ML17174B134
| ML17174B134 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 02/10/1992 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17174B135 | List: |
| References | |
| NUDOCS 9202180027 | |
| Download: ML17174B134 (2) | |
See also: IR 05000237/1991036
Text
- \\,~(f"lt'll"'l\\"1,
NM ,lt ll'"t( ,~M (Tt' T'
~ .
UNITED STATES
NUCLEAR REGULATORY COMMISSION
Docket No. 50-237
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Opus West II I
1400 Opus Place
Downers Grove, IL
60515
Dear Mr Reed:
REGION Ill
799 ROOSEVELT ROAD
GLEN ELLVN, ILLINOIS 60137
FEB 1 0 199Z
This refers to the special safety inspection conducted by W. Rogers, M. Peck,
and M. Huber of this office on October 20, 1991, through January 14, 1992.
This inspection included a review of activities at the Dresden Nuclear Power
Station, Unit 2, as authorized by NRC Operating License No. DPR-19.
At the
conclusion of the inspection, our findings were discussed with Mr.
C. Schroeder and those members of your staff identified in the enclosed
report.
Areas examined during the inspection are identified in the report.
Specifically, we examined the circumstances surrounding the Unit 2 reactor
recirculation discharge valve failure to close. This failure rendered the low
pressure coolant injection system inoperable.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
- ~ &:£ --
.
Brent Cl~~' Chief
r
Reactor Projects Branch 1
Enclosure:
Inspection Report
No. 50-237/91036(DRP)
See Attached-Di sirfbuYi on
j
9202180027 920210
ADOCK 0500023_7 __ --*- _____ _
Q
'
Commonwealth Edison Company
cc w/enclosure:
D. Galle, Vice President - BWR
Operations
T. Kovach; Nuclear Licensing
Manager
Dresden Station Manager
DCD/DCB (RIDS)
OC/LFDCB
.
Resident Inspectors Dresden,
LaSalle, Quad Cities
R. *Hubbard
J. Mccaffrey, Chief, Public
Utilities Division
R. Newmann, Office of Public
Counsel, State of Illinois Center
Licensing Project Manager, NRR
C. J. Paperiello
2
FEB 1 0 1992