ML17165A037

From kanterella
Jump to navigation Jump to search
Amends 183 & 157 to Licenses NPF-14 & NPF-22,respectively, Modifing Sses,Units 1 & 2 TS Limiting Condition for operation,3.8.3 & SR 3.8.3.1,to Increase Minimum Fuel Oil Storage Tank Volume Ranges
ML17165A037
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/07/1999
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17165A038 List:
References
NUDOCS 9907190212
Download: ML17165A037 (17)


Text

gy,R RE00 (4

Cg Cy ClO

~0

+w*w+

UNITED STATES NUCLEAR REGuLA.'ORY COMMISSION WASHINGTON, D.C. 20555-0001 PPRL INC.

ALLEGHENYELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 183 License No. NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by PP8L, Inc., dated November 23, 1998,

'omplies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9907i902i2 990707 PDR ADQCK 05000387

p pDR

I ~

2 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows (2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 183 and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. PP&L shall operate the facilityin accordance with the Technical Specifications and the Environmental Protection Plan 3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days after its date of issuance FOR THE NUCLEAR REGULATORYCOMMISSION S. Singh Bajwa, Chief,Section I

Project Directorate I

Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

gu] y 7, f 999

\\

ATTACHMENTTO LICENSE AMENDMENTNO.

FACILITYOPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages.

The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE 3.8-20 3.8-22 INSERT 3.8-20 3.8-22

'e II 0,qg

~A I

Diesel Fuel Oil, Lube il, and Starting Air 3.8.3

'.8

'ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystems shall be within limits for each required diesel generator (DG).

APPLICABILITY:

When associated DG is required to be OPERABLE.

ACTIONS

-NOTE Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more DGs with fuel oil level in associated storage tank < 47,570 gallons and > 41,018 gallons for DG A-D;

< 60,480 gallons and

> 52,340 gallons for DG E.

A.l Restore fuel oil level to within limits.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B.

One or more DGs with lube oil sump level not visible in the sight glass.

B.l Declare associated DG inoperable.

Immediately C.

One or more DGs with stored fuel oil total particulates not within limits.

C.l Restore stored fuel oil total particulates to within limits.

7 days (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-20 Amendment478, 183

2

Diesel Fuel Oil, Lube Oil. and Starting Air

~

~

3.8.3 ACTIONS (continued)

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains a 47,570 gallons for DG A-D; a 60.480 gallons for DG E.

31 days SR 3.8.3.2 Verify lube oil sump level is visible in the sight glass.

31 days SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of', the Diesel Fuel Oil Testing Program.

In accordance with the Diesel Fuel Oil Testing Program SR 3.8.3.4

-- -------------NOTE Not required to be met when DG is operating.

Verify each DG air start receiver pressure is a 240 psig.

31 days SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.

31 days SUSQUEHANNA - UNIT 1 TS / 3.8-22 Amendment

$ 78, 183

gPR R500

'o Cy O

lO h

Ql

~O

++*++

UNITED STATES NUCLEAR REGULATOF,'OMMISSION wAsHINGTQN, D.c. 2055&0001 PP8L INC.

ALLEGHENYELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 157 License No. NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the PP8L, Inc., dated November 23, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

f

'I

~

)

~,l f 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 157 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days after its date of issuance.

FOR THE NUCLEAR REGULATORYCOMMISSION S. Singh Bajwa, Chief,Section I

Project Directorate I

Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Dateof Issuance:

Ouly 7, 1999

4~'l'>

',~

4'

ATTACHMENTTO LICENSE AMENDMENTNO. 157 FACILITYOPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with attached revised pages.

The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE 3.8-23 3.8-25 INSERT 3.8-23 3.8-25

Diesel Fuel Oil, Lube il, and Starting Air 3.8.3

'.8 'LECTRICAL POWER SYSTENS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystems shall be within limits for each required diesel generator (DG).

APPLICABILITY:

When associated DG is required to be OPERABLE.

ACTIONS--------------------------------NOTE Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TINE A.

One or more DGs with fuel oil level in associated storage tank < 47,570 gallons and > 41,018 gallons for DG A-D;

< 60,480 gallons and

> 52,340 gallons for DG E.

A.1 Restore fuel oil level to within limits.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B.

One or more DGs with lube oil sump level not visible in the sight glass.

B.l Declare associated DG inoperable.

Immediately (continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-23 Amendment 1St, 157

Diesel Fuel Oil, Lub il, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains a 47,570 gallons for DG A-D; a 60,480 gallons for DG E.

31 days SR 3.8.3.2 Verify lube oil sump level is visible in the sight glass.

31 days SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of. the Diesel Fuel Oil Testing Program.

In accordance with the Diesel Fuel Oil Testing Program SR 3.8.3.4

-NOTE-Not required to be met when DG is operating.

Verify each DG air start receiver pressure is a 240 psig.

31 days SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.

31 days SUSQUEHANNA - UNIT 2 TS I 3.8-25 Amendmengs~,

167

~l 4 4 4'a 4.l QL~,

CPS kl,.

i, ".i