Forwards IE Insp Rept 50-237/79-05 on 790329-30 & 0411-13.No Noncompliance Noted
ML17173A930
Person / Time
Site: Dresden Constellation icon.png
Issue date: 04/25/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML17173A931 List:
References
NUDOCS 7906250165
Download: ML17173A930 (2)


See also: IR 05000237/1979005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

Docket No. 50-237

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

APR 2 5 1979

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. 0. Box 767

Chicago, IL

60690

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this

office on March 29-30 and April 11-12, 1979, at the site and to

the followup inspection on April 13, 1979, at the Corporate Office

of Sargent and Lundy Engineers, of activities at Dresden Nuclear

Power Station, Unit 2, authorized by NRC Operating License No.

DPR-19 and to the discussion of our findings with Mr. B. B. Stephenson

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

,,- ---~., ..

'.~ .

'

---,-

7906250//,~

COSllOnvealtb Edison

Company

- 2 -

APR 2 5 1979

We will gladly discuss any questions you have concernil:lg this

inapection.

Enclosure:

IE Inspection

Keport No. 50-237/79-05

cc v/encl:

Mr. B. B. Stephenson, Station

Superintendent

Contral 111011

Reproduction Unit NR.C 20b

PDR

Local PDR

RSIC

TIC

Anthony Roisman, Esq.,

Attorney

Mr. Dean Hansell, Office of

Assistant Attorney General

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

OFFICE ... _R_lll __ l~-~ ___ _

_Ju.n ____ L..71

-~ __ JH1J.~-- --~~-~----- ---------------- -------------*

B~kijt u

Yin/bk.

nanielson

Fiorelli

---~------------- ---------------- -------------*

SURNAME ...

DAT ... -~f_~'}f_Z~-------

NRC Form 3188 (Rm) (l-78) NRCM 0240

  • U. 5. GOVERNMENT PRINTING OFFICE: 197B-253*8l7