No co OFFICE
- t. Riii E
NAME Grant~-(~
DATE 10rz£/98 OFFICIAL RECORD COPY 9811050122 981 PDR ADOCK 05~
p
. -v~7 PDR I
- 0. Kingsley cc w/encls:
D. Helwig, Senior Vice President H. Stanley, PWR Vice President C. Crane, BWR Vice President (J
R. Krich, Regulatory Sel'Vices Manager D. Greene, Licensing Director
- Distribution:
DCD - Licensing M. Heffley, Site Vice President
- . P. Swafford, Station Manager F. Spangenberg, Regulatory Assurance Manager R. Hubbard M. Aguilar, Assistant Attorney General State Liaison Officer Chairman, Illinois Commerce Commission Project Mgr., NRR w/encls J. Caldwell, Rill w/encls C. P.ederson, Rill w/encls
- 8. Clayton, Rill w/encls.
SRI Dresden w/encls DRPw/encls TSS w/encls DRS (2) w/encl Rill PRR w/
Is
. /
PUBLIC IE 1 w/encls -\\
A 1 j L
- Docket Fi w/encls
)(/~ \\ J GREEN
"" -g 1i I
Public Meeting Summary
-Management Meeting for Dresden Nuclear Power Station October 1 Managem~nt Meeting Summary:.
This management meeting was conducted as a part of continuing, periodic oversight of the performance of the Dresden Station. The most recent past public management meeting on Dresden was conducted on May 29, 1998, at the Dresden site and was largely focused on scram history and material condition. This October 1, 1998, meeting was primarily centered on recent difficulties with Technical Specification compliance and configuration control, work *
- control activities, and material condition improvements. From June 1998, through August 1998, the Dresden Station experienced approximately five instances where Technical 'Specification Limiting Conditions for Operation were inadvertently entered without operators being properly aware of the entry, including one instance where the Technical Specification requirements were actually violated. Com Ed presented a thorough discussion of the events, circumstances and causes contributing to their occurrence, and subsequent corrective actions* being taken by the Station. NRC representatives questioned ComEd on the specifics of some of the events and the corrective actions. The work control dialogue highlighted improvements made at Dresden from the state of work management deficiencies as of the beginning of 1998. In the area of material condition, ComEd discussed systems where improvements had resulted in relative success, such as the high pressure coolant injection and feedwater systems, as well as systems where further improvement is needed, such as the off gas system.
The licensee presented information contained in the applicable handout in Enclosure 2 during the meeting.
Partial List of Attendees:
J. Caldwell, Acting Regional Administrator, Region Ill M. Dapas, Deputy Director, Division of Reactor Projects (DRP), Riii
. L. Rossbach, Project Manager, Office of Nuclear Regulation (NRR) (by video conference)
L. Burkhart, Project Manager, NRR (by video conference)
M. Ring, Chief, Branch 1, DRP, Rill E. Duncan, Reactor Engineer, Division of Reactor Safety, Riii K. Riemer, Senior Resident Inspector, Dresden R. Lerch, Project Engineer, DRP, Rill Commonwealth Edison
- 0. Kingsley, President Nuclear Generation Group D. Helwig, Senior Vice President
.. J. Perry, BWR Vice President M. Heffley, Site Vice President, Dresden J. Benjamin, Vice President, Nuclear Oversight
- R. Krich, Vice President, Regulatory Services P. Swafford, Dresden Station Manager S. Barrett, Operations Manager R. Fisher, Maintenance Manager F. Spangenberg, Regulatory Assurance Manager D. Winchester, Site Nuclear Oversight
- Enclosure 2 Commonwealth Edison.
- Management Meeting Handout
- . Dresden Station NRC Management Review Meeting.*
Preston Swafford Station Manager
- October 1, 1998
Agenda o Technical Specification Compliance L. Coyle e
. and Configuration Management.
- Cl Work Planning D Work Execution o Materiel Condition Improvements Cl Closing Remarks R. Fisher R. Fisher M. Heffley
~,:/;::... --- Key Strategic Reform lniiiatives Addressing the Ongoing Issues o SRI 2 - Upgrade Operations Department Leadership Role in Ensuring Excellent Plant Operations 9
- SRI 2.1 - Reinforce Expected Standards of Performance
- SRI 2.2 - Operations Owns the Plant and Drives Standards of Excellence.
in Human Performance
- SRI 3 ~I /3.11 - Develop 1 and 3-Year Material Condition Plans
- !* SRI 3.2 - Implement Work Control Planning Process to Improve Ability to Execute Work
- !* SRI 3. 7 - Develop an On-line Maintenance Process
Technical Specification Management Dresden Operations*
.Technical Spe'cification Events:
- August 20, 1998
.
- August 6, 1998
- July 8, 1998 June 24, 1998 Handling 9f irradiated fuel with 'B' CR HVAC RCU inoperable.
Tech Spec LCO missed while 3A LPCI suction line OOS.
Operator missed entry into Tech Spec during Core Spray OOS.
Loss of Unit 2 Containment Differential Pressure during an IMD surveillance* due to inadequate parameter monitormg.
e.
. Root Clluse People
- Standards Non-Compliance
+Loss of dP on Unit 2
- Inadequate Attention to Problem
- Fundamental Expectation Lapses
+ LPCI Containment Cooling LCO
- . +Fuel Bundle Move*
- Knowledge Deficiency
+Core Spray PCIS
RootCiluse Processes*
- .Defense In-Depth Weak
+Procedure *
+Emergent Work Process.
Technical Specification Assists (SRI 2.6)
- Quad Cities, Byron, Duane Arnold, Browns.
Ferry, INPO Assist Visit points learned:
- +Emergent Work.
+Non-Operations Tech Spec Knowledge Level Weak
. Corrective Actions People
- Reinforced Expectations on Performance, Responsibilities, and Conduct (from SRO *.
Accountability Meetings) (SRI 2.1/2.3/2.5)
+Revised Training for RO's and SRO's
+Reinforced & Revised Work Execution Center Control Access to Main Control Room
. *. e
- Established Shift 2 an*d 3 Work Execution.
Corrective Actions People (Cont.)
- Enhancement of Operations Tech. Spec.
Knowledge (SRI 2.3)
- +Completed SRO-L Training and Exam
.. +Performed Challenge Exams on Operating
- Teams ~ 92% I 100% - 92% Pass Rate
- Concern from Challe~ge Exams
+Error Rate = 1 per 1000 Challenges
Corrective Actions People (Cont.)
- Operations Continuing Training (SRI 2.3)
- +lnitiate*d Weekly Tech Spec Written Exams
+Initiated Tech Spec Section-By-Section
- Training with Daily Quizzes
- Enhancement of Site Tech. Spec.
- Knowledge
+Conducted Work Week Manager Training and Exams
Corrective Actions
- Procedures and Processes*
- *Operations Work Policy 13 Revised (SRI 2.4/2.6)
+ Placed Tech Spec in Daily Schedule
+ Placed Tech Spec Mode Changes in Schedule
+ Added Checklist Review for Emergent Work to Simulate 5-Week Review Process
- Established Tech Spec Matrix (SRI 2.4)
+ Nuclear Oversight Review & Revision
- Established Formal Process for Tech Spec Review (SRI 2.4)
- Revising Procedures to Reference Tech. Specs. (SRI 2.4)
Corrective Actions Overviews (SRI 2.8 and 2.9)
- Operations Management
- +One of five Operations Senior Managers every*
working day*
- Additional Overviews Performed by:
+Shift Managers *
+On-call response teams
+Training Personnel
+Nuclear Oversight
~Senior Management
- *:* 0645 and 1530 Discussions *
.e
___ Technical Specifi'cation. Events Per Month for Dresden Station 10 10 9
9 8
8 7
7 6
6 5
5 4
3 3
4 3
3 2
1 1
2 1
1 0
0 0
1 0
0 0
0.. 0 0
0 0
0 0
e
- Technical Specification Events
. I.-I --------.-L-E_R_E_ve_n-ts-------------.1
'---------------=-----------'
Configuration COntrol Events Per Month for Dresden Station 10--~~~~-9~~~~~~~~~~~~~
9 8
7 6
5 4
3 2
1 0
- Configuration Control Events
Operations Goal:
Error-Free Per/ ormance.
- Peer Check on Power-Block*& Control Room.
Component Manipulations
- Non-scheduled Work Has to Be Evaluated Per Ops Policy 13 (Emergent Work Policy)
- Operations Management Perf arming 2 Hour Daily Improvement Items
- Senior Operations Management "Day in Plant"
- Mid Shift Reviews Between the Ops Manager, SOS.
and Shift Manager*
- Operations Team Re-organization
The Road to Error-Free Performance
- Identified Adverse Trend
- Implemented Corrective Actions..
- . +Nuclear Oversight performing increased oversight of*
supervisory effectiveness
- Observed Minor, Initial, Incremental
- Improvement
- e.
- - Awareness & Ownership raised throughout the Department
DRESDEN WORK Dlllmil-M AN AGE MEN T "Getting Work Done 1998" o Work Control Process Development o Work Control Process Results Note 1:
Note 2:
Nuclear Generations Group.
Strategic Reform Initiatives (SRI X.X)
Nuclear Oversight Identified (N.0.)
January1998 Work Management Deficiencies o Work Planning (N.O.)
. *:* Parts Procurement-Problems
- Work Package Closeout Deficiencies.
- D Work Prioritization.
- D LCO Planning (N.O.)
f 7 Screening and Scheduling
- D* Developed and Implemented Work Screening
_ e Process
- D Designed and Created Fix It Now (FIN) Team
. D Developed and Implemented Scheduling Process D Developed and Implemented Daily Work Process Monitoring
f 8 Work Planning Improvements o Developed and Implemented NSP-WC-3005 Work Planning *
(SRI 3.2) o Developed and Implemented NSP-MS-3100/3400 Parts and Services Procurement o Established a Full Work Planner Organization (SRI 5.1 - 5.3) o Developed and Delivered Work Planner Training o Benchmarked and Adopted a Standard Work Package o Developed and Implemented (DAP 18-09) High Risk Screening. (SRI 3.4) * *.
o Created Bill of Materials (Due 12/31/99)
- ork Prioritization Improvements
. D Peveloped a 1 and 3 Year Material Condition Pla~
(SRI 3.l/3J 1)
W'
- D Established a Plant Health Committee {SRI 3.. 11)
. D Implemented a System Health Process (SHIP Report) (SRI 3.5) o Developed and Implemented E6 to E 12 Work Control
. Process.
t ork Process Result Indicators
- (SRI 1.0) o Schedule Adherence
- o PM Tasks Overdue/PM Tasks Past Critical o LCO Performance D*Rework o Radiation Exposure o Non Outage Backlog o System Material.Condition Improvements o Maintenance Rule A 1 o Capacity Factor
ercent Schedule Adherence Measured Within the Week 90 80 70 60........................................................ :..................................... *.*.... ;.......................
50........*........................... *........................................................................................
JAN FEB MAR APR MAY JUN JUL AUG SEP
....,.._ 1998
--Goal
Total Number Overdue/Past Critical 35
- -~*-*'***************************************:............................-..........................
32 30.................................................... *****.....................
Good 25..................... *********................................................
21 20 *********************************************************
15..................... *.***................. ****.*.........
. 10........................................................
5.......................
0 0 0 0 0 0 0 0
. 0 +-------~
Oct-97 Nov-97 Dec-97 Jan-98 Feb-98 Mar-98 Apr-98 May-98 Jun-98
- Jul-98 Aug-98 Sep-98
- Overdue
- Past Critical
o U2/3 EDG LCO Scheduled 2/2/98
- Scheduled for 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />
- Completed in 179 hours0.00207 days <br />0.0497 hours <br />2.959656e-4 weeks <br />6.81095e-5 months <br />, 32 minutes*
- *:* Scheduled for 86 hours9.953704e-4 days <br />0.0239 hours <br />1.421958e-4 weeks <br />3.2723e-5 months <br />
- Completed in 64 hours7.407407e-4 days <br />0.0178 hours <br />1.058201e-4 weeks <br />2.4352e-5 months <br />, 30 minutes..
- 6 PIF's generated
4 J.
- ********************************************************-~--n********************
UGood 1
1997 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC c::J 1997
_...._ 1998.
--Goal
__.,_;Industry Average
ollective Radiation Exposure 4SO....,......~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--.
400 JSO 300
....................................................... -..... -.. *....................... -................................. -............ ~.................. -............................ -.........
2SO 200 ISO 100 so 0
t99S 1996 1997 JAN FEB MAR APR MAY JUN JUL AUG *SEP OCT NOV DEC
- 1995 CJ 1996 111111997
__.,._ 1998 Cumulative Dose
--1998 Cumulative Goal
Non-Outage CorrectiVe
- Maintenance Backlog 1400....------------------------------.,
.1200.................... ******* ********.............. *........... :.............................. {} *c~~d*...... :...
1000 800 600 400 200 1997 JAN FEB
. MAR.
APR MAY JUN JUL AUG SEP
--Goal I
System Materiel Condition*
1 mp rove men ts D HPCI. Maintenance Rule (a)( 1)
- Entering monitoring phase today
- Replaced GSLO float switches
- Repaired MOV 2-2301-3 seat leakage SHIP Red
- SHIP Yellow
. D Feedwater Maintenance Rule (a)(2) SHIP White
- !* Restored 3-element Control*
- Replaced 2B FW Reg Valve internals D Off Gas Maintenance Rule (a )(1)
SHIP Red
- !* Improving condition
- 3A & B.Trains Available
- 2A Available; 2B Upstream Recombination - Testing Week of 10/12
- e.
____ System Materiel Condition Improvements
.o Fire Protection Maintenance Rule (a)(l). SHIP Yellow
- Scheduled to be (a)(2) by 12/31/98 SHIP White
- Backlog Reductions in last year; 124 to 67
- Major Yard Loop repairs
- 3 WR's remaining >2yrs. old scheduled to be at 0 by year end.
. D HV AC Systems 3 are Maintenance Rule (a)(l)
. *:* 2 Systems are in the monitoring phase
- Backlog reductions in the last year; 51 to 3 6
- Replaced 43 damp~rs
- o Advanced Resin Cleaner, fully operational by year end
- Reduces Resin Loss by 90%
- !* Reduces water usage from 20,000 gals. To 5,000 gals.
D 18 Procedures Changed (Created/Modified/Deleted) 9 *
- D 14 Modifications to Design
- Cl 40 Modifications Scheduled for Design D 10 PM's Changed.
- D 2200 PM's Validated/Reviewed
aintenance Rule (a)(l)Systems 26 25 24 24 23 24 23 20 19 20 15 13 (Projected) 15 11 10 0
Jan-98 Feb-98 M ar~98 Apr-98 M ay-98 Jun-98 Jul-98 Aug-98 Sep-98 Oct-98 N ov-98 Dec-98
- Dresden (a)(1) Systems
-+-Dresden 1998 0 bjective
1 Dresden Station Capacity Factor*
90 80 70
...................................................... tt...........
LJ Good 5o 1997 JAN FEB MAR APR MAY JUN JUL AUG
- 1997
-u2 Goal
__.__ U3 Goal U2 1998
--uJ 1998
losing Remarks
- * *
- CJ ISi Closed d E&TS Inspection Completed
- . o OSRE Inspection Satisfactory
.. * *o FPFI.(September-October 1998) _*
~
~.*' -