Forwards Insp Repts 50-237/98-11 & 50-249/98-11 on 980316-20 & 23-24.No Violations Noted.Focus of Insp Was to Review Radiological Planning & Work Control Processes,Overall Radiological Performance & Effectiveness of ALARA Program
ML17191A596
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/10/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML17191A597 List:
References
50-237-98-11, 50-249-98-11, NUDOCS 9804170102
Download: ML17191A596 (3)


See also: IR 05000237/1998011

Text

April 10, 1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company .

ATTN: Regulatory Services

Executive Towers West Ill

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT:

NRC INSPECTION REPORTS 50-237/98011 (DRS); 50-249/98011 (DRS)

Dear Mr. Kingsley:

On March 24, 1998, the NRC completed an inspection at your Dresden Generating Station,

Units 2 and 3. The enclosed report summarizes the results of this inspection.

The inspection was an examination of activities conducted under your license as they relate to

radiation safety and to compliance with the Commission's rules and regulations and with the

conditions of your license. The inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel. Specifically, the focus

. of the inspection was to review the radiological planning and work control processes, the overall

radiological performance, and the effectiveness of the as-low-as-reasonably-achievable

(ALARA) program and associated dose controls for the ongoing Unit 2 refueling outage.

Overall, the radiological control of work activities for the Unit 2 refueling outage (D2R15) was

generally good, with some exceptions related to drywell work coordination and oversight. No

violations of NRC requirements were identified. Good ALARA initiatives and job planning were

instrumental in controlling dose, and efforts to prevent intake of radioactive material and limit

personnel contamination events were generally successful. However, dose goals were

challenged by weaknesses in the scaffolding construction program and associated work control

process, and work scope growth after outage dose goals were established. Radiation work

practices and radiological housekeeping problems occurred early in the outage; however, with

the exception of certain drywell housekeeping and material condition problems, improvements

were noted during the inspection.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be placed in the Public Document Room.

9804170102 980410

PDR

AOOCK 05000237

G

POR

0. Kingsley

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Director

Division of Reactor Safoty

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure: Inspection Reports 50-237/98011 (DRS); 50-249/98011 (DRS)

cc w/encl:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President

P. Swafford, Station Manager Units 2 and 3

F. Spangenberg, Regulatory Assurance

  • Manager

Richard Hubbard

Nathan Schloss, Economist

Office .of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:DRS\\DRE98011.DRS

w/aWend "N" = No co

~ Riii

NAME

i:r'"/

GShear (i;l!;J

MRing.

DATE

04/B/98

04ft/98

OFFICIAL RECORD COPY .

Distribution:

SAR (E-Mail)

Project Mgr., NRR w/encl

A. Beach w/encl

J. Caldwell w/encl

B. Clayton w/encl

SRI Dresden w/encl

DRP w/encl

TSS w/encl

DRS w/encl

R111 PRCwtenc

P.U8UC

w/encl

Docket ile w/ertcl

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)