ML17174A836
| ML17174A836 | |
| Person / Time | |
|---|---|
| Site: | Dresden, 05000349 |
| Issue date: | 08/01/1991 |
| From: | Siegel B Office of Nuclear Reactor Regulation |
| To: | Kovach T COMMONWEALTH EDISON CO. |
| References | |
| GL-88-01, GL-88-1, TAC-80352, TAC-80353, NUDOCS 9108090144 | |
| Download: ML17174A836 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-237 and 50-249 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West II I 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
August l, 1991
SUBJECT:
REPLACEMENT OF REACTOR WATER CLEANUP (RWCU) PIPING IN RESPONSE TO GENERIC LETTER 88-01, DRESDEN, UNITS 2 AND 3 (TAC NOS. 80352 AND 80353)
In the staff safety evaluation of your responses to Generic Letter 88-01 transmitted in a letter dated August 23, 1990, the staff requested that Commonwealth Edison Company (CECo) modify the Inservice Inspection Program for Dresden, Units 2 and 3, to address RWCU piping outboard of the isolation valves.
In your letter dated April 29, 1991, you indicated that CECo is pursuing replacement, rather than inspection, of the subject RWCU system piping for each unit over a two refueling outage period in accordance with the following schedule:
Unit 2 -
Refueling outage following completion of cycle 14 (Spring 1994)
Refueling outage following completion of cycle 15 (Fall 1995)
Unit 3 -
Refueling outage following completion of cycle 13 (Spring 1993)
Refueling outage following completion of cycle 14 (Fall 1994)
In your letter it was also stated that the subject RWCU piping would not be inspected prior to replacement.
The staff has reviewed your response and determined that replacement of the RWCU system piping outboard of the isolation valves goes well beyond the requirements contained in the staff's safety evaluation of your response to Generic Letter 88-01.
We have also concluded since you have committed to this replacement program, there is no need to perform inspections prior to replacement and that the schedule for replacement over two refueling outages, as stated above for Dresden 2 and 3, is acceptable.
As previously discussed with you, the staff requests that four (4) welds in the piping to be replaced, be ultrasonically tested (UT) either before or after removal from Dresden 3 during the refueling outage following completion of cycle 13.
The welds to be examined should not be chemically decontaminated either before or after examination, if possible.' It is also requested that the UT results be provided to the staff prior to disposal of the sections of the piping examined.
9108090144. 910801 !
PDR. A DOCK. 05000237 ;
- I
~
- PDR, i
I
Mr~ Thomas You should inform the Commission in writing if any significant changes in
.your estimated completion schedule should occur, and when the replacement of this piping has been completed and the system is fully operational.
Should CECo decide not to replace the RWCU piping, an inspection program should be developed and initiated starting with the next refueling outage for each unit.
cc:
See next page*
DJSTRIBUTION
- Docket Fi-1e~*p-y_37 NRC & Local PDRs*
PD II I-2 r/f B. Boger J. Zwolinski C. Moore B.
~iegel OGc* 15 B 18 E. Jordan MNBB 1701.
- ACRS(lO)
P-315 PO Plant File.
W. Shafer Rill
- ' j Sincerely, Orig_inaf Sig~ed By:
Byron *L~ ~ieg~l~ Project Manager Project Directo~ate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulatfori.
~~.
~
'. t..
~*... '"*',.
.. ~
\\
./"
~--. '
e
'.~ (. -
- ~ *,,
~. :. '*
- ~
~*
... _. -** ~.:
Mr. Thomas J. Kovach Commonwealth Edison Company cc:
Michael I. Miller, Esq.
Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman_
Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Dresden Nuclear Power Station Unit Nos. 2 and 3