LER-1978-063, Forwards LER 78-063/03L-0 |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2371978063R00 - NRC Website |
|
text
..
-._..A"'
Commonv9th Edison Dresden Nuclear Power Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 REGULATORY DOCl\\ET FILE COPY December 19, 1978 BBS Ltr. #78-1582 James G. Keppler, Regional Director Directorate of Regulatory Operations - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Reportable Occurrence Report /,178-063/03L-0, Docket f/050._237 is hereby submitted to your office in. accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(b), conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting condition for operation.
Dresden BBS/deb Enclosure cc:
Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC
. ~~(\\
7 8 1 2 2 7 0..(> ~_f 4
~***
.**::* *:~; -~*-
- .-::~:~~.:::~:~:-:.~:.*_-.
- :;..,,.:. -,.-. -. ".., *., **.;,_.-::;-=-;:.*-'.s-.-..._"";.~-.-"'-.,..,.; *.* _....._.* _Ti'.:-.-~;,..~~'.....~...,..-""7"--F*"?-"":~~~--,.*..,.....,......,,_.. **-
...--~""**..._..=***.--:'~*-
(***u~*-o* :" :'*-:'7'~.--r-..., ~-**o*..,..,-. -,,........,,,.. -.1"*;
-~""':-.'>;-'-"*.;,._'.,._....,._. :,,._, *-d:;-"'.r-""'*-~...,_....~~** ~' * *"-- * *-.*.*,..-*\\0.-.o***.~-*,.~:*'""'".~
... -***--. ---,.--..,-----~----*--,*-*-=-.-~~-..:-.....
-:.. ':'::* -* ~.
i-,JRCcfUi~:\\*l 3UG i',.77.. -"'r-.~
. e LICENSEE EVENT REPORT CONTROL BLOCK:
I, IQ 6
-~
(P.LEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
- - l-o-1-Ll-1--I-1-L-1-D-1-RJ_sJ 2 l.@I o I o I -I o ! o I o I o ! o ! -! o_J_QJE)l 4 ! 1 ! 1 I 1 ! 1 I G)I ! I 0 7
s 9
LICENSEE CODE 14 15*
LIC!:NSE NUM8ER 25 21r Ll"CENSE TYPE. JO
- - s?-G-A~-58 CON'T
~
7 8
~;~~~~ L!d© I o I 5 I o I o I o I 2 I 3 I 1 181 1 11 I 2 I 3 I 1 1 s IG) I 1 I 2 I 1 l 9 ! 1 I s I G).
60 61
.DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE BO EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
!During normal surveillance testing of MSIV closure time; MSIV 2-203-lA closed in C2::IIJ I 5.6 seconds and MSIV 2-203-lC closed in 2.8 seconds after the initiation signal, which I
[§]~]I did not meet T.S. Table 3. 7.D.2 limits of 3 </c T </=5 sec. Event was of minimal ITIIJ 1safety significance because other MSIV closure times were within T.S. limits and
[]JI] 1valves did close.
This event has occurred several times before at Dresden, most
((DJ I recently referenced under R.. O :. ti 50-249 I 7 8-54.
(Iill 7
B 9 SYSTE~.'l CODE I c ID I@
9 10
CAUSE
CAUSE CODE SUB CODE COMPONENT CODE
~@ ~@ I v I A I LI v I EI x I@
11 12 13 SEQUENTIAL REPORT NO.
I o I 6 I 3 /
- 18.
OCCURRENCE CODE Io I 3 I 23 24 26 27 28 29 COMP.
SUB CODE Ll:J@
19 REPORT TYPE
~
30 VALVE SUBCODE w@
20 31 PRIME COMP.
REVISION NO. w 32 COMPONENT 80 ACTION FUTURE EFFECT SHUTDOWN
(,;:;\\
- ATTACHMENT TAKEN ACTION ON PLANT METHOD HOURS '23J SUBMITTED NPR0-4 FORM SUB.
SUPPL! ER MANUFACTURER l!_l@l_U@ UJ@ L£J *I o Io I o I o I LJ!J@
33 34 35 36 37 40 41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS I c I 6. I 6 I 5 I@
44
. 47 WC§ 42
.. w 43 MSIV 2-203~1A and 2-203-lC valve timing was out of ~~d~j~u~s~t~m~e~.n~t~*~~A~f~t=e~r_m.:.:=inor adjust-ment to speed control ~alves, MSIV 2-203-lA closed pr6perly in 4.2 sec.
Reyiew of historical closing times for MSIV's indicates that minimal time variations occur D:IIJ / infrequently because of wear and heat* of drywell environment.
Valves will be in-r;-r:4l I spected during next refueling outage per DMP 233,
__J
~
~__:'---~~~~.:::'.-_.;:.:_:_~~~-=~~~~-:.:::.!:.-=c::::......-=-~---'~~~~~~~--~~---
8 9
FACILITY h()\\
METHOD OF
~
ST;\\TUS
% POWER OTHER STATUS ~ DISCOVERY DISCOVERY DESCRIPTION '2_V.
~
W@ I 0 I 5 I 2 l@~I _N=A~-----.IJ. W@~I
-~0:.i::P.=..er~a"'-"t~o-=-r.....:O~b~s=-er~v~a~t.=:io~n~-------1 8
9 1 0 12 11 44 45 46 ACTIVITY CONTENT f:::::\\
RELEASED OF RELEASE AMOUNT OF ACTIVITY
~
L?J@) ~@._I
-=NA:__ ____
8 9
10 11 PERSONNEL EXPOSURES
_ Q..
NUMBER TYPE
DESCRIPTION
GJIJ 1 o 1 o 1 o J@w@..___-____ N=A-=----------,---------------------
8 9
11 12 13 PERSONNEL INJURIES
(,;"';\\
NUMBER DESCRIPTION6
NA 8
9 11
~12~~~~~~~~~~~:.!.-~~~~~~~~~~~~~~~~~~~~~~~~~~~---J80 LOSS OF OR DAMAGE TO FACILITY t;j3'\\
TYPE
DESCRIPTION
'<:.:;J CQ2J W@
80 80 LOCATION OF RELEASE @
44 45 NA 80 80 NA 8
9 10 PUBLIC! TY
(:;:\\
ISSUED DESCRIPTION W
- NRC USE ONL y ITliJ we NA I I I I I I I I I I I I J ~.
r/. 8;~'2~ 't d:~,7i/;c~'~i;'ri;i~EJ~i:~~ht;;;,£~;,;;~,~j§:,:2: i::~+,:,.* ;";~~: '. ~;9.';':.* :.f,£\\f;i,,. ;,c:;;,~~'d 1-;~
80
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000249/LER-1978-001, /03L-0 for Dresden 3 Regarding the Discovery IRM Nos. 15 and 16 to Trip at 109% | /03L-0 for Dresden 3 Regarding the Discovery IRM Nos. 15 and 16 to Trip at 109% | | | 05000237/LER-1978-002-01, /01T-0:on 780105,during Normal operation,locked- Open Suction Valve to Standby Liquid Injection Pumps Were Found Closed.Cause Unknown.Monthly Verification Has Been Added to Surveillance DOS 1100-1 | /01T-0:on 780105,during Normal operation,locked- Open Suction Valve to Standby Liquid Injection Pumps Were Found Closed.Cause Unknown.Monthly Verification Has Been Added to Surveillance DOS 1100-1 | | | 05000249/LER-1978-002, /03L-0 for Dresden 3 Regarding the Failure of MO-3-1501-5C to Reopen While Performing DOS 1500-1. the Motor Oper. Suction Valve to C LPCI Pp. Closed But Could Not Be Reopened from Control Room | /03L-0 for Dresden 3 Regarding the Failure of MO-3-1501-5C to Reopen While Performing DOS 1500-1. the Motor Oper. Suction Valve to C LPCI Pp. Closed But Could Not Be Reopened from Control Room | | | 05000249/LER-1978-003, /01T-0 for Dresden 3 Regarding Discovery of Containment Valve Leakages in Excess of Technical Specification 4.7.A Limits | /01T-0 for Dresden 3 Regarding Discovery of Containment Valve Leakages in Excess of Technical Specification 4.7.A Limits | | | 05000237/LER-1978-003, /03L-0 for Dresden, Unit 2 Re Inadequacies in the Implementation of Administrative or Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection Systems | /03L-0 for Dresden, Unit 2 Re Inadequacies in the Implementation of Administrative or Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection Systems | | | 05000237/LER-1978-004-01, T-0 for Dresden, Unit 2 Re Improper 125V DC Cable Separation | T-0 for Dresden, Unit 2 Re Improper 125V DC Cable Separation | | | 05000249/LER-1978-005, /03L-0 for Dresden 3 Regarding the Discovery of a Pin Hole Leak in Minimum Flow Line from 3B Reactor Feedwater Pump Line 3-3205B-6 | /03L-0 for Dresden 3 Regarding the Discovery of a Pin Hole Leak in Minimum Flow Line from 3B Reactor Feedwater Pump Line 3-3205B-6 | | | 05000237/LER-1978-005, /03L-0 for Dresden Unit 2 Regarding the Receipt of a Torus High/Low Level Alarm as a Result of Torus Level Transmitter Instrument Drift | /03L-0 for Dresden Unit 2 Regarding the Receipt of a Torus High/Low Level Alarm as a Result of Torus Level Transmitter Instrument Drift | | | 05000249/LER-1978-006, /03L-0 for Dresden 3 Regarding the Discovery of Vacuum Breaker 1601-32F Binding | /03L-0 for Dresden 3 Regarding the Discovery of Vacuum Breaker 1601-32F Binding | | | 05000010/LER-1978-007, Cancelled | Cancelled | | | 05000249/LER-1978-007, /03L-0 for Dresden 3 Regarding Dis 2300-6 HPCI Area Temperature SW 2371 a Tripped at 284.3 Degrees Fahrenheit | /03L-0 for Dresden 3 Regarding Dis 2300-6 HPCI Area Temperature SW 2371 a Tripped at 284.3 Degrees Fahrenheit | | | 05000249/LER-1978-009-01, /01X-1 on 780320:Cracks Found on end-to-pipe Weld on CRD Return Line.Caused by Intermittent to Low Cooling Water Flow Leaving the CRD Nozzle.Pipe Was Removed & Replaced. (Encl to 7809180035) | /01X-1 on 780320:Cracks Found on end-to-pipe Weld on CRD Return Line.Caused by Intermittent to Low Cooling Water Flow Leaving the CRD Nozzle.Pipe Was Removed & Replaced. (Encl to 7809180035) | | | 05000010/LER-1978-009, Cancelled | Cancelled | | | 05000249/LER-1978-009, /01T-0 for Dresden 3 Regarding an Ultrasonic Inspection of the Safe End-To-Pipe Weld on the CRD Return Line Revealed Indications Which Suggested Cracking | /01T-0 for Dresden 3 Regarding an Ultrasonic Inspection of the Safe End-To-Pipe Weld on the CRD Return Line Revealed Indications Which Suggested Cracking | | | 05000237/LER-1978-009, /01T-0 for Dresden Unit 2 Regarding an Occurrence of a Conductivity Transient Due to Condensate Demineralizer Resin Introduction Into the Rx Vessel | /01T-0 for Dresden Unit 2 Regarding an Occurrence of a Conductivity Transient Due to Condensate Demineralizer Resin Introduction Into the Rx Vessel | | | 05000249/LER-1978-010, /01T-0 for Dresden 3 Regarding Discovery of 6 Hydraulic Snubbers Nos. 18, 19, 20, and 33 in Unit 3 Drywell and Nos. 1 and 3 in Isolation Condenser Pipeway with Less than Required Amount of Fluid | /01T-0 for Dresden 3 Regarding Discovery of 6 Hydraulic Snubbers Nos. 18, 19, 20, and 33 in Unit 3 Drywell and Nos. 1 and 3 in Isolation Condenser Pipeway with Less than Required Amount of Fluid | | | 05000249/LER-1978-011, /01T-0 for Dresden 3 Regarding Cracks Identified in Cladding of CRD Nozzle Inner Radius and Vessel Wall Beneath Nozzle | /01T-0 for Dresden 3 Regarding Cracks Identified in Cladding of CRD Nozzle Inner Radius and Vessel Wall Beneath Nozzle | | | 05000249/LER-1978-012, /01T-0 for Dresden 3 Regarding Disclosure of One Apparent Crack-Like Indication on the 330 Degrees Feedwater Sparger Along with Several Indications on the CRD Nozzle Thermal Sleeve Retainer | /01T-0 for Dresden 3 Regarding Disclosure of One Apparent Crack-Like Indication on the 330 Degrees Feedwater Sparger Along with Several Indications on the CRD Nozzle Thermal Sleeve Retainer | | | 05000249/LER-1978-013, /01T-0 for Dresden 3 Regarding Setpoints Being Set High by 10% During the Quarterly Scheduled Calibration Dis 1700-1 | /01T-0 for Dresden 3 Regarding Setpoints Being Set High by 10% During the Quarterly Scheduled Calibration Dis 1700-1 | | | 05000249/LER-1978-014, /01T-0 for Dresden 3 Regarding 24/48 Vdc Battery Failure to Pass the Refueling Outage Discharge Test | /01T-0 for Dresden 3 Regarding 24/48 Vdc Battery Failure to Pass the Refueling Outage Discharge Test | | | 05000249/LER-1978-015, /03L-0 for Dresden 3 Regarding Discovery of One Snubber in Drywell to Be Functionally Inoperable by Bench Test During Inspection to Check 10% of All Hydraulic Snubbers During Refueling | /03L-0 for Dresden 3 Regarding Discovery of One Snubber in Drywell to Be Functionally Inoperable by Bench Test During Inspection to Check 10% of All Hydraulic Snubbers During Refueling | | | 05000237/LER-1978-015-03, /03X-1 on 770402:CRD L-5 Uncoupled & Overtraveled When W/Drawn to Pos 48.Caused by Unlatched Inner Filter & Abnormally Long Uncoupling Rod.Procedure Rev & QA Coverage Improved to Prevent Future CRD Uncouplings | /03X-1 on 770402:CRD L-5 Uncoupled & Overtraveled When W/Drawn to Pos 48.Caused by Unlatched Inner Filter & Abnormally Long Uncoupling Rod.Procedure Rev & QA Coverage Improved to Prevent Future CRD Uncouplings | | | 05000249/LER-1978-016, /03L-0 for Dresden 3 Regarding Leakage Through Standby Liquid Control Check Valve 3-1101-15 Exceeding the T.S.4.7.A Limit for Single Valve Leakage of 29.38 Scfh | /03L-0 for Dresden 3 Regarding Leakage Through Standby Liquid Control Check Valve 3-1101-15 Exceeding the T.S.4.7.A Limit for Single Valve Leakage of 29.38 Scfh | | | 05000249/LER-1978-017, /01T-0 for Dresden 3 Regarding an NRC Request That Immediate Action Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suction Va | /01T-0 for Dresden 3 Regarding an NRC Request That Immediate Action Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suction Valves | | | 05000249/LER-1978-018, /03L-0 for Dresden 3 Regarding the Discovery of U3 Diesel Oil Storage Tank at 9000 Gal. Which Is Below the 10000 Gal. Limit Required by Technical Specification 3.9.c | /03L-0 for Dresden 3 Regarding the Discovery of U3 Diesel Oil Storage Tank at 9000 Gal. Which Is Below the 10000 Gal. Limit Required by Technical Specification 3.9.c | | | 05000249/LER-1978-019, /03L-0 for Dresden 3 Regarding the Discovery of Ps 504C and 504D Found to Trip at 403 PSI and 405 PSI Respectively | /03L-0 for Dresden 3 Regarding the Discovery of Ps 504C and 504D Found to Trip at 403 PSI and 405 PSI Respectively | | | 05000237/LER-1978-020, /03X-01 for Dresden, Unit 1 Re Cause of Failure of the Diesel Generator to Start | /03X-01 for Dresden, Unit 1 Re Cause of Failure of the Diesel Generator to Start | | | 05000249/LER-1978-020, /03L-0 for Dresden 3 Regarding Discovery of Ps 3-203-3C Tripped at 1148 PSI Rx Pressure Incr | /03L-0 for Dresden 3 Regarding Discovery of Ps 3-203-3C Tripped at 1148 PSI Rx Pressure Incr | | | 05000249/LER-1978-022, /03L-0 for Dresden Unit 3 Regarding Discovery of High Flow Isolation Switches DPIS 261-2C, 261-2N, and 261-2S to Trip at Values Exceeding the Technical Specification Limit | /03L-0 for Dresden Unit 3 Regarding Discovery of High Flow Isolation Switches DPIS 261-2C, 261-2N, and 261-2S to Trip at Values Exceeding the Technical Specification Limit | | | 05000249/LER-1978-023, /01T-0 for Dresden Unit 3 Regarding Source Range Monitors 24 and 21 Being Declared Inoperable on 05/20/1978 | /01T-0 for Dresden Unit 3 Regarding Source Range Monitors 24 and 21 Being Declared Inoperable on 05/20/1978 | | | 05000249/LER-1978-024, /03L-0 for Dresden Unit 3 Regarding the Discovery of PS3-263-53A to Trip at 1178 PSI Which Is Above Technical Specifications | /03L-0 for Dresden Unit 3 Regarding the Discovery of PS3-263-53A to Trip at 1178 PSI Which Is Above Technical Specifications | | | 05000237/LER-1978-025-03, Re While Preforming LPCI and Ccsw Surveillance on Unit 3 Prior to Taking the U-3 D/G Out of Service, a Spike Was Found on the Liquid Process Radiation Monitor for the Service Water Discharge | Re While Preforming LPCI and Ccsw Surveillance on Unit 3 Prior to Taking the U-3 D/G Out of Service, a Spike Was Found on the Liquid Process Radiation Monitor for the Service Water Discharge | | | 05000010/LER-1978-025, Cancelled | Cancelled | | | 05000237/LER-1978-025, /03L-0 for Dresden Unit 3 Regarding Discovery of a Spike on the Liquid Process Radiation Monitor for the Service Water Discharge | /03L-0 for Dresden Unit 3 Regarding Discovery of a Spike on the Liquid Process Radiation Monitor for the Service Water Discharge | | | 05000237/LER-1978-026-03, Re While Performing LPCI Both Indicating Lights Went Out and the Motor Stopped | Re While Performing LPCI Both Indicating Lights Went Out and the Motor Stopped | | | 05000237/LER-1978-027, /03L for Dresden, Unit 2 Re a Sample Taken from Radwaste a WST at 1020 After the Tank Was Filled to 88% | /03L for Dresden, Unit 2 Re a Sample Taken from Radwaste a WST at 1020 After the Tank Was Filled to 88% | | | 05000010/LER-1978-028-03, /03L-0:on 780815,weekly Reactor Protection Sys Functional Operability Test Postponed But Not Rescheduled. Caused by Personnel Error.Personnel re-instructed Re Importance of Scheduled Surveillances.(Encl to 7809260056) | /03L-0:on 780815,weekly Reactor Protection Sys Functional Operability Test Postponed But Not Rescheduled. Caused by Personnel Error.Personnel re-instructed Re Importance of Scheduled Surveillances.(Encl to 7809260056) | | | 05000249/LER-1978-028-03, Re While Performing Surv. Dis 250-1, MSL Hi Flow Isolation Sw. Dpis 3-261-2c Tripped at 117 Psid | Re While Performing Surv. Dis 250-1, MSL Hi Flow Isolation Sw. Dpis 3-261-2c Tripped at 117 Psid | | | 05000237/LER-1978-028, /01X-1 for Dresden, Units 2 and 3 Re NRC Request for Immediate Actions to Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suct | /01X-1 for Dresden, Units 2 and 3 Re NRC Request for Immediate Actions to Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suction Valves | | | 05000010/LER-1978-028, Forwards LER 78-028/03L-0 | Forwards LER 78-028/03L-0 | | | 05000237/LER-1978-029-03, Re Safety Implications Were Minimal Because 1 or More Operable APRMs Per Channel Remained Available as Required by TS 3.2 | Re Safety Implications Were Minimal Because 1 or More Operable APRMs Per Channel Remained Available as Required by TS 3.2 | | | 05000237/LER-1978-030-01, /01X-1 on 780428:During Unit 2 Startup Opers, a LPCI & Core Spray Subsys Were Inadvertantly Rendered Inoper Because Personnel Had Closed LPCI Pump & Discharge Valves on Unit 2 Vice 3.(Encl to 7809180320) | /01X-1 on 780428:During Unit 2 Startup Opers, a LPCI & Core Spray Subsys Were Inadvertantly Rendered Inoper Because Personnel Had Closed LPCI Pump & Discharge Valves on Unit 2 Vice 3.(Encl to 7809180320) | | | 05000237/LER-1978-030, Forwards LER 78-030/01X-1 | Forwards LER 78-030/01X-1 | | | 05000237/LER-1978-031, /03L-0 for Dresden, Unit 2 Re PS-2-1430-1466C Failed to Operate | /03L-0 for Dresden, Unit 2 Re PS-2-1430-1466C Failed to Operate | | | 05000249/LER-1978-032-03, /03L on 780817:room Cooler Fans Failed to Start When Pumps 3B & 3C started.4KV Switchgear 33 & 34 Auxiliary Contacts Were Found Dirty.(Encl to 7809220129) | /03L on 780817:room Cooler Fans Failed to Start When Pumps 3B & 3C started.4KV Switchgear 33 & 34 Auxiliary Contacts Were Found Dirty.(Encl to 7809220129) | | | 05000249/LER-1978-032, Forwards LER 78-032/03L | Forwards LER 78-032/03L | | | 05000237/LER-1978-032, /03L-0 for Dresden, Unit 2 Re During Steady State Operation, Torus to Drywell Vacuum Breaker 2-1601-33E & F Were Found Inoperable During Routine Operability Surveillance | /03L-0 for Dresden, Unit 2 Re During Steady State Operation, Torus to Drywell Vacuum Breaker 2-1601-33E & F Were Found Inoperable During Routine Operability Surveillance | | | 05000010/LER-1978-033, Cancelled | Cancelled | | | 05000237/LER-1978-033, Forwards LER 78-033/03X-1 | Forwards LER 78-033/03X-1 | | | 05000237/LER-1978-033-03, /03X-1 on 780522:during Test Performed on U-2 D/G to Measure Overshoot & Overspeed Setpoint,The Diesel Tripped 4 Times Due to Overspeed Caused by Governor Speed Set Too High | /03X-1 on 780522:during Test Performed on U-2 D/G to Measure Overshoot & Overspeed Setpoint,The Diesel Tripped 4 Times Due to Overspeed Caused by Governor Speed Set Too High | |
|