Forwards Safety Evaluation Re Rev 4 to Inservice Testing Program for Pumps & Valves.Rev Acceptable
ML17177A346
Person / Time
Site: Dresden  
Issue date: 04/02/1992
From: Barrett R
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
Shared Package
ML17177A347 List:
References
TAC-M81165, TAC-M81166, NUDOCS 9204090397
Download: ML17177A346 (3)


Text

Docket Nos. 50-237 and 50-249 Mr. Thomas J. Kovach UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 2, 1992 Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West I II 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Kovach:

SUBJECT:

SAFETY EVALUATION RELATED TO*REVISION 4 OF THE INSERVICE TESTING PROGRAM FOR DRESDEN, UNITS 2 AND 3 (TAC NOS. M81165 AND M81166)

The staff issued a Safety Evaluation* (SE) for Dresden's inservice testing (IST) program for pumps and valves on July 25, 1990.

The SE contained fifteen items which Commonwealth Edison Company (CECo) was requested to address within a specific period of time.

Your responses to all of the items were contained in two submittals, identified as Revision 4 to your IST program, dated July 17, 1991, and October 4, 1991.

The staff has reviewed CECo's responses to the items and the results of this review are provided in the enclosed SE.

Relief is granted as indicated in the SE.

The staff has determined in granting these relief requests, pursuant to 10 CFR 50.55a(a)(3)(i) and (g)(6)(i), that the proposed alternative testing would provide an acceptable level of quality and safety, or that the ASME Code requirements at issue are*

impractical for your facility. The staff has further determined that the relief granted is authorized by law and will* not endanger life or property or the common defense and security and is otherwise in the public interest.

You should comply with the relief as stated in the SE, and respond to any items as requested.

The staff has not received your submittal for the third ten-year interval which began on March 1, 1992.

However, the items discussed in the enclosed SE should be included in the revised program submittal for the third ten-year interval. For Pump Relief Request PR-7, an interim period of one year from the date of this letter has been approved to allow you time to further investigate and P.rovide information on the acceptability of the vibration absolute limits for the high pressure coolant injection pumps.

This interim period may apply into the third ten-year interval, if necessary. Otherwise, the granting of relief for the second ten-year interval expired February 29, 1992.

For the ~evised IST program, for the third ten-year interval, CECo is requested to provide the NRC staff with a description of the process used in j}J~

developing the IST program.

The submittal should include, as a minimum, details of the documents used, the method of determining if a component

~~~ rime f~U ~tEwium ~oPY I

/

9204090397 920402 PDR ADOCK 05000237 p..

PDR

OFC NAME DATE Mr. Thomas Apri 1 2, 1992 requires inservice testing, the basis for the testing required, the basis for categorizing valves, and the method or process used for maintaining the program current with design modifications or other activities performed under 10 CFR 50.59. This information should be included with the program submittal and should not be longer than 2 to 4 pages.

Enclosure:

Safety Evaluation.

cc w/enclosure:

See next page DISTRIBUTION:

Docket File NRC & Local PDRs PDIII-2 r/f B. Boger J. Zwolinski R. Barrett B. Siegel C. Moore OGC. 15Bl8 C. Regan 7Cl6 P. Campbell 7023 ACRS(lO) P-315 PD Pl ant File B. C*l ayton RI II E. Jordan G. Hill (8)

OC/LFMB I PM: POI 11-2 I J, /Z1 /92 Sincerely, Original signed by:

Richard ~- Barrett Richard J. Barrett, Director Project Directorate I 11-2.. **

.Division of Rea<;:tor* ProJ~cts - III/IV/V Office of N~clea~*R~actor Regulation

(..

~. '*

E

~

.1' I

l

\\

IOG 1-r 1../'t1J/

1 'f"" /\\..I 92 Official Document Record

\\

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. C. Schroeder Plant Manager Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Gl~n Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public.Couns*el State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Dresden Nuclear Power Station Unit Nos. 2 and 3

\\