ML17181A417

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - LIC-109 Acceptance Review of the St. Lucie 1 Relief Request (MF9826)
ML17181A417
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/30/2017
From: Perry Buckberg
Plant Licensing Branch II
To: Frehafer K
Florida Power & Light Co
References
MF9826
Download: ML17181A417 (2)


Text

NRR-PMDAPEm Resource From: Buckberg, Perry Sent: Friday, June 30, 2017 12:28 PM To: 'Frehafer, Ken' Cc: 'Snyder, Mike'; Shoop, Undine

Subject:

LIC-109 Acceptance Review of the St. Lucie 1 Relief Request (MF9826)

Ken, By letter dated June 12, 2017, Florida Power & Light submitted a relief request for St. Lucie Plant Unit No. 1 for the examination of the reactor vessel upper shell-to-flange weld. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours4.167 days <br />0.595 weeks <br />0.137 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which will be in June 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review.

Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact the St. Lucie Project Manager, Perry Buckberg, at (301) 415-1383.

Thanks, Perry Buckberg Senior Project Manager phone: (301)415-1383 perry.buckberg@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-8B1a Washington, DC, 20555-0001 1

Hearing Identifier: NRR_PMDA Email Number: 3588 Mail Envelope Properties (2935d9fef4394f0190bebdc002851d55)

Subject:

LIC-109 Acceptance Review of the St. Lucie 1 Relief Request (MF9826)

Sent Date: 6/30/2017 12:27:44 PM Received Date: 6/30/2017 12:27:45 PM From: Buckberg, Perry Created By: Perry.Buckberg@nrc.gov Recipients:

"'Snyder, Mike'" <Mike.Snyder@fpl.com>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None

"'Frehafer, Ken'" <Ken.Frehafer@fpl.com>

Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 2835 6/30/2017 12:27:45 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: