Ack Receipt of 950901 & 1122 Ltrs Informing NRC of Unavoidable Delays in Completion of Atlernate Power Sources Being Installed at Plant,Units 2 & 3
ML17187B152
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/08/1997
From: Stang J
NRC (Affiliation Not Assigned)
To: Johnson I
COMMONWEALTH EDISON CO.
References
TAC-M97947, TAC-M97948, NUDOCS 9710220003
Download: ML17187B152 (5)


Text

  • '

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 8, 1997 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

IMPLEMENTATION OF STATION BLACKOUT RULE MODIFICATIONS FOR DRESDEN, UNITS 2 AND 3 (TAC NOS. M97947 AND M97948)

Dear Ms. Johnson:

5()-237 By letters dated September 1 and November 22, 1995, Commonwealth Edison Company (ComEd, the licensee) informed the NRC of unavoidable delays in the completion of the Alternate AC (AAC) power sources being installed at Dresden, Units 2 and 3, to meet the requirement of 1 O CFR 50.63 - Station Blackout (SBO) rule. In the letters, Com Ed committed to complete all SBO modifications before the restart of each unit from the next scheduled refueling outage for each unit. The next scheduled refueling outage for Unit 2 was D2R14 (April 1996) and the next scheduled refueling outage for Unit 3 was D3R14 (December 1996).

The NRC staff reviewed the remaining modifications to be completed in the upcoming refueling outages and what had already been installed at the station to cope with SBO. Based on the licensee's information, the staff concluded that the new schedule for completing the SBO

  • modifications was acceptable. By letter dated December 18, 1995, the staff granted the licensee's request for extending the schedule for completing the SBO modifications. In the letter, the NRC requested that Com Ed provide written confirmation of the completion of the SBO modifications 30 days following the restart of each unit from the upcoming refueling outages.

By letter dated December 17, 1996, ComEd informed the staff that all SBO modifications had been completed for Unit 2 and that the D3R14 refueling outage completion had changed from December 1996 until June 1997. Dresden, Unit 2, restarted from D2R14 on April 15, 1996.

By letter dated September 4, 1997, ComEd informed the NRC staff that all SBO modifications had been completed for Dresden, Unit,3, during D3R14. Dresden, Unit 3, restarted from its refueling outage on June 16, 1997.

ComEd has not been timely in providing the requested 30-day written confirmation on the completion of the SBO modifications. On a similar issue, by letter dated October 8, 1996, ComEd reported on testing and inspection of the Emergency Core Cooling System suction

. strainers required by NRC Bulletin 95-02, "Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode." The confirmations of the test results were to be provided to the NRC with 1 O days following the required testing and inspection. The testing and inspection were completed on May 29, 1996; however, the results

. I were not provided in writing to the NRC until October 8, 1996.

\\ *

~

~yo 1

~ D 9710220003 971008 PDR ADOCK 05000237 p

PDR

~1 ITTmn111111111111111111111111111111I ~tjfIB© ~n~~ u:;rmmm c*w

  • -*-****---*--.-----... ----------*-****-.-----........... ~-*--.,-----

1 5

9 7

TIME REQUESTED The NRC requests that ComEd take specific action to ensure that future correspondence regarding the written confirmation of the corf91teti'00TD~~g~lQf:Y2requirements and other required actions be issued in a timely manner.- This wilr allow the design bases of the facility and the Updated Final Safety Analysis to reflect the up-to-date plant conditions.

This completes the staffs actions under TAC Nos. M97947 and M97948.

Docket Nos. 50-237, 50-249 cc: see next page DISTRIBUTION:

Docket File PDlll-2 r/f R. Capra J. Stand ACRS, T2E26 PUBLIC E. Adensam OGC, 015818 C. Miller, Riii C~ Moore Sincerely, ORIGINAL SIGNED BY:

John F. Stang, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation DOCUMENT NAMI: G:\\~NTJR\\DRESDEN\\DR97947.LTR To receive a copy of h s;:focunent,,.-i-i:i._dicat~. in the box:

"C" =Copy without e nclosures "E" = Copy with enclosures "N" = No copy OFFICE PM: f D ~r t'>2

_A: r~n\\I-2 D:PDIII-2 ~

NAME JST/ ~I l\\.J

~MOQ~~ \\

RCAPRA (1..CJ-<./

DATE 10/ ~ 197 10/fl 197 10/ ~'S/97 OFFICIAL RECORD COPY

The NRC requests that ComEd take specific action to ensure that future correspondence regarding the written confirmation of the completion of regulatory requirements and other required actions be issued in a timely manner. This will allow the design bases of the facility and the Updated Final Safety Analysis to reflect the up-to-date plant conditions.

This completes the staffs actions under TAC Nos. M97947.and M97948.

Docket Nos. 50-237, 50-249.

cc: see next page DISTRIBUTION:

Docket File PDlll-2 r/f R. Capra J. Stand ACRS, T2E26 PUBLIC E. Adensam OGC, 015B18 C. Miller, Riii C. Moore Sincerely, ORIGINAL SIGNED BY:

John F. Stang, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation DOCUMENT NAM G:\\C NT JR\\DRESDEN\\DR97947.L TR "E" = Copy with enclosures "N" = No copy D:PDIII-2 ~

RCAPRA Q...~

10/ 41~ 197 OFFICIAL RECORD COPY

I

  • The NRC requests that ComEd take specific action to ensure that future correspondence
  • regarding.the written confirmation of the completion of regulatory requirements and other required actions be issued in a timely manner. This will allow the design bases of the facility and the Updated Final Safety Analysis to reflect the up-to-date plant conditions.

Docket Nos. 50-237, 50-249 cc: see next page Sincerely,

. !:. ~~or Projeci Manager Project Directorate 111-2 Division of Reactor Projects - Ill/IV

  • Office of Nuclear Reactor Regulation

-*----~~------~ *-**-------------.. **~*

      • -*--**-****~--*****-*-**-**
  • I. Johnson Commonwealth Edison Company cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Site Vice President Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 Station Manager Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station 6500 North Dresden Road Morris, Illinois 60450-9766 Regional Administrator U.S. NRC, Region Ill 801 Warrenville Road Lisle, Illinois 60532-4351 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Chairman Grundy County Board Administration Building 1320 Union Street Morris, Illinois 60450 Document Control Desk-Licensing Commonwealth Edison Company 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 Dresden Nuclear Power Station Unit Nos. 2 and 3