Forwards SE Accepting Licensee 941019 Proposal to Verify Integrity & Operational Readiness of Main Steamline Drain Piping,Outlined in Release Request PR-19
ML17180A986
Person / Time
Site: Dresden 
Issue date: 10/26/1994
From: Capra R
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML17180A987 List:
References
TAC-M90687, NUDOCS 9410310251
Download: ML17180A986 (3)


Text


e October 26, 1994 I.

6.,;.,-

.f!fr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III, Suite 500 1400 OPUS Pl ace Downers Grove, IL 60515

SUBJECT:

EVALUATION OF REQUEST FOR RELIEF RELATED TO THE THIRD TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM FOR DRESDEN NUCLEAR POWER STATION, UNIT 2 (TAC NO. M90687)

Dear Mr. Farrar:

By letter dated October* 19, 1994, you submitted Revision 4 to the third ten-year interval inservice inspection (ISI) program plan. Revision 4 requests the staff's review and approval of Relief Request PR-19.

Relief Request PR-19 proposes alternate pressure testing requirements for the new main steamline drain piping installed during the current forced maintenance outage.

The staff has reviewed the relief request.

The staff's evaluation and conclusion are contained in the enclosed Safety Evaluation (SE).

The staff has concluded that the alternative testing proposal in Relief Request PR-19 is acceptable and relief is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

This relief is a one-time temporary relief to allow Unit 2 to restart from the current forced maintenance outage.

Once the unit is restarted, it will operate for approximately six ~onths. At the end of the six months, the unit will be shut down for a refueling.outage.

Prior to restart from the refueling outage, the main steamline drain piping shall be tested in accordance with Section XI of the ASME code.

Sincerely, original signed by Robert A. Capra, Director Project Directorate III-2

~- ~~~031g5ga z~i8a~~;~---1 l

.PDR.

. - e --- -*- - I_ -- *- -

~ -

Docket No. 50-237

Enclosure:

Safety Evaluation cc w/encl: See next page DISTRIBUTION:

Docket File J. Roe G. Hill (2)

OGC ACRS (4)

  • See previous concurrence.

DOCUMENT NAME:

DRESDEN\\DROOOOO.LTR Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation PUBLIC OC/LFDCB P. Hiland Riii PDI 11-2 r/f To receive a copy of this doclJlleflt, indicate in the box:

°C0 = Copy without enclosures "E" = Copy with enclosures 11N° = No copy OFFICE LA: PDll I-2 I PM: PDI II-2 I BC:EMCB I

OGC I

D:PDIII-2 I r;.

NAME

. CMOORE

  • JSTANG:jar
  • JSTROSN IDER
  • RCAPRA ~

DATE 10/ /94 10/ /94 10/ /94 10/ /94 10/'2.'-/94 28UC?8 OFFICIAL RECORD COPY

  • 1

Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West Ill, Suite 500 1400 OPUS Place Downers Grove, IL 60515 October 26, 1994

SUBJECT:

EVALUATION OF REQUEST FOR RELIEF RELATED TO THE THIRD TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM FOR DRESDEN NUCLEAR POWER STATION, UNIT 2 (TAC NO. M90687)

Dear Mr. Farrar:

By letter dated October 19, 1994, you submitted Revision 4 to the third ten-year interval inservice inspection (ISi) program plan. Revision 4 requests the staff's review and approval of Relief Request PR-19.

Relief Request PR-19 proposes alternate pressure testing requirements for the new main steamline drain piping installed during the current forced maintenance outage.

The staff has reviewed the relief request. The staff's evaluation and conclusion are contained in the enclosed Safety Evaluation (SE).

The staff has concluded that the alternative testing proposal in Relief Request PR-19 is acceptable and relief is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

This relief is a one-time temporary relief to allow Unit 2 to restart from the current forced maintenance outage.

Once the unit is restarted, it will operate for approximately six months.

At the end of the six months, the unit will be shut down for a refueling outage. Prior to restart from the refueling outage, the main steamline drain piping shall be tested in accordance with Section XI of the ASME code.

Docket No. 50-237

Enclosure:

Safety Evaluation cc w/encl:

See next page DISTRIBUTION:

Docket File J. Roe G. Hill (2)

OGC ACRS (4)

  • See previous concurrence.

Sincerely, original signed by Robert A. Capra, Director Project Directorate 111-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation PUBLIC OC/LFDCB P. Hiland Rill PDIII-2 r/f DOCUMENT NAME:

DRESDEN\\DROOOOO.LTR l"o receive a copy of this docunent. indicate in the box: *c* = Copy without enclosures *E* = Copy with enclosures *N* = No copy OFFICE LA:PDI.II-2 I PM:PDIII-2 I BC:EMCB I

OGC I

D:PDIIl-2 I r:;.

NAME CMOORE

  • JSTANG:jar
  • JSTROSNIDER
  • RCAPRA ~

DATE 10/ /94 10/ /94 10/ /94 10/ /94 10/2.,/94 OFFICIAL RECORD COPY

Mr. D. L. Farrar Commonwealth Edison Company cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. J. Stephen Perry Site Vice President Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 Mr. J. Eenigenburg Station Manager, Unit 2 Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 Mr. D. Bax Station Manager, Unit 3 Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station 6500 North Dresden Road Morris, Illinois 60450-9766 Regional Administrator U.S. NRC, Region III 801 Warrenville Road lisle, Jllinois 60532-4351 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Chairman Grundy County Board Administration Building 1320 Union Street Morris, Illinois 60450 Dresden Nuclear Power Sfation Unit Nos. 2 and 3