Notice of Violation from Insp on 920303-0410.Violation Noted:On 920211,operator Performed Activity Affecting Quality,Placement of Lock on Electrical Breaker for Containment Isolation Valve,W/O Documented Instruction
ML17177A391
Person / Time
Site: Dresden  
Issue date: 05/06/1992
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17177A390 List:
References
50-237-92-05, 50-237-92-5, 50-249-92-05, 50-249-92-5, NUDOCS 9205150073
Download: ML17177A391 (2)


Text

NOTICE OF VIOLATION Commonwealth Edison Company Dresden Nuclear Power Station Dock~t Nos. 50-237;. 50-24~.

License Nos.

DPR~l9; DPR-25 Du~ing ah NRC inspection conducted o~ March 3, through April 10, 1992, a

-vi-olation of NRC requirements was identified.

In accordance with the "General Statement* of Policy and Procedures for NRC Enforcement Action," 10 CFR Part 2, Appendix C (1~92), the violation is listed below:

10 CFR 50 Appendix B, Criterion V, '"Procedures, Instructions, and Drawings,"

. requires, in part, that activities affecting quality shall. be prescr1bed by documented instructions, procedures, or drawings arid shall be accomplished in

  • accordance with these* instructions, procedures, or d_rawi ngs.

Contrary-to the above:

a.

On February. 11, 1992, an operator perfor~ed an activity affecting quality, placement* of a Tock on the electrical breaker for ~ontainment isolation valve 2-13~1-l,* without a documented instruction or pfocedur2.

b.

As of February 11, 1992, OAP 07-32,_ "Routine Plant Testing Activities,'.'

a procedure g6verning activittes affecting qualjty, did not prescribe.

any measures.to indicate the status of cqmpon~nts tested under its administrative co~trol.

c.

On April 4, 1992, personnel failed to accomplish an activity affecting quality in accordance with a prescribed procedure in that critical dr~wing M-359 was not updated to r~flect installation of temporary instrumentation within one day of installation as stated ~n OAP 07-04 Step F. L,f ( 5 )..

d.

As of March 8; 1992, the Unit Operators Daily.Surveillance Log, was

  • inadequate in that it failed to prescribe checking of air samples for reactor coolant leakage in accordance with Technjcal Specification 4.6.D, an activity affecting quality; although it was the ~rocedure designated to meet the surveill~nce requirements.
e.

On March 7,* 1992, operators failed to accomplish an activity affecting.

quality in accordance with a prescribed procedure in that*the diesel generator was not opefated loaded for five minutes as required by step 1.7.a of DOS 6600-03, "Bus.Undervoltage And ECCS Int~grated Functional Test For Unit 2/3 Diesel Ge.nerator (Unit 3 Test Only)".

This is a Severity Level IV violation (Supplement I).

  • Pursuant to the provisions of 10 CFR 2.201, Commonwealth Edison is hereby required to submit a written statement or explanation to the U.S. Nuclear Regul at_ory Cammi ss ion, _ATTN:,_DocumenL,Contro l Desk; Washington*; 0-;' C-:-.. ~20555 with a copy to the U. S. Nuclear Regulatory Commission, Region III, 79~

Roosevelt Road~ Glen* Ellyn, Illinois, 60137, and a copy to the NRC Resident

. Inspector at the Dresden station, within 30 days of the date of the letter 9205150073 920506 PDR ADOCK 05000237 G

PDR

transmitting thi~ Notice of Viol~tiori (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and *should.include for each violation:

(1) the reason for the violation, or, if contested~ the basis for disputing the violation, (2) the corrective steps that have been taken and the results achi~ved, (3) the correctiv~ steps that will be taken to avoid furth~r violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in thi.s Notice, an order may* be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as m~y be proper should not be.

taken.

Where good ciuse is shown, consideration will be given to extending the tesponse time.

Dated at Glen Ellyn; Illinois.

this 6th day of Mayj 1992

~

\\,,J@~ L,,..

£,A l3'rent Clayton~.

V. Reactor Projects Branch 1. *