Independent Spent Fuel Storage Installation - Revision 2 to the Permanently Defueled Emergency Action Levels and Revisions to the Permanently Defueled Emergency Plan Implementing Procedures
ML17173A187
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/19/2017
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML17173A187 (2)


Text

~VI SOUTHERN CALIFORNIA

~EDISON Albert E. Bates Manager, Regulatory Affairs &

An EDISON INTERNATIONAL Company Nuclear Oversight June 19, 2017 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revision 2 to the Permanently Defueled Emergency Action Levels and Revisions to the Permanently Defueled Emergency Plan Implementing Procedures, San Onofre Nuclear Generating Station (SONGS), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q), Southern California Edison (SCE) has revised the Permanently Defueled Emergency Action Level Technical Basis Document and two Permanently Defueled Emergency Plan Implementing Procedures (EPIPs) for the San Onofre Nuclear Generating Station (SONGS). This letter serves as the report required by 10 CFR 50.54(q)(5) and 10 CFR 50 Appendix E Section V.

SCE has determined that the changes do not reduce the effectiveness of the Permanently Defueled Emergency Plan (PDEP) or Permanently Defueled EPIPs, and the PDEP, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E (as exempted).

Attachment 1 of this letter transmits Revision 2 of the SONGS Permanently Defueled Emergency Action Level Technical Basis Document effective May 30, 2017.

Attachment 2 provides a report and analysis summary of the Permanently Defueled Emergency Action Level changes.

Attachment 3 of this letter provides a copy of the following revised Permanently Defueled Emergency Plan Implementing Procedures:

fl-Xi+5 A)f\A5S DI fl) rv/ 5 5 Llo t0 ((_f<-

P.O. Box 128 tJrvf S~

San Clemente, CA 92672

Document Control Desk June 19, 2017 Procedure Rev. Effective Date S0123-Vlll-ADMJN-3, EMERGENCY PREPAREDNESS PROGRAM 1 05/18/2017 DRILL DEVELOPMENT AND EVALUATION S0123-Vlll-ER0-1, PDEP STANDARDS AND EXPECTATIONS 1 05/18/2017 provides a report and analysis summary of the Permanently Defueled EPIP changes.

There are no commitments contained in this letter or its attachments.

If you have any questions or require additional information please contact me at (949) 368-6945.

Sincerely, GltC-Attachments: 1. SONGS Permanently Defueled Emergency Action Levels- Revision 2

2. Report and Analysis Summary of Permanently Defueled Emergency Action Level Changes
3. Revised Permanently Defueled Emergency Plan Implementing Procedures
4. Report and Analysis Summary of Permanently Defueled Emergency Plan Implementing Procedures Changes cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 3)

K. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, San Onofre ISFSI