Commonwealth Edison Company Dresden Station NOTICE OF VIOLATION Docket Nos. 50-237: 50-249 License Nos. DPR-19; DPR-25.
EA 96-391 During an NRC inspection conducted from September 1 through October 18. 1996.
a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions."
NUREG-1600. the violation is listed below:
- .Technical Specification 3.7.A.2 requires. in part. that primary containment integrity be maintained at a 11 ti mes wh.en th_e reqctor is critical.
Technical Specific.ation 3. 7.A.2.b(2)(a) states. in.part.. that when primary containment integrity is required. primary containment leakage shall be limited to a combined leakage* rate of les~ than or equal to 60 percent of La for all testable penetrations and isolation valves subjett tq Type B and C tests.
C6ntrary to the abov~. between January 16, 1995 and.May 28. 1995. with the* reactor critical. primary containment leakage.was greate'r than 60 percent of.La due to leakage past the Unit 3 mair:i ste*amJine drain primar*y containment isolation valves. 3-_220-1 and 3:.220-2.
. line drain isolation*valv~s 3-220-1.and 3-220-2 are isolation valves subject to Jype B and C tests.
This is a Severity* Level JII violation CSuppl~ment I)~
The NRG ha*s concluded that information regarding the reason for th~* violation.
the corrective*actions taken and planned to correct the violation and preve~t recurrence is already adequately addr~ssed on the docket in Inspection Report.
Nos. 50-237;249/96013CDRP). LER 249/95007. and your response lo the inspect.ion report dated January 28. 1997.
- However. you are required to Tesponp to the*
provisions df 10 CFR 2.201 if.the description in the docketed materials *
- referenced above does not accurately reflect your corrective actions or your.
position.* In that *case.* or if yoLl choose to respond. clearly mark your response as a "Reply to Notice.of Violation." and send it to the U.. s.. Nuclear Regulatory Commission. ATIN:
Document Control Desk. Washington. D.C..20555
- with a copy to the Regional Administrator-. Region III. and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice. within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
Dated at Lisle. I~linois this 30th of May 1997 9706050027 970530 PDR ADOCK 05000237 G
I i*
I J. S. Perry.
.DISTRIBUTION:.
- PUBLIC IE--01 SECY CA LCa 11 an. EDO EJordan. DEDO LChandler. OGC JGoldberg. OGC SColl ins. NRR RZimmerman. NRR Enforcement Coordinators RI. RII and.RIV Resident Insp~ctors-Dresden.
LaSalle. Quad Cities**
. R. Capra. NRR J. Stang. NRR JGilliland. OPA.
HBell. OIG GCaputo. OI DRo.s s..AEOD OE:ES OE:EA (2)
RAO:RIII
- .SLO:RIII PAO: RI Il..
OC/LFDCB
- DRP Docket File*