UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-237 and 50-249 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West I II 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
December 17, 1992
SUBJECT:
SAFETY EVALUATION (SE) OF THE INSERVICE TESTING PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES, DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (TAC NOS. M82898 AND M82899)
In a letter dated February 28, 1992, you submitted your updated inservice testing (IST) program for the third ten-year interval for the Dresden Nuclear Power Station, Units 2 and 3.
The interval is from March 1, 1992, to February 28, 2002.
A Safety Evaluation (SE) concerning eleven of the relief requests was transmitted to you in a letter dated September 11, 1992.
The staff's SE of the remaining reliefs requested in your February 28, 1992, submittal is included as Enclosure 1.
Title 10 of the Code of Federal Regulations, Section 50.55a, requires that inservice testing of certain ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda, except where alternatives are authorized or relief is granted by the Commission pursuant to paragraphs (a)(3)(i),
(a)(3)(ii), or (f)(6)(i).
In order to obtain authoriiation or relief, the licensee must demonstrate that (1) the proposed alternatives provide an acceptable level of quality and safety, (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, or (3) conformance is impractical for its facility.
Guidance on acceptable alternatives to Section XI requirements was provided by NRC in Generic Letter {GL) 89-04 for certain aspects of IST.
The NRC technical staff, with technical assistance from EG&G Idaho, Inc.
(EG&G}, has reviewed the information concerning the IST program relief requests submitted for Dresden.
The staff adopts the evaluations and conclusions contained in the attached Technical Evaluation Report (TER) prepared by EG&G, except as specified in the SE.
Table 1 of the SE presents a summary of the relief request determinations for your February 28, 1992, submittal.
The staff is granting relief from certain testing requirements that are impractical to perform and authorizing proposed alternatives where compliance
~t\\'"/)/ IJ would result in a hardship without a compensating increase in safety or where (Y
7
~ 'r
~
2 4 0 0 4 2 fr)nµ>>m rrr1 17 (1-:"'='-"""*-_,~,
1
~11"} I mlf.Mr;it[,,,
t:i~Hr.1 1:('
- r'l'=>ff~1-1 r.J1 1,,'--;.;
f!:f~-:r:-"':Dr:r "1l9
,----9-3oio5o237-9212i7-- ------ -----
~~l:l'-'t' u ULbb *.!JU,.,1.1\\J u t£..ur1 t!D~]jJS 1 {j*
PDR ADOCK 05000237
'\\\\
p PDR
Mr. Thomas J. Kovach Commonwealth Edison Company cc:
Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. C. Schroeder Plant Manager Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station 6500 North Dresden Road Morris, Illinois 60450-9766 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Dresden Nuclear Power Station Unit Nos. 2 and 3
Mr. Thomas December 17, 1992 the alternative testing provides an acceptable level of quality and safety.
The IST program relief requests for Dresden in the February 28, 1992, submittal are acceptable for implementation provided (1) the anomalies identified in Appendix A are addressed within one year of the date of this SE, and (2) the procedural or program changes covered in the anomalies are completed within one year of the date of this SE, or by the end of the next refueling outage, whichever is later, or by the schedule specified in Section 2.2 if required.
The granting of relief or authorization of alternatives is based upon the fulfillment of any commitments made by you in the basis for each relief request and the alternatives proposed.
Program changes involving new or revised requests for relief or authorization of alternatives should not be implemented prior to approval by the NRC.
New or revised requests that meet the positions in GL 89-04, Attachment 1, should be submitted to the NRC but can be implemented.provided the guidance in GL 89-04, Section D, is followed.
Program changes that add or delete components from the IST program should also be provided to the NRC staff.
This action completes the staff's technical review of this issue. If you have any questions or require clarification of the staff's SE or the contractors TER, please contact Byron Siegel, the Dresden Project Manager.
Enclosure:
Sincerely, Original signed by John F. Stang for:
James E. Dyer, Director Project Directorate III-2 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation Safety Evaluation w/attachments cc w/enclosure:
See next page DISTRIBUTION:
Docket File TMurley/FMiraglia TKing CMoore BClayton, Riii ACRS(IO)
GGrant, 17G21
~~-2 W\\192 NRC & Local PDRs JPartlow JDyer OGC GHil l (8)
POii 1-2 p/f PDIII-2 r/f JRoe BSiegel EJordan OPA OC/LF.DCB PM/PD~
BSiegel:
,,, /Jl1/9
~
~ [,J-.4 l J
~£;
ft/
, -Z-./,992 '*r /92
~c)~p~