Ack Receipt of Util Re Participation in Implementation of Emergency Response Data Sys (ERDS) at Plants.Erds Links at Stations Considered Operational & Should Be Implemented in Emergency Response Planning
ML17174A955
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 10/28/1991
From: Spessard R
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Kovach T
COMMONWEALTH EDISON CO.
References
NUDOCS 9111110372
Download: ML17174A955 (8)


Text

...

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 Docket No. 50-454, 455 50-456, 457 50-237, 249 50-373, 374 50-254, 265 50-295, 304 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company Suite 300 OPUS West III 1400 OPUS Place Downers Grove, IL 60515

Dear Mr. Kovach:

October 28, 1991 In a letter from Mr. Cordell Reed to Mr. E. L. Jordan dated April 20, 1989, the Commonwealth Edison Company volunteered to participate in the

  • implementation of the Emergency Response Data System (EROS) at your facilities. Since that time, the efforts of your personnel in cooperation with our implementation contractor have resulted in the establishment of an EROS 1 ink at your Byron, Braidwood, Dresden, LaSalle, Quad Cities, and Zion power stations.

I have recently been informed that all operational testing of the EROS links at all CECO Units has been satisfactorily completed.

The EROS links at these stations are, therefore, considered operational and should be implemented in your emergency response planning as soon as possible.

Based upon discussions with Mr. Larry Duchek, we understand that configuration.control measures, as described in NUREG-1394, Revision 1, have been established to maintain the CECO plant data bases in EROS.

We also understand that Emergency Plan Implementing Procedures for EROS have been implemented at all CECO Stations and that CECO is prepared to utilize EROS to transmit emergency data as required by the recent change to 10 CFR 50.72. Since the EROS program implemented on your computers will not recognize a link termination message from the NRC EROS, it will be necessary to maintain personnel available to secure your EROS feed, whenever it is in use, upon request from the NRC.

A comprehensive plan to conduct quarterly testing for all EROS participants is being developed.

You will be notified of these testing requirements in the near future.

As part of the routine inspection program, the regional staff may monitor your participation in the EROS program.

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Mr. William P. Poirier, Director Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 3SS, Bay 236 West Pittsburgh, Pennsylvan1a 1S230 Joseph Gallo, Esq.

Hopkins and Sutter 888 16th Street, N. W.

Suite 700 Washington, D.C. 20006 Ms. Bridget Little Rorem Appleseed Coordinator 117 North Linden Street Essex, Illinois 6093S Mr. Edward R. Crass Nuclear Safeguards and Licensing Division Sargent & Lundy Engineers SS.East Monroe Street Chicago, Illinois 60603 U. S. Nuclear Regulatory Commission Resident Inspectors Office RR #1 Box 79 Braceville, Illinois 60407 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, Illinois 60434 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Braidwood Station Unit Nos. 1 and 2 Ms. Lorraine Creek Rt 1, Box 182 Manteno, Illinois 609SO Douglass Cassel, Esq.

17 East Monroe Street, Suite 212 Chicago, IL 60603 Mr. Ron Stephens Illinois Emergency Services and Disaster Agency 110 East Adams Street Springfield, Illinois 62706 Michael Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 George L. Edgar Newman & Holtzinger, P.C.

161S L Street, N.W.

Washington, D.C. 20036 Attorney General SOO South 2nd Street Springfield, Illinois 62701

Springfield, Illinois, 62704 Commonwealth Edison Company Braidwood Station Manager Rt. 1, Box 84 Braceville, Illinois 60407

Mr. Thomas J. Kovach Conunonwealth Edison Company cc:

Mr. William P. Poirier, Director

  • Westinghouse Electric Corporation*

Energy Systems Business Unit Post Office Box 355, Bay 236 West Pittsburgh, Pennsylvania 15230 Michael Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mrs. Phillip B. Johnson 1907 Stratford Lane

. Rockford, Illinois 61107 Ms. Lorraine Creek Rt. 1, Box 182 Manteno, Illinois 60950 Mr. Edward R. Crass Nuclear Safeguards & Licensing Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 U *. s. Nuclear Regulatory Conmission Byron/Resident Inspectors Office 4448 North German Church Offices Byron, Illinois 61010 EIS Review Coordinator Environmental Protection Agency Region V 230 S. Dearborn Street Chicago, Illinois 60604 Commonwealth Edison Company Byron Station Manager 4450 North German Church Road Byron, Illinois 61010 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Byron Station Unit Nos. 1 and 2 Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois, 62704 Joseph Gallo, Esq.

Hopkins and Sutter 888 16th Street, N.W.

Suite 700 Washington, D.C. 20006 Douglass Cassel, Esq.

17 East Monroe Street Suite 212 Chicago, Illinois 60603 Attorney General 500 South 2nd Street Springfield, Illinois 62701 Chairman, Ogle County Board Post Office Box 357 Oregon, Illinois 61061

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Dresden Nuclear Power Station Unit Nos. 2 and 3

Mr. Thomas J. Kovach.

Commonwealth Edison Company cc:

Phillip P. Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Assistant Attorney General 100 West Randolph Street Suite 12 Chicago, Illinois 60601 Resident Inspector/LaSalle, NPS U.S. Nuclear Regulatory Conunission Rural Route No. 1 P. 0. Box 224 Marseilles, Illinoi~ 61341 Chairman LaSalle County Board of Supervisors LaSalle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 62701 Chairman Illinois Commerce Commission Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III U. s. Nuclear Regulatory Conunission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 LaSalle County Station Unit Nos. 1 and 2 Robert Cushing Chief, Public Utilities Division Illinois Attorney General's Office 100 West Randolph Street Chicago, Illinois 60601 Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. G. Diederich LaSalle Station Manager LaSalle County Station Rural Route 1 P. 0. Box 220 Marseilles, IL 61341

Mr. Thomas J. Kovach ColTDTlonwealth Edison Company cc:

Mr. Stephen E. Shelton Vice President Iowa-Illinois Gas and Electric Company P. 0. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Conunission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock.Is 1 and County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Quad Cities Nuclear Power Station Unit Nos. 1 and 2

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Zion Nuclear Power Station Unit Nos. 1 and 2

¢.

1-

,; At this time, I would. like to recognize the efforts of Mr. Larry Duchek, Ms. Jean Crispler, and Ms. Wendy Kuo.

Their assistance and cooperation throughout the implementation was invaluable to the successful completion of the project.

cc:

T. LaRosa J. Crispler L. Duchek W. Kuo See next page DISTRIBUTION:

  • ELJordan JJolicoeur MTaylor, DEDO BBuckley BLSiege l
  • RLSpessard NRC PDR DCS RLSpessard LNOlshan Sincerely, Original signed by:

R. Lee Spessard, Director Division of Operational Assessment Office for Analysis and Evaluation IRB R/F DOA R/F JPartlow JHufham CPPatel of Ope rational _Assessment JHickman DFRo~s RHWessman RPriebe (Loeal-PDR:JLEngl e RMPulsifer AHHsia IR~D JRJolicoeur:pw

V / 7191 IRB!.

.AEOD RFP 10/?" 91 fr D:DOA:AEOD RLSpessard

~ lc1~/91