NOTICE OF DEVIATION Commonwealth Edison Company Dresden Station, Units 2 and 3 Doc~et Nos:.
50-237; 50-249 _
License Nos. DPR-19; DPR-25 During an NRC inspection conducted on S-eptember-16 through November 9, 1992, a
- deviation of your commitment to augment plant operator training to address motor operated valve coricerns was id~ntified. In accordance with the "General Statement of Policy ~nd Procedure for NRC Enforcement Actions,"
10 CFR Part 2, A~peridix C (1992), the deviation is listed below~
The respon~e to Generic Letter 89~1~, Supplement 3, "Consideraiion bf the Results of NRC Sponsored Test and Motor Operated Valves,"' dated March 11, 1991, stated a number bf moto~ operated valves had been determined.to be deficient.
Included in the response was a plant specific Safety Assessment verifying generic safety assessments, performed by the NRC and the BWR Owner Groµp, were applicable to Dresden. - Item 3 of the Safety Assessment, "Conduct
. of Training," stated plant operator training would be au~mented to address the motor operated valve concerns; including discussions regarding the potential for incomplete closure of the subject motor operated valv~s.
. Contrary to the above, as of October 10, 1992, the stated plant operator training was not perfotmed.
Please provide to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C. 20555, wit~ a copy to the Regional Admi ni"strator, Region I II, and a copy to the NRC Resident Inspector, it1 _ * -
writing within 30 days of the date of this Notice, the reasons for the deviation, th~ corrective st~ps which have been taken and the results achieved, the corrective steps which will be taken to avoid fu~ther deviations, and the date whe~ your corrective action will be completed.
Where good cause is shown, consideration will be given to extending the response time.
_Dated. at Glen Ellyn, Illinois this / 8 day_.of November 1992.
. - Brent Clayton, cChief Reactor Projects Branch 1.