Docket No.
S0-237; 50*249 /r/.~J$
License No~ DPR-19; DPR~25 *
Cormnonwealth Edison Company
ATIN:
Mr. L. 0. DelGeo*rge
DEC 3 1 1992
Vice President, Nuclear Oversight
- and Regulatory Servic.es
Executive Towers West HI
. 1400 Opus Pl ace Suite 300 *
Downers Grove, IL 60515
Dear Mr~ DelGeorge:
.
.
.
- This refers to the inspection conducted by w.* Rogers, M. Peck, A: M. Stone,
and P. Lougheed of this office; and by R. Zuffa of the 11 linoi s Department of .
Nuclear Safety, ori November 10 through December 15,- 1992.
The inspection *
included a review of activities authorized f9ryour Dresden Nuclear Station,
)
.
Units 2 and 3. At the* conclusion of the inspection, the findings were .
- .
discussed with those members of your staff identified in* the enclosed report.
- * Areas examined during the inspection are identified in the report. Within
these*areas,.the inspection consisted of selective examinations of procedures
and represent~tive records, interviews w~th personnel, and observation of**
activities in progress.
During thi~ inspection, certain of your activities appeared to be in violation
of NRC requirements, as sp~cified in the enclosed Notice of Violation *
(Notite).
- *
-
Also during this inspection, certain of your activit~es appeared t6 be in
violation of NRC requirements. However, as described in the enclosed
inspection report, the violations are not being cited because the criteria
specified in Section VII.B.2 of the "General Statement of Policy and
Procedures for*NRC Enforcement Actions," (Enforcement Policy, 10 CFR Part 2,
Appendix C) were satisfied. .
. You are.required to.respond to this letter and should follow-the instructions
- sp~cified in the encldsed Notice when preparing yout response. * In your
response, you ~hould dotum~nt the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing*your response to this
Notice, jncl~ding your proposed corrective actions and. the results of future
inspections, the NRC wi 11 determine whether further NRC enforce_ment action is
. necessary to ensure compliance with NRC regulatory requirements.
.
.*
in accordance: with 10 CFR 2.790 of the CormniSsion~s regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
'9301120014 92123i
.
. 'PDR
ADOCK 05000237---- *
.
G.
.
. -**
-
~* ... -::.,
- , .. .
- .. '
...
'-:#
~i
.... -
1;: . -_:;;:~~
u
Commo~wealth Edison
2
The responses di~ected by this letter and the *accomp~nying Notice are not
subject to the clearance pn>cedures of the Offic~ of Management and Budget as
required by.*the Paperwork Reduction Act of 1980; Pt 96-511.
'
'
- We will gladly discuss any que*stions you have concerning this inspection~
Enclo~ures:
2.
Inspection Report
No.
50-237/92032{DRP);- .
No. * 50-249/92032{DRP)
M. Lyster, Site Vice President
J. Shields~ Regulatory Assur~nce
Supervisor
-
D. Farrar, Nuclear Regulatory
Services Manager
DCD/DBC {RIDS)
OC/LFDCB
Resident Inspectors: Dresden,
Clinton, LaSalle, Quad Cities
R. Hubbard .
J.McCaffrey; Chief, Publi-c
Utilities Division.
R. Newmann, Office of Public
-counsel, State of Illinois Center
T. Ortciger, State Liaison Officer
C~ Paperiello, Rill
..
B. Berson, RAO
. T. Ma rt i n , R II I
C. Pederson, Rill
M. Jordan, Riii
S. Stasek, SRI, Davis Besse
J. Dyer, NRR
B. Siegel, NRR
R. Hall, NRR
R~J_17
_ R~I~ _ _ ~I~
R~~fsite ~iland
--l?ch macher
NO .o..
... 4"\\6 .<>-
-
Sincerely,*