Forwards Insp Repts 50-237/93-24 & 50-249/93-24 on 930817-1006 & Nov.First Violation Shows Another Example of Failure to Apply Proper Safety Focus on Emergent Issues
ML17179B179
Person / Time
Site: Dresden  
Issue date: 11/04/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Lyster M
COMMONWEALTH EDISON CO.
Shared Package
ML17179B180 List:
References
NUDOCS 9311160114
Download: ML17179B179 (3)


See also: IR 05000237/1993024

Text

- - - - - -

Docket Nos.

50-237; 50-249

License Nos. DPR-19; DPR-25

Commonwealth Edison Company

Nov

4 1993

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-237/93024;

50-249/93024)

ATTN:

M. Lyster

Dresden Site Vice President

Dresden Nuclear Power Station

6500 North Dresden Road

-

Morris, IL

60450

Dear Mr. Lyster:

This refers to the inspection conducted by M. Leach, M. Peck, A. M. Stone,

M. Bielby, D. Chyu, and T. Tella of this office, and by R. Zuffa of the

Illinois Department of Nuclear Safety, on August 17 through October 6, 1993.

The inspection included a review of activities authorized for your Dresden

Nuclear Station, Units 2 and 3, facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The first violation was cited for failure to take

adequate corrective actions to re-establish train separation in the

containment cooling service water system.

This violation is of concern

because it is another example of a failure to apply proper safety focus on

emergent issues.

The second violation was cited for failure to perform

required licensed operator medical evaluations.

This violation is of concern

because it represents a failure to follow requirements after multiple prior

notifications on this issue .

..

, ,,.1

15 ~ !~ !~". (

9311160114 931104

PDR

ADOCK 05000237

G

PDR

~Gil I

J*

NOV

4 1993

Commonwealth Edison Company

2

During this inspection, certain other of your activities appeared to be in

violation of NRC requirements.

The non-cited violation described in paragraph

Sb of the enclosed inspection report was categorized as Severity Level IV.

The criteria specified in Section VII.B of the "General Statement of Policy

and Procedures for NRC Enforcement Actions," (Enforcement Policy,

10 CFR Part 2, Appendix C), were satisfied.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No.

50-237/93024(DRP);

No.

50-249/93024(DRP)

See Attached Distribution

RIII

~;}..*

Hiland

\\0( J. '\\ j'i .,

~ton

lo/tpi r~~

Sincerely,

Edward G. Greenman, Director

Division of Reactor Projects

Gfa 'r)

RII~

)}

Commonwealth Edison Company

cc w/enclosures:

L. DelGeorge, Vice President, Nuclear

Oversight & Regulatory Services

G. Spedl, Station Manager

J. Shields, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory Services

Manager

. .OC/LFDCB

Resident Inspectors, Dresden

LaSalle, Quad Cities, Clinton

R. Hubbard

J. Mccaffrey, Chief, Public

Utilities Division

R. Newmann, Office of Public

Counsel, State of Illinois Center

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce Commission

J. B. Martin, RIII

H. J. Miller, RIII

T. 0. Martin, RIII

J. E. Dyer, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

S. Stasek, SRI, Davis Besse

bee:

PUBLIC (IEOI)

3

NOV

4 1993