Forwards Insp Repts 50-237/91-31 & 50-249/91-34 on 911020-1206.No Violations Noted.Concern Shown Re Replacement of Primary Containment Isolation Sys Relays
ML17174B080
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/26/1991
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17174B081 List:
References
NUDOCS 9201070008
Download: ML17174B080 (2)


See also: IR 05000237/1991031

Text

~p.R REG(JL _.

UNITED STATES

c,'-

'"'i>-

(¥-..

o;}

NUCLEAR REGULATORY COMMISSION

REGION Ill

0

....

'Y i; .

..,

. "

  • 799 ROOSEVELT ROAD

GLEN ELLYN,.ILLINOIS 60137

"+-

o'

/)

~

. **** ..

Docket No. 50-237

Docket No. 50-249

Co:mlnonwealth Edison Company

ATTN:

Mr. Cordell Reed

Senior Vice President

Opus West III

1400 Opus Place

Downers Grove, IL

60515

Dear Mr. Reed:.

This refers to the routine safety inspection conducted by

W. Rogers, D.*Hills and M. Peck of this office and assisted by

R. Zuffa of the Illinois Department of Nuclear Safety on

October 20.through December 6, 1991, of activities at.Dresden

Nuclear Power Station, Units 2 and 3 authorized by NRC Operating

License Nos. DPR-19 and DPR-25 and to the discussion of our

findings with Mr. c. Schroeder and others at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection..

Within these areas, the

inspection consisted of a selective examination of procedures and

representative records, observations, and interviews with

personnel.

As discussed in section 3.f of the report, the inspectors had

specific questions concerning the replacement of primary

containment isolation system relays.

These questions are

considered an open item *. In section 7.d of the report, the

inspectors discussed licensee identified cable separation

requirements that were not met and the need for a licensee's

operability evaluation.

The operability evaluation is considered

unresolved.

We request that you respond within 60 *days of the

date of this. letter to the questions identified in section* 3.f

and provide an operability evaluation as addressed in section

7.d.

No violations of NRC requirements were identified during the

course of this inspection.

In accordance with 10 C.FR 2. 7~0, of the *Commission's regulations,**

a copy of this letter and the enclosure(s) will be placed in the

NRC Public Document Room.

9201070008 911226

PDR

ADOCK 05000237

G

PDR

commonwealth Edison Company

2

DEC 2* .6 1991

We will* gladly discuss any questions you have concerning this

inspection.

Enclosure:

Inspection Reports

No. 50-237/91031(DRP); and

No.

50-249/~-1034 (DRP)

cc w/enclosure:

D. Galle, Vice President -

B~

Operations

T. Kovach, Nuclear

Licensing Manager

c. W. *Schroeder, Station Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

.

J. w~ Mccaffrey, Chief, Public

  • Utilities Division

Robert Newmann, Off ice of Public

Counsel, State of Illinois Center

Licensing Project Manager, NRR

C~ J. Paperiello, RIII

lJ(ht

Brent Clayton, Chief

Reactor Projects Branch 1