Summarizes Telcon Re Deletion of Commitment to Differential Pressure Test MOV 3-2301-10 & 3-2301-14 at Plant Unit 3. Respond within 30 Days If Disagrees W/This Summary of Telcon
ML17191A818
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/03/1998
From: Rossbach L
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
TAC-MA0335, TAC-MA335, NUDOCS 9808070196
Download: ML17191A818 (4)


Text

'.... -. ~ -* ---.-----**--

--~--------*,.,...... __....... ~---*.... ------*------.. -:...-----..,,_ ____ -- -*-*~"-- '*'**--*----* ~----

~

UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 500

  • Downers Grove, IL 60515 WASHINGTON, D.C. 20555--0001 August 3, 1998

SUBJECT:

DELETION OF COMMITMENT FOR DRESDEN, UNIT 3 (TAC NO. MA0335)

Dear Mr. Kingsley:

By letter dated October 15, 1993, Commonwealth Edison Company (ComEd) committed to

As described in the December 1, 1997 letter, ComEd made its determination based on the results* of differential-pressure tests of functionally-equivalent valves at Dresden, Unit 2. For example, ComEd reported that the valve factors determined from the differential-pressure tests of these MOVs in Unit 2 were significantly less than the valve facto~ assumed in the design calculations and, therefore, additional design margins exist in these MOVs. Further, ComEd described concerns with the elevated level and temperature of the suppression pool that would result from the extended operation of the HPCI system that is necessary to perform these valve tests.

The staff held telephone conferences with ComEd personnel on December 22, 1997, and February 10, 1998, to discuss ComEd'sjustification for eliminating these MOV tests at Dresden, Unit 3. During these telephone conferences, ComEd reported that they had reviewed test information from other ComEd nuclear plants and other nuclear utilities. This information suggested that the valve factor assumptions for these types of valves at Dresden are conservative compared to the test data. ComEd also stated that the diagnostic traces for these MOVs at Dresden did not reveal any adverse anomalies. Finally,.ComEd reported significant operating margin for MOVs 3'-2301-10 and 3-2301-14 at their present setup conditions above the predicted thrust requirements.

Based on the information obtained from ComEd during these telephone conferences and the staffs review of the December 1, 1997 letter, the staff finds that ComEd has provided a r

.-..:.-~q=a'""0""8.k0~70"'1n9n6:--aq90.offi9:itoY.3a-e--t:-~ u---..,1 PDR ADOCK 05000247 p

PDR

(. __ _

.1.

~

0. Kingsley
August 3, 1998 reasonable basis to eliminate its previous commitment to differential-pressure test MOVs 3-2301-10 and 3-2301-14 at Dresden, Unit 3. Please notify us within 30 days if ComEd disagrees with this summary of our telephone conferences on this subject.

Docket No. 50-249 cc: See next page

.. * ~. >

\\.

DISTRIBUTION:

,, Doc~effile PUBLIC.

PDlll-2 r/f

  • E. Adensam, EGA 1 S. Richards C. Moore L. Rossbach D. Terao OGC, 015B18 ACRS, T2E26 M. Ring, Rill J. Gavula, Rill I.

'j.

Sincerely,...

ORIG. SIGNED,.*BY:

Lawrence W. Rossbach;* Project Manager

..,, Project Di,rector;:ite Ill::~ *

... Divisiqn: of Reactor Projects - Ill/IV

"., :,Offic~ of Nuclear Reactor Regulation

  • \\,

'l

-~'.. - '

I.

  • ~. \\

,~. -

~

  • Concun:ence provided by 2/19/98 memo; no major changes DOGUMENT NAME: G:\\CMNTSP\\DRESDEN\\DR0335.L TR TO RECEIVE A COPY OF THIS DOCUMENT INDICATE IN THE BOX: "C" =COPY WITHOUT ENCLOSURES "E" =COPY WITH ENCLOSURES "N" OFFICE PM:PDlll-2.

C C:EMEB D:PDlll-2 NAME LRossbach:sp

. DTerao*

DATE

ff<P, J

/98

/98 02/19/98 OFFICIAL RECORD COPY

/..

--- _.... ~-*-- ---

0. Kingsley reasonable basis to eliminate its previous eommitment to differential-pressure test MOVs 3-2301-10 and 3-2301-14 at Dresden, Unit 3. Please notify us within 30 days if ComEd disagrees with this summary of our telephone conferences on this subject.

Docket No. 50-249 cc: See next page Sincerely, Lawrence W. Rossbach, Project Manager Project Directorate 111~2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation

0. Kingsley Commonwealth Edison Company cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Commonwealth *Edison Company Site Vice President - Dresden 6500 N. Dresden Road Morris, Illinois 6045~9765 Commonwealth Edison Company Dresden Station Manager 6500 N. Dresden Road Morris, Illinois 6045~9765 U.S. Nuclear Regulatory Commission Dresden Resident Inspectors Office *

  • 6500 N. Dresden Road Morris, Illinois 6045~9766 Regional Administrator U.S. NRC, Region Ill 801 Warrenville Roa~

Lisle, Illinois 60532-4351 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Chairman Grundy County Board Administration Building 1320 Union Street Morris, Illinois 60450 Document Control Desk-Licensing Commonwealth Edison Company 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 Commonwealth Edison Company Reg. Assurance Supervisor - Dresden 6500 N. Dresden Road Morris, Illinois 60456-9765

_......,_ ________ **------------*-.. ~-*

-~--***----*-*---***---**-

_;.~.-*..... ~-*-*-**

Dresden Nuclear Power Station Units 2 and 3 Mr. David Helwig Senior Vice President Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 900 Downers Grove, IL 60515 Mr. Gene H. Stanley.

PWR's Vice President Commonwealth Edison Company

  • Executive Towers West Ill 1400 Opus Place, Suite 900 Downers Grove, IL 60515 Mr. Steve Perry BWR's Vice President Commonwealth Edison Company Executive Towe rs West Ill 1400 Opus Place, Suite 900 Downers Grove, IL 60515 Mr. Dennis Farrar Regulatory Services Manager Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515 Ms. Irene Johnson, Licensing Director Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 500 DownersGrove, IL 60515 Mr. Michael J. Wallace Senior Vice* President Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 900 Downers Grove, IL 60515